# C1V1 Dilution Calculator

> Source: https://netray.co/tools/c1v1-dilution-calculator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Work out how much stock solution and diluent to mix to hit a target concentration and final volume using C1V1 = C2V2.

## Category

industry-templates

## Industry

Chemical Manufacturing

## Audience

- Lab technician
- Process operator
- Quality chemist

## Tool

**Kind:** calculator

**Inputs:**

#### Stock concentration (C1)

**Key:** c1

**Type:** number

**Default:** 37

**Min:** 0

**Step:** 0.5

**Unit:** %

**Help:** Concentration of the stock, in any unit as long as C2 uses the same one.

#### Target concentration (C2)

**Key:** c2

**Type:** number

**Default:** 5

**Min:** 0

**Step:** 0.1

**Unit:** %

**Help:** Concentration you want after dilution.

#### Final volume needed (V2)

**Key:** v2

**Type:** number

**Default:** 20

**Min:** 0

**Step:** 1

**Unit:** L

**Help:** Total volume of diluted solution you need.

**Outputs:**

#### Stock volume to take (V1)

**Key:** v1

**Expr:** c2 * v2 / c1

**Format:** decimal

**Primary:** true

**Description:** Volume of stock to measure out.

#### Diluent volume to add

**Key:** diluent

**Expr:** v2 - v1

**Format:** decimal

**Primary:** true

**Description:** Water or solvent added to reach the final volume.

#### Dilution factor (C1/C2)

**Key:** factor

**Expr:** c1 / c2

**Format:** decimal

#### Diluent parts per 1 part stock

**Key:** ratio

**Expr:** diluent / v1

**Format:** decimal

**Description:** Equals dilution factor minus 1.

#### Valid (1 = yes, 0 = C2 exceeds C1)

**Key:** valid

**Expr:** if(lte(c2, c1), 1, 0)

**Format:** integer

**Description:** A solution cannot be made more concentrated by dilution.

**Chart:**

#### Stock and diluent volume vs final volume

**Type:** line

**X:** v2

**From:** 1

**To:** 100

**Steps:** 25

**Series:**

- v1
- diluent

**Disclaimer:** Assumes volumes are additive. For strong acids, bases and some solvents, volumes are not exactly additive and heat is released. Always add concentrate to diluent slowly, wearing the PPE listed on the SDS.

## Content

**Intro:** C1V1 = C2V2 is the working equation behind almost every dilution on a plant floor or in a QC lab. This calculator solves it for the stock volume and the diluent volume and checks that the target is actually achievable.

**Sections:**

#### How to use it

**Body:** Enter the stock concentration C1, the target concentration C2 and the final volume V2. The calculator gives V1, the volume of stock to measure, and the diluent to add so the total equals V2. Concentration units are free as long as C1 and C2 use the same one (percent, molarity, g/L, ppm). Volume units come back in whatever you entered for V2. If C2 is higher than C1 the validity flag drops to zero because dilution can only lower concentration.

**Bullets:**

- Make up to the final volume in a graduated vessel rather than adding a fixed volume of diluent.
- Label the container with concentration, date and preparer.
- Use a fresh calculation if the stock concentration changes by lot.

#### The equation and its limits

**Body:** The amount of solute is conserved, so C1 times V1 equals C2 times V2. Rearranged, V1 equals C2 times V2 divided by C1. The dilution factor is C1 divided by C2, so a 37 percent stock diluted to 5 percent is a factor of 7.4, one part stock plus 6.4 parts diluent. The equation assumes ideal additivity of volumes; with concentrated sulfuric acid, caustic or ethanol-water blends the final volume is slightly less than the sum, which is why you top up to the mark.

#### Worked example and mistakes

**Body:** To make 20 L of 5 percent solution from a 37 percent stock, V1 is 5 x 20 / 37 = 2.70 L of stock and 17.30 L of diluent. Common errors: mixing weight percent with volume percent, using molarity for one value and percent for the other, adding the full V2 of diluent on top of the stock, and forgetting that the stock label may be a nominal value that drifts with age or evaporation.

**Bullets:**

- Confirm the stock assay on the certificate of analysis.
- Check density if mixing weight percent by volume.
- Add acid to water, never water to acid.

**Cta:** If dilution recipes are scattered across spreadsheets and paper batch sheets, Netray can help move them into your ERP or MES as controlled, auditable formulas.

**Faq:**

#### What does C1V1 = C2V2 mean?

**Answer:** It states that the amount of solute before dilution (stock concentration times stock volume) equals the amount after dilution (final concentration times final volume). It works for any consistent concentration unit because the solute amount is unchanged by adding diluent.

#### Can I use it for percent solutions?

**Answer:** Yes, if both values are the same type, for example both weight percent or both volume percent. Mixing weight percent and volume percent without a density correction gives wrong answers, especially for dense or viscous stocks.

#### Why can the final volume be less than stock plus diluent?

**Answer:** Some mixtures contract, such as ethanol and water or strong acids and water. That is why procedures say to dilute to a mark in a calibrated vessel. For routine plant dilutions the error is small, but for assays it matters.

#### Is this safe for acids and bases?

**Answer:** The arithmetic is, but the handling needs care. Strong acids and bases release heat when diluted. Follow your SDS and site procedure, add concentrate slowly to diluent with stirring, and wear the specified PPE.

## Search terms

c1v1 calculator, dilution calculator, c1v1=c2v2 calculator, stock solution dilution calculator, how to dilute chemical concentration, dilution factor calculator, serial dilution volume, make up solution calculator

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
