# Business Central Item Costing Method, Replenishment and Reordering Policy Reference

> Source: https://netray.co/tools/business-central-item-setup-options-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Plain-language meaning of the item card options in Business Central that drive costing and planning, with guidance on when each fits.

## Category

microsoft-dynamics

## Erp

Microsoft Dynamics 365 Business Central

## Audience

- BC functional consultant
- Planner
- Inventory controller

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Item card field

**Key:** field

**Type:** text

#### Option

**Key:** option

**Type:** text

#### What it does

**Key:** meaning

**Type:** text

#### Typically fits

**Key:** fit

**Type:** text

**Rows:**

**Field:** Costing Method

**Option:** FIFO

**Meaning:** Outbound cost is taken from the oldest inbound entry still on hand

**Fit:** Perishables, items with price drift, simple audit trail

**Field:** Costing Method

**Option:** LIFO

**Meaning:** Outbound cost is taken from the newest inbound entry

**Fit:** Rare, only where local rules allow it

**Field:** Costing Method

**Option:** Specific

**Meaning:** Cost follows the exact lot or serial number sold

**Fit:** High value serialized goods, requires item tracking on every transaction

**Field:** Costing Method

**Option:** Average

**Meaning:** Unit cost is recalculated as a moving average per period or day

**Fit:** Commodity materials with frequent receipts

**Field:** Costing Method

**Option:** Standard

**Meaning:** Items are valued at a fixed standard cost, differences go to variance accounts

**Fit:** Manufactured items where variance reporting is wanted

**Field:** Item Type

**Option:** Inventory

**Meaning:** Tracks quantity and value in item ledger and value entries

**Fit:** Stocked goods and manufactured items

**Field:** Item Type

**Option:** Service

**Meaning:** No inventory tracking, used on sales and purchase lines

**Fit:** Labor, freight, installation

**Field:** Item Type

**Option:** Non-Inventory

**Meaning:** No quantity tracking, but can be bought and sold with a cost

**Fit:** Consumables expensed on receipt

**Field:** Replenishment System

**Option:** Purchase

**Meaning:** Planning suggests purchase orders for the item

**Fit:** Bought components and trading goods

**Field:** Replenishment System

**Option:** Prod. Order

**Meaning:** Planning suggests production orders using the production BOM and routing

**Fit:** Manufactured items

**Field:** Replenishment System

**Option:** Assembly

**Meaning:** Planning suggests assembly orders using the assembly BOM

**Fit:** Simple kits and light assembly

**Field:** Replenishment System

**Option:** Transfer

**Meaning:** Planning suggests transfer orders from another location through stockkeeping units

**Fit:** Multi-location distribution

**Field:** Reordering Policy

**Option:** Fixed Reorder Qty.

**Meaning:** When projected stock falls to the reorder point, order the fixed reorder quantity

**Fit:** Stable demand, items with set pack sizes

**Field:** Reordering Policy

**Option:** Maximum Qty.

**Meaning:** When projected stock falls to the reorder point, order up to the maximum inventory

**Fit:** Replenish-to-level items, min-max stock

**Field:** Reordering Policy

**Option:** Order

**Meaning:** Create a supply order for each demand line, linked one to one

**Fit:** Make-to-order and project items

**Field:** Reordering Policy

**Option:** Lot-for-Lot

**Meaning:** Supply is planned to cover demand inside the time bucket, with optional safety stock

**Fit:** Most MRP driven manufactured items

**Field:** Reordering Policy

**Option:** (blank)

**Meaning:** Item is not planned by the planning worksheet or requisition worksheet reordering logic

**Fit:** Items handled manually

**Field:** Manufacturing Policy

**Option:** Make-to-Stock

**Meaning:** Production orders are planned from forecast and stock levels

**Fit:** Repetitive or catalog products

**Field:** Manufacturing Policy

**Option:** Make-to-Order

**Meaning:** Production orders are created for each demand, with lower level components also made to order

**Fit:** Configured and engineered products

**Field:** Order Tracking Policy

**Option:** None

**Meaning:** No order tracking links are created

**Fit:** Low value items

**Field:** Order Tracking Policy

**Option:** Tracking Only

**Meaning:** Links between supply and demand are shown, no action messages

**Fit:** Reference visibility

**Field:** Order Tracking Policy

**Option:** Tracking & Action Msgs.

**Meaning:** Links are shown and the system proposes changes to existing orders

**Fit:** Items managed by MRP

**Field:** Reserve

**Option:** Optional

**Meaning:** Users can reserve manually on demand lines

**Fit:** General use

**Field:** Reserve

**Option:** Always

**Meaning:** The system reserves automatically where stock exists

**Fit:** Scarce stock with a firm allocation rule

**Notes:** Options are listed as they appear on the item card and stockkeeping unit card in current Business Central versions. Costing method changes on items with entries are restricted, so decide the method before go-live.

## Content

**Intro:** The item card in Business Central holds a handful of fields that control how stock is valued and how planning behaves. This reference explains each option in plain terms so a consultant, planner or controller can pick the right value during setup.

**Sections:**

#### How to use the reference

**Body:** Filter by the item card field name you are configuring, for example Reordering Policy, and read each option with its typical fit. Combine this with your item categories: purchased raw materials may use Lot-for-Lot and Purchase, while engineered products use Order and Make-to-Order. Export the list and add a column for the choice you make per item category, then use it as the basis of your item template configuration.

#### Costing method decisions

**Body:** Costing method controls how the cost of goods sold is determined. Standard costing needs a maintained standard cost and a periodic roll-up, but gives variance visibility. Average costing is the simplest for purchased materials. FIFO is intuitive for finance but requires cost adjustment to flow properly. Specific costing requires item tracking on every inbound and outbound line, so use it only where the business really tracks cost per serial or lot.

**Bullets:**

- Pick a default per item category and put it in an item template
- Run the Adjust Cost - Item Entries batch job on a regular schedule
- Test a purchase, consumption and sale before changing method on live items

#### Planning options and how they interact

**Body:** Reordering Policy only matters when the replenishment system is set. A manufactured item with Prod. Order replenishment and Lot-for-Lot policy gets production proposals in the planning worksheet. Add a production BOM and routing, otherwise the planning run cannot explode components. Order Tracking Policy decides whether you see action messages. Safety stock and lot accumulation period shape the quantities that are suggested.

#### Common mistakes

**Body:** Leaving Reordering Policy blank on items you expect to be planned is the most frequent mistake, as is choosing Maximum Qty. without a maximum inventory value. Another is setting Make-to-Order for items that actually have a stock buffer. Finally, changing costing method after posting creates confusion in the value entry history, so settle it early.

**Cta:** If you want item setup reviewed against your actual consumption and lead times, we can analyze your ERP data on-premises and suggest planning parameters for a planner to approve.

**Faq:**

#### Which costing method is best in Business Central?

**Answer:** There is no single best one. Standard fits manufacturers who want variance analysis, Average suits commodity materials, FIFO suits many distributors, and Specific is for tracked, high value items. Match the method to how finance wants to see cost and how the item is received.

#### What is the difference between Maximum Qty. and Fixed Reorder Qty.?

**Answer:** Fixed Reorder Qty. orders the same quantity each time the reorder point is hit. Maximum Qty. orders whatever brings the projected stock up to the maximum inventory level, so the order size varies with how far stock has fallen.

#### Does Lot-for-Lot create orders per demand line?

**Answer:** No, that is the Order policy. Lot-for-Lot plans supply to cover net demand within a time bucket, optionally grouped by the lot accumulation period, so several demand lines can share one supply order.

#### Can I change the costing method on an item with entries?

**Answer:** Business Central restricts it because existing value entries were created under the old method. Plan the change as a controlled process with finance, ideally with a new item or a documented cutover, not as a casual edit.

## Search terms

business central costing methods, business central reordering policy, lot-for-lot business central, business central replenishment system, fixed reorder qty business central, business central make to order vs make to stock, business central item card setup

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
