# AS9102 First Article Inspection Report (FAIR) Template with Sample

> Source: https://netray.co/tools/as9102-first-article-inspection-report-template
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A fill-in AS9102 FAIR with Forms 1, 2 and 3, pre-filled with a sample machined bracket so you can see how each field and characteristic row is completed.

## Category

aerospace-defense

## Industry

Aerospace & Defense

## Audience

- Quality engineer
- Machine shop owner
- Supplier quality

## Tool

**Kind:** template

**Output:** document

**Fields:**

#### Manufacturer name

**Key:** org

**Type:** text

**Default:** Acme Precision Machining Ltd

#### Supplier or CAGE code

**Key:** cage

**Type:** text

**Default:** 1ABC2

#### FAI report number

**Key:** fai_no

**Type:** text

**Default:** FAI-2026-0147

#### Part number

**Key:** part_no

**Type:** text

**Default:** BRK-48213-01

#### Part name

**Key:** part_name

**Type:** text

**Default:** Actuator Mounting Bracket

#### Serial or lot number

**Key:** serial

**Type:** text

**Default:** LOT 26-0912

#### Part revision level

**Key:** rev

**Type:** text

**Default:** C

#### Drawing number and revision

**Key:** dwg

**Type:** text

**Default:** DWG-48213 Rev C, Sheet 1 of 2

#### Purchase order number

**Key:** po

**Type:** text

**Default:** PO-770145

#### FAI type

**Key:** fai_type

**Type:** select

**Options:**

- Full FAI
- Partial (delta) FAI

**Default:** Full FAI

#### Reason for FAI

**Key:** fai_reason

**Type:** select

**Options:**

- New part number
- Engineering change
- Manufacturing process change
- Change of manufacturing location
- Lapse in production
- Tooling change

**Default:** New part number

#### Manufacturing process reference

**Key:** mfg_ref

**Type:** text

**Default:** Routing RT-48213 Rev B

#### Raw material and specification

**Key:** material

**Type:** text

**Default:** Aluminum 7075-T651 plate per AMS 4045, heat lot HL-55871

#### Special processes and process specification

**Key:** special

**Type:** textarea

**Default:** Anodize Type II, Class 2 per MIL-A-8625, supplier: Coastline Finishing (Nadcap accredited); cert CC-9931

#### Functional testing

**Key:** functional

**Type:** textarea

**Default:** Fit check to mating actuator housing FIX-102: pass. Leak test not applicable.

#### Report date

**Key:** date

**Type:** date

**Default:** 2026-10-20

#### Prepared by

**Key:** prepared

**Type:** text

**Default:** J. Alvarez, Quality Engineer

#### Characteristic 1 (balloon 1)

**Key:** c1

**Type:** text

**Default:** Overall length, 120.00 +/- 0.10 mm | Result: 120.04 | Gauge: caliper CAL-0231

#### Characteristic 2 (balloon 2)

**Key:** c2

**Type:** text

**Default:** Bore diameter, 25.00 +0.02/-0.00 mm | Result: 25.012 | Gauge: bore gauge CAL-0418

#### Characteristic 3 (balloon 3)

**Key:** c3

**Type:** text

**Default:** Surface finish, Ra 1.6 max | Result: Ra 1.1 | Gauge: profilometer CAL-0502

#### Characteristic 4 (balloon 4)

**Key:** c4

**Type:** text

**Default:** Hole position, 0.15 true position | Result: 0.09 | Gauge: CMM CAL-0007

#### Characteristic 5 (note 1)

**Key:** c5

**Type:** text

**Default:** Anodize Type II per specification | Result: certificate reviewed, conforms | Gauge: n/a

**Blocks:**

#### AS9102 First Article Inspection Report

**Body:** Manufacturer: {{org}}
Supplier / CAGE code: {{cage}}
FAI report number: {{fai_no}}
Report date: {{date}}
Prepared by: {{prepared}}

#### Form 1: Part Number Accountability

**Table:**

**Columns:**

- Field
- Entry

**Rows:**

**0:** Part number

**1:** {{part_no}}

**0:** Part name

**1:** {{part_name}}

**0:** Serial or lot number

**1:** {{serial}}

**0:** Part revision level

**1:** {{rev}}

**0:** Drawing number and revision

**1:** {{dwg}}

**0:** Purchase order number

**1:** {{po}}

**0:** FAI type

**1:** {{fai_type}}

**0:** Reason for FAI

**1:** {{fai_reason}}

**0:** Manufacturing process reference

**1:** {{mfg_ref}}

**0:** Assembly or detail part

**1:** Detail part

**0:** Nonconformance documented

**1:** None

#### Form 2: Product Accountability (Materials, Special Processes, Functional Testing)

**Table:**

**Columns:**

- Item
- Specification or detail
- Result

**Rows:**

**0:** Raw material

**1:** {{material}}

**2:** Certificate reviewed, conforms

**0:** Special process

**1:** {{special}}

**2:** Certificate reviewed, conforms

**0:** Functional testing

**1:** {{functional}}

**2:** See notes

#### Form 3: Characteristic Accountability, Verification and Compatibility Evaluation

**Table:**

**Columns:**

- Char No.
- Requirement, result and gauge
- Tooling type
- Accept / Reject

**Rows:**

**0:** 1

**1:** {{c1}}

**2:** Inspection

**3:** Accept

**0:** 2

**1:** {{c2}}

**2:** Inspection

**3:** Accept

**0:** 3

**1:** {{c3}}

**2:** Inspection

**3:** Accept

**0:** 4

**1:** {{c4}}

**2:** Inspection

**3:** Accept

**0:** 5

**1:** {{c5}}

**2:** Document review

**3:** Accept

**0:** 6

**0:** 7

**0:** 8

#### Notes and Review

**Body:** Every drawing characteristic is ballooned and numbered on the drawing, and each balloon number appears once on Form 3. Include a copy of the ballooned drawing, the material and special process certificates, and the gauge calibration references with the report.

#### Approval

**Signatures:**

- Prepared by (Quality)
- Approved by (Quality manager)
- Customer review (if required)

**Notes:** This template follows the structure of AS9102 (Form 1 part number accountability, Form 2 product accountability, Form 3 characteristic accountability) and is not the official form. The sample is fictional. Check your customer's requirements, because many require their own form version or additional fields such as sampling or key characteristics. Add rows to Form 3 until every ballooned characteristic on the drawing is listed.

## Content

**Intro:** A first article inspection report, or FAIR, proves that a production process can make a part that meets every drawing and specification requirement. This template gives you the three AS9102 forms with a filled sample, so you can see how a real report reads and then replace the values with your own.

**Sections:**

#### How to use the template

**Body:** Change the sample values in the fields to your part. Form 1 identifies the part and the reason for the FAI. Form 2 records raw materials, special processes, and functional tests with their specifications and certificates. Form 3 lists every characteristic from the drawing, balloon by balloon, with the requirement, the measured result, the gauge used, and accept or reject. Preview the output, then export it to Word, PDF, or Excel and attach the ballooned drawing and certificates.

**Bullets:**

- Balloon every characteristic on the drawing, including notes and referenced specifications
- Report actual measured values, not just pass
- Identify the gauge and its calibration reference
- Use the production process, tooling, and operators for the FAI part

#### What the three forms record

**Body:** Form 1, part number accountability, identifies the part, drawing, and revision, the purchase order, the type of FAI (full or partial), and the reason. Form 2, product accountability, shows the raw material, the special processes, and the functional tests, with the specifications and the certificates that prove them. Form 3, characteristic accountability, shows that each drawing requirement was verified and compatible with the design. Together they give a customer one package that connects the part to its evidence.

#### Reading the sample

**Body:** The sample is a machined aluminum bracket. Characteristics 1 to 4 are dimensional with measured values and a gauge, and each is within its tolerance, so each is accepted. Characteristic 5 is a note requiring anodize, verified by reviewing the process certificate. A real report for a part like this typically has many more characteristics, often 20 to 100 or more, so extend the table. If any characteristic is out of tolerance, mark it reject, raise a nonconformance, and record its number on Form 3.

#### Common mistakes

**Body:** Frequent causes of rejected reports are missing characteristics, unballooned notes, wrong drawing revision, results entered without actual values, expired gauges, and a first article made with a prototype process instead of production. Also remember delta FAI: when a design, process, tool, or location changes, a partial FAI may be needed for the affected characteristics. Keep FAI records with the part number history and retain them as the customer requires.

**Cta:** If your drawings, inspection results, and nonconformance records already sit in an ERP or quality system, we can help assemble FAI packages from them on your own servers. Ask for an expert review.

**Faq:**

#### Is this an official AS9102 form?

**Answer:** No. It follows the structure and information required by AS9102 across Forms 1, 2 and 3, but it is not a copy of the standard's form. Some customers require their own version, so confirm before submitting.

#### Can I get the first article inspection report in Excel or Word?

**Answer:** Yes. Fill in the fields, then export the document to Word, PDF, or Excel. Use the Excel export if you want to extend Form 3 with many characteristics and add formulas for tolerance checks.

#### When is a full FAI required versus a partial one?

**Answer:** A full FAI is required for a new part number and may be required after major changes. A partial (delta) FAI covers only characteristics affected by a change, such as a drawing revision, a process or tooling change, a new location, or a long lapse in production.

#### How many characteristics should Form 3 include?

**Answer:** All of them: every dimension, tolerance, note, and referenced specification requirement on the drawing and its parts list. The count depends on the part. A simple bracket may have around 20, while a complex assembly may have hundreds.

## Search terms

first article inspection report template, first article inspection report template excel, first article inspection report template word, fai first article inspection template, as9102 first article inspection template, sample first article inspection report, example first article inspection report, as9102 first article inspection example, first article inspection report (fair), first article inspection report form

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
