# BOM Explosion Requirements Worksheet

> Source: https://netray.co/tools/bom-explosion-requirements-worksheet
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Explode a bill of materials into component requirements, with quantity per, scrap allowance and extended cost for each line.

## Category

engineering-plm

## Audience

- Production planner
- Buyer
- Manufacturing engineer

## Tool

**Kind:** worksheet

**Mode:** editable

**Currency:** $

**Columns:**

#### BOM level

**Key:** level

**Type:** select

**Options:**

- 1
- 2
- 3
- 4

#### Component part number

**Key:** part

**Type:** text

#### Parent quantity required

**Key:** parent_req

**Type:** number

**Unit:** units

**Help:** How many of the parent assembly you need to build

#### Quantity per parent

**Key:** qty_per

**Type:** number

#### Scrap allowance

**Key:** scrap

**Type:** number

**Unit:** %

#### UoM

**Key:** uom

**Type:** select

**Options:**

- EA
- KG
- M
- L

#### Gross component requirement

**Key:** gross_req

**Type:** number

**Expr:** parent_req * qty_per * (1 + scrap / 100)

#### Unit cost

**Key:** cost

**Type:** number

**Format:** currency

#### Extended cost

**Key:** ext

**Type:** number

**Expr:** gross_req * cost

**Format:** currency

**Rows:**

**Level:** 1

**Part:** HSG-2001 Housing casting

**Parent req:** 50

**Qty per:** 1

**Scrap:** 2

**Uom:** EA

**Cost:** 18.4

**Level:** 1

**Part:** SHF-3100 Drive shaft

**Parent req:** 50

**Qty per:** 1

**Scrap:** 1

**Uom:** EA

**Cost:** 26.75

**Level:** 2

**Part:** BRG-6204 Bearing

**Parent req:** 50

**Qty per:** 2

**Scrap:** 0

**Uom:** EA

**Cost:** 3.2

**Level:** 2

**Part:** FST-M6x20 Screw

**Parent req:** 50

**Qty per:** 8

**Scrap:** 5

**Uom:** EA

**Cost:** 0.09

**Level:** 2

**Part:** GSK-4410 Gasket sheet

**Parent req:** 50

**Qty per:** 0.15

**Scrap:** 10

**Uom:** M

**Cost:** 12.5

**Level:** 1

**Part:** PNT-7001 Primer

**Parent req:** 50

**Qty per:** 0.2

**Scrap:** 15

**Uom:** L

**Cost:** 9.8

**Totals:**

#### Total component lines quantity

**Key:** gross_req

**Agg:** sum

**Format:** number

#### Total material cost for the build

**Key:** ext

**Agg:** sum

**Format:** currency

#### Most expensive component line

**Key:** ext

**Agg:** max

**Format:** currency

**Summary:**

#### Material cost per finished unit (set parent quantity to total build)

**Key:** per_unit

**Expr:** sum_ext / 50

**Format:** currency

**Notes:** For a multi level BOM, explode one level at a time: the parent quantity for a level 2 line is the gross requirement of its level 1 parent, not the finished good quantity. Change the 50 in the summary mentally if your build quantity differs, or export and adjust in Excel.

## Content

**Intro:** A BOM explosion turns a finished good demand into the quantity of every component you need to buy or make. This worksheet handles quantity per, scrap and cost, and is useful when you need to sanity check an ERP explosion or plan a one off build in Excel.

**Sections:**

#### How to use it

**Body:** List each component on its own row with the BOM level. Enter the parent quantity required, then the quantity per parent from the bill of materials, and the scrap or yield loss as a percentage. The sheet multiplies them and adds the scrap allowance to get gross component requirement, then multiplies by unit cost. For a deeper BOM, work level by level: the gross requirement of a level 1 subassembly becomes the parent quantity of its level 2 children.

**Bullets:**

- Copy BOM lines from your ERP export.
- Keep units of measure consistent with the BOM.
- Use scrap only where the BOM does not already include it.
- Export to Excel for further level by level work.

#### The formula and standards

**Body:** Gross requirement equals parent quantity times quantity per times one plus the scrap percentage. Some systems treat scrap as a yield: dividing by one minus the scrap fraction, which gives a slightly larger number for high scrap rates. Check how your ERP defines component scrap versus operation yield before comparing numbers. Phantom assemblies pass requirements straight through without being stocked.

#### Reading the result

**Body:** The extended cost column shows which components drive the build cost, which is usually where buyer attention pays off. In the sample, castings and shafts dominate while screws are almost noise. Components with fractional quantities per, such as gasket sheet by the metre, are where rounding rules and minimum purchase multiples matter more than the quantity itself.

#### Common mistakes

**Body:** People often apply scrap twice, once on the BOM line and again in the item master. Others forget effectivity dates and explode an engineering revision that is not yet released. A third mistake is multiplying level 2 lines by the finished good quantity instead of the level 1 parent requirement, which overstates demand wildly on multi level bills.

**Cta:** If you explode bills of materials in a spreadsheet because the ERP view is hard to read, Netray can build a single level and indented BOM explorer on top of your live data.

**Faq:**

#### What is a BOM explosion?

**Answer:** It is the process of expanding a parent item into all the components, subassemblies and raw materials needed to build it, multiplying quantity per at each level. MRP does this automatically; a worksheet lets you verify it manually.

#### How do I include scrap in a BOM explosion?

**Answer:** Multiply the base requirement by one plus the scrap percentage, or divide by the yield. Use whichever method your ERP uses. This sheet uses the multiplication form, which is the common component scrap approach.

#### Do phantom assemblies appear in the explosion?

**Answer:** Phantoms are exploded through: their components are required directly against the parent and the phantom itself is not planned or stocked. List the phantom's children on the parent's level in the worksheet.

#### Can I use this for a multi level BOM?

**Answer:** Yes, one level at a time. Calculate the level 1 gross requirements, then use each subassembly's gross requirement as the parent quantity for its own components on the next pass.

## Search terms

bom explosion worksheet, bill of materials explosion excel, multi level bom requirements calculation, component requirements from bom, bom explosion example, bom quantity per scrap factor, material requirements bom template

---