# ATA Chapter Numbers Reference List

> Source: https://netray.co/tools/ata-chapter-numbers-reference-list
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Search every ATA chapter number and title used to organise aircraft maintenance manuals, task cards and parts catalogues.

## Category

aerospace-defense

## Industry

Aerospace MRO

## Audience

- MRO planner
- Maintenance records clerk
- Aviation ERP consultant

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### ATA chapter

**Key:** ata

**Type:** text

#### System title

**Key:** title

**Type:** text

#### Group

**Key:** group

**Type:** text

**Rows:**

#### Time Limits / Maintenance Checks

**Ata:** 05

**Group:** General

#### Dimensions and Areas

**Ata:** 06

**Group:** General

#### Lifting and Shoring

**Ata:** 07

**Group:** General

#### Leveling and Weighing

**Ata:** 08

**Group:** General

#### Towing and Taxiing

**Ata:** 09

**Group:** General

#### Parking, Mooring, Storage and Return to Service

**Ata:** 10

**Group:** General

#### Placards and Markings

**Ata:** 11

**Group:** General

#### Servicing

**Ata:** 12

**Group:** General

#### Vibration and Noise Analysis (Helicopter)

**Ata:** 18

**Group:** General

#### Standard Practices Airframe

**Ata:** 20

**Group:** General

#### Air Conditioning

**Ata:** 21

**Group:** Aircraft systems

#### Auto Flight

**Ata:** 22

**Group:** Aircraft systems

#### Communications

**Ata:** 23

**Group:** Aircraft systems

#### Electrical Power

**Ata:** 24

**Group:** Aircraft systems

#### Equipment / Furnishings

**Ata:** 25

**Group:** Aircraft systems

#### Fire Protection

**Ata:** 26

**Group:** Aircraft systems

#### Flight Controls

**Ata:** 27

**Group:** Aircraft systems

#### Fuel

**Ata:** 28

**Group:** Aircraft systems

#### Hydraulic Power

**Ata:** 29

**Group:** Aircraft systems

#### Ice and Rain Protection

**Ata:** 30

**Group:** Aircraft systems

#### Indicating / Recording Systems

**Ata:** 31

**Group:** Aircraft systems

#### Landing Gear

**Ata:** 32

**Group:** Aircraft systems

#### Lights

**Ata:** 33

**Group:** Aircraft systems

#### Navigation

**Ata:** 34

**Group:** Aircraft systems

#### Oxygen

**Ata:** 35

**Group:** Aircraft systems

#### Pneumatic

**Ata:** 36

**Group:** Aircraft systems

#### Vacuum

**Ata:** 37

**Group:** Aircraft systems

#### Water / Waste

**Ata:** 38

**Group:** Aircraft systems

#### Cabin Systems

**Ata:** 44

**Group:** Aircraft systems

#### Central Maintenance System

**Ata:** 45

**Group:** Aircraft systems

#### Information Systems

**Ata:** 46

**Group:** Aircraft systems

#### Nitrogen Generation System

**Ata:** 47

**Group:** Aircraft systems

#### Airborne Auxiliary Power

**Ata:** 49

**Group:** Aircraft systems

#### Standard Practices and Structures General

**Ata:** 51

**Group:** Structures

#### Doors

**Ata:** 52

**Group:** Structures

#### Fuselage

**Ata:** 53

**Group:** Structures

#### Nacelles / Pylons

**Ata:** 54

**Group:** Structures

#### Stabilizers

**Ata:** 55

**Group:** Structures

#### Windows

**Ata:** 56

**Group:** Structures

#### Wings

**Ata:** 57

**Group:** Structures

#### Standard Practices Propeller / Rotor

**Ata:** 60

**Group:** Propeller and rotor

#### Propellers / Propulsors

**Ata:** 61

**Group:** Propeller and rotor

#### Main Rotor(s)

**Ata:** 62

**Group:** Propeller and rotor

#### Main Rotor Drive(s)

**Ata:** 63

**Group:** Propeller and rotor

#### Tail Rotor

**Ata:** 64

**Group:** Propeller and rotor

#### Tail Rotor Drive

**Ata:** 65

**Group:** Propeller and rotor

#### Rotor Blade and Tail Pylon Folding

**Ata:** 66

**Group:** Propeller and rotor

#### Rotors Flight Control

**Ata:** 67

**Group:** Propeller and rotor

#### Power Plant

**Ata:** 71

**Group:** Power plant

#### Engine

**Ata:** 72

**Group:** Power plant

#### Engine Fuel and Control

**Ata:** 73

**Group:** Power plant

#### Ignition

**Ata:** 74

**Group:** Power plant

#### Air

**Ata:** 75

**Group:** Power plant

#### Engine Controls

**Ata:** 76

**Group:** Power plant

#### Engine Indicating

**Ata:** 77

**Group:** Power plant

#### Exhaust

**Ata:** 78

**Group:** Power plant

#### Oil

**Ata:** 79

**Group:** Power plant

#### Starting

**Ata:** 80

**Group:** Power plant

#### Turbines (Reciprocating Engines)

**Ata:** 81

**Group:** Power plant

#### Water Injection

**Ata:** 82

**Group:** Power plant

#### Accessory Gear Boxes (Engine Driven)

**Ata:** 83

**Group:** Power plant

#### Propulsion Augmentation

**Ata:** 84

**Group:** Power plant

#### Fuel Cell Systems

**Ata:** 85

**Group:** Power plant

**Notes:** Chapter numbers follow the ATA 100 / iSpec 2200 numbering used by most OEM manuals. Manufacturers add their own section and subject numbers below the chapter (the ATA 21-51-01 style). Always confirm titles against your OEM manual revision.

## Content

**Intro:** ATA chapter numbers are the common filing system for aircraft maintenance manuals, illustrated parts catalogues, task cards and defect reports. This searchable list gives the chapter number, the standard title and the group it belongs to.

**Sections:**

#### How to use the list

**Body:** Type a chapter number or a system word such as hydraulic or landing into the search box to filter the table. Use it when coding defects in your maintenance system, when sorting work package task cards by system, or when reading an unfamiliar OEM manual. Export to Excel to build a pick list for a defect coding screen, or to PDF to print a desk reference for the planning office.

**Bullets:**

- Search by number or by words in the title
- Group column separates systems, structures, propeller and rotor, and power plant
- Export keeps all 65 rows for use as a lookup tab

#### How the numbering is built

**Body:** A full ATA reference has three parts: chapter, section and subject, written as ATA 32-31-01. The chapter tells you the system (32 is landing gear), the section the sub-system (31 covers extension and retraction in many manuals) and the subject the individual unit or task. Only the two digit chapter is standardised across manufacturers. Section and subject numbers differ between OEMs and sometimes between models of the same OEM, so a code mapping built for one fleet should not be reused blindly for another.

#### Common mistakes and ERP notes

**Body:** The most common error is storing the ATA code as a number. Chapter 05 becomes 5 and no longer sorts or joins to the manual. Store it as a two character text field. A second error is mixing chapter level coding for reliability reports with section level coding for task cards in the same field. Most MRO and ERP systems let you hold the chapter, section and subject in separate columns, which makes defect trending by system far easier.

**Bullets:**

- Keep the leading zero
- Hold chapter, section and subject separately
- Gaps in the list (13 to 17, 39 to 43) are reserved or unused numbers, not missing data

**Cta:** If your defect and task data already carries ATA codes, we can build a read-only question layer over it so planners can ask for repeat defects by system in plain language.

**Faq:**

#### What does ATA stand for?

**Answer:** ATA stands for Air Transport Association of America, now Airlines for America. The ATA 100 specification created the chapter numbering, and it was later carried into the iSpec 2200 standard that most OEMs use for manuals and data exchange.

#### What is the difference between ATA 100 and iSpec 2200?

**Answer:** ATA 100 is the older specification for manual structure and numbering. iSpec 2200 replaced it and added digital data requirements, but it kept the same chapter numbers, so the list stays valid for both.

#### Which ATA chapters are engine related?

**Answer:** Chapters 71 to 85 cover the power plant. ATA 72 is the engine itself, 73 fuel and control, 79 oil and 80 starting. Chapter 49 covers the auxiliary power unit and 54 covers nacelles and pylons.

#### Are ATA codes the same for helicopters?

**Answer:** The chapter numbers are shared, with rotorcraft using 60 to 67 for rotors and drives and 18 for vibration analysis. Always check the manufacturer manual because section numbers vary.

## Search terms

ata chapter list, ata 100 chapters, ata chapter numbers, ata 21 ata 32 ata 72 meaning, aircraft system chapter codes, ata ispec 2200 chapters, ata chapter excel, mro ata codes

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
