# Casting Nonconformance and Disposition Template

> Source: https://netray.co/tools/casting-nonconformance-disposition-template
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A nonconformance report built for castings, with defect type, location on the part, heat number, containment and a disposition decision.

## Category

quality

## Industry

Foundry

## Audience

- Quality engineer
- Foundry supervisor
- Supplier quality

## Tool

**Kind:** template

**Output:** document

**Fields:**

#### Company

**Key:** company

**Type:** text

**Default:** Harbor Machining Co

#### NCR number

**Key:** ncr_no

**Type:** text

**Default:** NCR-2610-044

#### Date found

**Key:** date

**Type:** date

**Default:** 2026-10-20

#### Part number

**Key:** part_no

**Type:** text

**Default:** PH-210 pump housing

#### Heat or lot number

**Key:** heat_no

**Type:** text

**Default:** H-26-10418

#### Quantity received

**Key:** qty_rec

**Type:** number

**Default:** 120

#### Quantity nonconforming

**Key:** qty_bad

**Type:** number

**Default:** 9

#### Defect type

**Key:** defect

**Type:** select

**Options:**

- Gas porosity
- Shrinkage
- Sand inclusion
- Cold shut
- Misrun
- Crack
- Dimensional
- Hardness out of range

**Default:** Shrinkage

#### Found at

**Key:** found_at

**Type:** select

**Options:**

- Receiving inspection
- First operation machining
- Final machining
- Pressure test
- Customer

**Default:** First operation machining

#### Location on part

**Key:** location

**Type:** text

**Default:** Boss at flange, exposed after 3 mm cut

#### Disposition

**Key:** disposition

**Type:** select

**Options:**

- Scrap
- Return to supplier
- Rework or repair
- Use as is with approval
- Sort 100 percent

**Default:** Return to supplier

#### Description of nonconformance

**Key:** description

**Type:** textarea

**Default:** Subsurface shrinkage cavities exposed on the flange boss at first machining. Cavity size up to 3 mm. Drawing allows no cavities in the sealing face.

**Blocks:**

#### Casting Nonconformance Report

**Body:** Company: {{company}}
NCR number: {{ncr_no}}
Date found: {{date}}
Part: {{part_no}}
Heat or lot: {{heat_no}}

#### Quantity

**Body:** Received: {{qty_rec}}
Nonconforming: {{qty_bad}}
Found at: {{found_at}}

#### Defect

**Body:** Type: {{defect}}
Location: {{location}}

{{description}}

#### Containment

**Table:**

**Columns:**

- Action
- Owner
- Due
- Done

**Rows:**

**0:** Quarantine suspect stock

**0:** Check other lots with same heat

**0:** Notify supplier

#### Root Cause and Corrective Action

**Body:** Root cause: ____________________
Corrective action: ____________________
Verification of effectiveness: ____________________

#### Disposition

**Body:** Decision: {{disposition}}

#### Approvals

**Signatures:**

- Inspector
- Quality manager
- Engineering
- Supplier contact

**Notes:** Use as a starting point. Repair of castings, such as welding, normally needs written customer or specification approval before it is used as a disposition.

## Content

**Intro:** Castings fail in ways that other parts do not: hidden porosity, shrinkage found only after the first cut, inclusions that show at pressure test. This nonconformance template captures the casting specific facts so the supplier can act on it.

**Sections:**

#### How to use this template

**Body:** Enter the identifying fields, choose the defect type and where it was found, then describe the defect with size and location. Print or export, add photos and sketches, and route for approval. Always record the heat or lot number, because a casting problem usually follows the melt or the mold batch, not the single piece.

#### Choosing the defect type

**Body:** Gas porosity shows as rounded holes, often near the surface. Shrinkage is irregular and rough, usually at thick sections or hot spots. Sand inclusions are loose grains or slag pockets. Cold shuts and misruns are fill problems from low pour temperature or poor gating. Name the defect precisely, since the corrective action differs: gating and risering for shrinkage, venting and moisture control for gas.

#### Disposition decisions

**Body:** Scrap and return to supplier are straightforward. Use as is needs engineering, and sometimes the customer, to accept the deviation. Repair of a casting, for example by welding or impregnation, is only acceptable where the specification and customer permit it, and it must be recorded. Sort 100 percent is containment, not a corrective action.

#### Common mistakes

**Body:** Teams often write only 'porosity' with no size, location or drawing requirement, so the supplier cannot reproduce or judge it. Also avoid closing the NCR on a disposition alone. Record the cause and verify that the next lot is clean, and update the supplier scorecard.

**Cta:** If you track nonconformances and supplier performance in an ERP, Netray can help summarize defect trends by supplier and heat on your own systems.

**Faq:**

#### Can I use this for supplier corrective action?

**Answer:** Yes. Send the exported PDF with photos to the supplier and ask for a root cause and corrective action reply. If a formal SCAR or 8D format is required, copy the content into it.

#### What if the defect is only found after machining?

**Answer:** Select the machining operation in the found at field and record the cut depth. Defects exposed late are costly because value has been added, so note the cost in your own tracking.

#### Do I need the heat number on every NCR?

**Answer:** It is strongly recommended. It lets the supplier trace the melt and mold batch and lets you quarantine other pieces from the same lot.

#### Is this a legal document?

**Answer:** It is a quality record, not legal advice. Contractual remedies depend on your purchase agreement and applicable specifications.

## Search terms

casting nonconformance report, casting NCR template, foundry defect report form, casting rejection report, casting disposition form, supplier casting complaint template, porosity nonconformance report, casting deviation request

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
