# AWS Welding Symbols Reference (A2.4 Chart)

> Source: https://netray.co/tools/aws-welding-symbols-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Searchable lookup of the elements of a welding symbol: where each element sits, what it means and common reading mistakes.

## Category

industry-templates

## Industry

Welding & Fabrication

## Audience

- Welding engineer
- Fabrication shop
- Quality engineer
- Draftsman

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Symbol element

**Key:** element

**Type:** text

#### Meaning

**Key:** meaning

**Type:** text

#### Where it sits

**Key:** placement

**Type:** text

#### Reading note

**Key:** note

**Type:** text

**Rows:**

**Element:** Reference line

**Meaning:** Horizontal line that carries all weld information

**Placement:** Center of the whole symbol

**Note:** Always read from the reference line outward

**Element:** Arrow

**Meaning:** Points to the joint or member to be welded

**Placement:** Attached to one end of the reference line

**Note:** Defines which side is the arrow side

**Element:** Arrow side

**Meaning:** The side of the joint the arrow touches

**Placement:** Weld symbol BELOW the reference line

**Note:** Most common beginner mix-up

**Element:** Other side

**Meaning:** The side of the joint opposite the arrow

**Placement:** Weld symbol ABOVE the reference line

**Note:** Symbols on both sides mean welds on both sides

**Element:** Tail

**Meaning:** Carries process, specification, procedure or note

**Placement:** Fork at the end of the reference line opposite the arrow

**Note:** Omitted when no notes are needed

**Element:** Fillet weld symbol

**Meaning:** Fillet weld (triangle)

**Placement:** Triangle with its vertical leg always on the left

**Note:** Leg size is written on the left of the triangle

**Element:** Square groove symbol

**Meaning:** Square groove weld (two parallel lines)

**Placement:** On the reference line

**Note:** Root opening is written inside the symbol

**Element:** V groove symbol

**Meaning:** Single V groove weld

**Placement:** On the reference line

**Note:** Groove angle goes in the symbol, root opening inside

**Element:** Bevel groove symbol

**Meaning:** Single bevel groove weld

**Placement:** Vertical leg on the left, slanted leg on the right

**Note:** The arrow bends toward the member to be beveled

**Element:** U groove symbol

**Meaning:** Single U groove weld

**Placement:** On the reference line

**Note:** Radius and root face noted by dimensions

**Element:** J groove symbol

**Meaning:** Single J groove weld

**Placement:** On the reference line

**Note:** Arrow bends toward the grooved member

**Element:** Flare V groove symbol

**Meaning:** Flare V groove weld

**Placement:** On the reference line

**Note:** Used for rounded members such as tube or bar

**Element:** Plug or slot symbol

**Meaning:** Plug or slot weld (rectangle)

**Placement:** On the reference line

**Note:** Hole or slot size and pitch are dimensioned

**Element:** Spot weld symbol

**Meaning:** Spot weld (circle)

**Placement:** On or astride the reference line

**Note:** Diameter on the left, spacing on the right

**Element:** Seam weld symbol

**Meaning:** Seam weld (circle with two parallel lines)

**Placement:** On or astride the reference line

**Note:** Width on the left, length on the right

**Element:** Back or backing symbol

**Meaning:** Back weld or backing (arc shape)

**Placement:** Opposite side from the groove weld symbol

**Note:** Back weld is made after the groove weld

**Element:** Surfacing symbol

**Meaning:** Surfacing (overlay) weld

**Placement:** Below the reference line for arrow side

**Note:** Size gives the minimum overlay height

**Element:** Melt-through symbol

**Meaning:** Root penetration visible on the far side

**Placement:** Opposite the groove symbol, filled shape

**Note:** Height of reinforcement may be dimensioned

**Element:** Weld all around

**Meaning:** Weld continues around the whole joint

**Placement:** Circle at the junction of arrow and reference line

**Note:** Joint must be fully continuous or sequential

**Element:** Field weld

**Meaning:** Weld made at the installation site, not in the shop

**Placement:** Solid flag at the junction of arrow and reference line

**Note:** Flag usually points toward the tail

**Element:** Contour: flush

**Meaning:** Finish weld flush with the surface

**Placement:** Flat line over the weld symbol

**Note:** Add a finish letter for the method

**Element:** Contour: convex

**Meaning:** Finish weld with convex face

**Placement:** Convex arc over the weld symbol

**Note:** Default for most fillet welds

**Element:** Contour: concave

**Meaning:** Finish weld with concave face

**Placement:** Concave arc over the weld symbol

**Note:** Often specified for fatigue-loaded fillets

**Element:** Finish letters

**Meaning:** C chipping, G grinding, H hammering, M machining, P peening, R rolling

**Placement:** Next to the contour mark

**Note:** Indicates the method, not the surface roughness

**Element:** Length and pitch

**Meaning:** Intermittent weld: length then center-to-center pitch

**Placement:** Right of the weld symbol, such as 2-5

**Note:** 2-5 means 2 long segments every 5 center to center

**Element:** Dimension left of symbol

**Meaning:** Size: fillet leg or groove depth

**Placement:** Left of the weld symbol

**Note:** Applies to the side where the symbol sits

**Notes:** Based on the structure of AWS A2.4. ISO 2553 uses a dual reference line (solid plus dashed) and different placement rules, so check which standard the drawing cites.

## Content

**Intro:** A welding symbol packs the whole joint instruction into a few lines and shapes. This searchable chart explains each element of an AWS A2.4 symbol, where it sits and the mistakes that cause shops to weld the wrong side.

**Sections:**

#### How to use this chart

**Body:** Type a term such as fillet, field weld or arrow side into the search box to filter the rows. Read the Where it sits column first, because position carries most of the meaning in a welding symbol. The same triangle means a different weld depending on whether it is above or below the reference line. Export the filtered or full table to Excel or PDF for a shop-floor poster or a training handout.

#### The standard behind it

**Body:** AWS A2.4 defines the symbols for welding, brazing and nondestructive examination used on North American drawings. The reference line, arrow and tail form the skeleton, and basic weld symbols, supplementary symbols and dimensions hang from it in fixed positions. Dimensions to the left of a symbol are sizes, and dimensions to the right are lengths and pitches. ISO 2553 is the international equivalent and differs in the dashed identification line, so never mix the two without checking the drawing note.

#### Common reading mistakes

**Body:** Most rework traces back to a small set of misreadings that this table lets you check in seconds.

**Bullets:**

- Swapping arrow side and other side: below the line is the arrow side.
- Reading the fillet triangle backwards: the vertical leg is always on the left.
- Ignoring the tail, which may carry the WPS number or process.
- Treating 2-5 as a size instead of length and pitch.
- Missing the field weld flag on a shop drawing.

**Cta:** If drawings and WPS numbers live in your ERP or PLM, Netray can help you link weld symbols and procedures to routings so shops see the right instruction at the work center.

**Faq:**

#### Which side is the arrow side in a welding symbol?

**Answer:** The arrow side is the side of the joint the arrow touches. The weld symbol is placed below the reference line for the arrow side and above the line for the other side. If symbols appear on both sides, weld both sides.

#### What does a circle at the arrow bend mean?

**Answer:** A circle where the arrow meets the reference line means weld all around. The weld continues around the full joint, which may include several members. It does not apply to partial joints, so give the length explicitly there.

#### What is the difference between AWS and ISO welding symbols?

**Answer:** AWS A2.4 uses a single reference line and places the arrow side symbol below it. ISO 2553 uses a solid line plus a dashed identification line, and the arrow side symbol sits on the solid line side. Always check which standard the drawing cites.

#### Does the symbol tell me which welding process to use?

**Answer:** Only if a process abbreviation or WPS number is placed in the tail. If the tail is empty, the process comes from the contract, the applicable code or the shop procedure. Add the WPS reference to the tail to remove ambiguity.

## Search terms

welding symbols chart, AWS A2.4 welding symbols, how to read welding symbols, fillet weld symbol meaning, arrow side other side weld symbol, field weld symbol, weld all around symbol, welding symbol reference table

---