# Casting Shrinkage Allowance Table: Pattern Shrink Percent by Alloy

> Source: https://netray.co/tools/casting-shrinkage-allowance-reference-table
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Look up typical linear shrinkage allowances by alloy for sand casting patterns, with conversions to inches per foot and millimetres per metre.

## Category

industry-templates

## Industry

Foundry

## Audience

- Pattern maker
- Foundry engineer
- Tooling engineer
- Design engineer

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Alloy

**Key:** alloy

**Type:** text

#### Family

**Key:** family

**Type:** select

**Options:**

- Cast iron
- Steel
- Aluminium
- Copper alloy
- Magnesium

#### Low (%)

**Key:** low

**Type:** number

**Format:** decimal

#### High (%)

**Key:** high

**Type:** number

**Format:** decimal

#### Midpoint (%)

**Key:** mid

**Type:** number

**Expr:** (low + high) / 2

**Format:** decimal

#### Approx in per ft

**Key:** in_ft

**Type:** number

**Expr:** (low + high) / 2 * 0.12

**Format:** decimal

#### Approx mm per m

**Key:** mm_m

**Type:** number

**Expr:** (low + high) / 2 * 10

**Format:** decimal

**Rows:**

**Alloy:** Gray iron, small section

**Family:** Cast iron

**Low:** 0.8

**High:** 1

**Alloy:** Gray iron, heavy section

**Family:** Cast iron

**Low:** 0.6

**High:** 0.9

**Alloy:** Ductile iron

**Family:** Cast iron

**Low:** 0.5

**High:** 1

**Alloy:** Malleable iron (as cast white)

**Family:** Cast iron

**Low:** 1

**High:** 1.5

**Alloy:** White iron

**Family:** Cast iron

**Low:** 1.5

**High:** 2

**Alloy:** Low carbon steel

**Family:** Steel

**Low:** 1.6

**High:** 2.1

**Alloy:** Low alloy steel

**Family:** Steel

**Low:** 1.6

**High:** 2.1

**Alloy:** Austenitic stainless steel

**Family:** Steel

**Low:** 1.8

**High:** 2.4

**Alloy:** High manganese steel

**Family:** Steel

**Low:** 2.2

**High:** 2.7

**Alloy:** Aluminium Al-Si (A356 type)

**Family:** Aluminium

**Low:** 1

**High:** 1.3

**Alloy:** Aluminium Al-Cu (204 type)

**Family:** Aluminium

**Low:** 1.2

**High:** 1.6

**Alloy:** Magnesium alloys

**Family:** Magnesium

**Low:** 1

**High:** 1.4

**Alloy:** Yellow brass

**Family:** Copper alloy

**Low:** 1.3

**High:** 1.6

**Alloy:** Red brass / leaded gunmetal

**Family:** Copper alloy

**Low:** 1

**High:** 1.6

**Alloy:** Tin bronze

**Family:** Copper alloy

**Low:** 1

**High:** 1.6

**Alloy:** Aluminium bronze

**Family:** Copper alloy

**Low:** 1.6

**High:** 2.2

**Alloy:** Copper (cast)

**Family:** Copper alloy

**Low:** 1.5

**High:** 2

**Notes:** Typical sand casting ranges for planning only. Actual allowance depends on section thickness, mold rigidity, core restraint and chemistry. Confirm with your foundry and a trial casting, and allow different shrink in different directions for restrained castings. Midpoint conversions use 1 percent equals 0.12 in per ft.

## Content

**Intro:** Metal shrinks as it cools from liquid to room temperature, so the pattern must be built larger than the finished casting. This reference table lists typical linear shrinkage allowances by alloy, so designers, pattern makers and buyers can sanity check a shrink rule before cutting a pattern.

**Sections:**

#### How to use the table

**Body:** Search for your alloy and read the low and high allowance in percent. The midpoint and the converted values in inches per foot and millimetres per metre give a quick shrink rule size. Multiply a finished dimension by one plus the allowance divided by 100 to get the pattern dimension. For a full per-feature calculation with machining stock, use the pattern allowance worksheet linked on this page.

#### What affects shrinkage

**Body:** Shrinkage is not a single constant. Free contraction in a loose sand mold can be higher than in a casting restrained by cores or a rigid flask. Thick sections cool later and may finish contracting differently from thin ones. Graphite expansion in grey and ductile iron offsets part of the contraction, which is why iron allowances are small, whereas steels and aluminium alloys without graphite shrink more. Chemistry, pouring temperature and mold material also move the figure.

**Bullets:**

- Restraint from cores reduces effective shrink
- Heavy sections of iron can show near zero shrink
- Steels and non-ferrous alloys contract more
- Different directions may need different allowances

#### Worked example

**Body:** A steel bracket is 600 mm long and the foundry uses a 2 percent shrink rule. The pattern length is 600 times 1.02, or 612 mm. The same allowance in a shrink rule is about 0.24 inches per foot. If the casting needs 3 mm of machining stock on each end, add it to the finished length first, then apply the shrink: (600 + 6) times 1.02 equals 618.1 mm. Always apply the allowance to the dimension that includes machining stock.

#### Common mistakes

**Body:** Do not copy a table value without checking it against the foundry's own experience. Shrink rules differ between plants. Do not apply shrink to dimensions that are formed by a core print with fixed tolerance, and do not forget that patterns for investment casting and die casting use different tooling shrink logic. In the ERP, store the shrink factor with the pattern or tooling record so revisions are traceable to the casting drawing revision.

**Cta:** If pattern and tooling data sit outside your ERP, we can help you link shrink factors and drawing revisions to the item master.

**Faq:**

#### What is the shrinkage allowance for cast iron?

**Answer:** Grey cast iron is typically around 0.6 to 1.0 percent, and ductile iron about 0.5 to 1.0 percent, because graphite formation expands the metal as it solidifies. Heavy sections can show less. Confirm with your foundry.

#### What is the shrinkage allowance for steel castings?

**Answer:** Carbon and low alloy steel castings typically use about 1.6 to 2.1 percent, and high manganese or austenitic stainless grades can run higher. Foundries often set a rule per pattern shop.

#### How do I convert percent to inches per foot?

**Answer:** Multiply the percent by 0.12. For example, 2 percent equals 0.24 inches per foot. For millimetres per metre, multiply the percent by 10.

#### Do these values include machining allowance?

**Answer:** No. Shrinkage and machining stock are separate. Add machining stock to the finished size, then apply the shrink allowance to that total, as shown in the worked example.

## Search terms

casting shrinkage allowance, pattern shrinkage allowance table, shrink rule percent by metal, linear shrinkage cast iron steel aluminium, patternmaker shrinkage, inches per foot shrinkage casting, shrinkage allowance gray iron, casting contraction allowance

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
