# AS9102 Form 2 Product Accountability Template (Materials, Special Processes, Functional Testing)

> Source: https://netray.co/tools/as9102-form-2-product-accountability-template
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Fill in AS9102 Form 2 style product accountability records for raw materials, special processes and functional tests, then export a PDF or Word file.

## Category

aerospace-defense

## Industry

Aerospace

## Audience

- Quality engineer
- Supplier quality
- FAI coordinator

## Tool

**Kind:** template

**Output:** document

**Fields:**

#### Part number

**Key:** part_no

**Type:** text

**Default:** PN-48213-02

#### Part name

**Key:** part_name

**Type:** text

**Default:** Actuator Housing

#### Serial or lot number

**Key:** serial

**Type:** text

**Default:** FAI-0007

#### FAI report number

**Key:** fai_no

**Type:** text

**Default:** FAI-2026-0142

#### Material specification

**Key:** material_spec

**Type:** text

**Default:** AMS 4027 Aluminum Alloy 6061-T651 plate

#### Material supplier

**Key:** material_supplier

**Type:** text

**Default:** Northline Metals Inc

#### Material certificate or heat/lot number

**Key:** material_cert

**Type:** text

**Default:** Cert 88213 / Lot A7731

#### Special process

**Key:** process_name

**Type:** select

**Options:**

- Anodize
- Chemical conversion coating
- Heat treat
- Plating
- Welding
- Shot peen
- NDT penetrant
- Painting

**Default:** Anodize

#### Process specification

**Key:** process_spec

**Type:** text

**Default:** MIL-A-8625 Type II Class 1

#### Special process supplier

**Key:** process_supplier

**Type:** text

**Default:** Apex Finishing LLC

#### Customer or Nadcap approval status

**Key:** nadcap

**Type:** text

**Default:** Nadcap accredited for chemical processing, valid to 2027-03-31

#### Functional test performed

**Key:** func_test

**Type:** textarea

**Default:** Leak test at 1.5x operating pressure, 30 second hold, no visible leakage.

#### Functional test result

**Key:** func_result

**Type:** select

**Options:**

- Accepted
- Rejected
- Not applicable

**Default:** Accepted

#### Prepared by

**Key:** prepared

**Type:** text

**Default:** J. Rivera, Quality Engineer

#### Date

**Key:** date

**Type:** date

**Default:** 2026-10-20

**Blocks:**

#### Product Accountability: Materials, Special Processes and Functional Testing

**Body:** Part number: {{part_no}}
Part name: {{part_name}}
Serial or lot: {{serial}}
FAI report number: {{fai_no}}

#### Raw Materials and Purchased Parts

**Table:**

**Columns:**

- Material or part
- Specification
- Supplier
- Certificate or lot
- Result

**Rows:**

**0:** Primary material

**1:** {{material_spec}}

**2:** {{material_supplier}}

**3:** {{material_cert}}

**4:** Conforms

#### Special Processes

**Table:**

**Columns:**

- Process
- Specification
- Supplier
- Approval status
- Certificate no.

**Rows:**

**0:** {{process_name}}

**1:** {{process_spec}}

**2:** {{process_supplier}}

**3:** {{nadcap}}

#### Functional Testing

**Body:** Test performed: {{func_test}}

Result: {{func_result}}

#### Sign-off

**Body:** Prepared by: {{prepared}}
Date: {{date}}

**Signatures:**

- Prepared by
- Quality approval

**Notes:** Field structure follows the purpose of AS9102 Form 2. This is a working template, not a reproduction of the standard. Always confirm the required layout and any customer-specific additions against your current copy of AS9102 and the purchase order.

## Content

**Intro:** AS9102 Form 2 is where a first article report proves the materials, special processes and functional tests behind the part. This template gives you the fields in a clean layout so you can fill, review and export without rebuilding a spreadsheet each time.

**Sections:**

#### How to use this template

**Body:** Enter the part identification at the top, then record each raw material, purchased component and special process used on the first article. Add the certificate or lot references that support each line. Use the table rows for extra materials or processes, then export to PDF for the FAI package or to Word if the customer wants edits. Keep the certificates themselves attached to the package as evidence.

**Bullets:**

- One row per material or purchased part
- One row per special process, including sub-tier suppliers
- Reference the cert number, not just the supplier name
- Record functional test acceptance criteria and the result

#### What Form 2 is meant to prove

**Body:** Form 1 identifies the part and Form 3 accounts for every drawing characteristic. Form 2 sits between them and answers a different question: did the right material go through the right approved processes, and did the part work when tested? An auditor or customer reviewer should be able to trace each line to a certificate and an approved source without asking you for more paperwork.

#### Special process approval details

**Body:** For processes such as anodize, heat treat, plating, welding and NDT, record the specification and the supplier approval status. Many primes require Nadcap accreditation or a direct customer approval for the process in question, so capture the scope and expiry date you verified. If the supplier's approval lapsed before the work was done, that is a nonconformance to raise before the report is released.

#### Common mistakes

**Body:** Most Form 2 rejections come from missing traceability rather than bad parts. Typical problems include a certificate that names a different specification revision, a process line with no supplier approval evidence, a functional test with no stated acceptance criteria, and sub-tier processes left off because the prime supplier did not mention them. Check each row against the purchase order flow-down before you sign.

**Cta:** If your ERP already holds material lots, supplier approvals and routing steps, Netray can help pull them into this form automatically instead of retyping them.

**Faq:**

#### Is this the official AS9102 form?

**Answer:** No. It is a working template that follows the structure and purpose of Form 2. AS9102 is published by the IAQG and distributed through SAE and national bodies, so confirm the required format and your customer's requirements against the current standard.

#### Do I need Form 2 for every first article?

**Answer:** Form 2 applies when the part uses designed or specified materials, special processes or functional testing. If a part has none of these, the form can be marked not applicable, but check with your customer because some require the form regardless.

#### Can I list several materials and processes?

**Answer:** Yes. Add as many rows as you need. Each material, purchased part, special process and test should have its own line with its own certificate reference so reviewers can trace it.

#### Does the output include my data on the server?

**Answer:** The template runs in your browser and exports directly, so what you type stays on your machine unless you choose to contact us.