# China Import Landed Cost Calculator

> Source: https://netray.co/tools/china-import-landed-cost-calculator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Turn a CNY supplier quote into a USD landed cost per unit, and see how the exchange rate moves it.

## Category

supply-chain

## Region

China

## Audience

- Buyer
- Sourcing manager
- Cost analyst

## Tool

**Kind:** calculator

**Currency:** $

**Inputs:**

#### Supplier unit price

**Key:** price_cny

**Type:** number

**Default:** 85

**Min:** 0

**Step:** 1

**Unit:** CNY

**Help:** Price per unit quoted FOB or EXW, excluding Chinese VAT.

#### Order quantity

**Key:** qty

**Type:** number

**Default:** 5000

**Min:** 1

**Step:** 100

**Unit:** units

#### Exchange rate

**Key:** fx

**Type:** number

**Default:** 7.2

**Min:** 1

**Step:** 0.05

**Unit:** CNY per USD

#### Freight and origin charges

**Key:** freight

**Type:** number

**Default:** 6500

**Min:** 0

**Step:** 100

**Unit:** USD

**Help:** Total for the shipment, including origin handling.

#### Insurance rate

**Key:** ins_pct

**Type:** slider

**Default:** 0.5

**Min:** 0

**Max:** 3

**Step:** 0.1

**Unit:** %

#### Import duty rate

**Key:** duty_pct

**Type:** slider

**Default:** 3.4

**Min:** 0

**Max:** 40

**Step:** 0.1

**Unit:** %

**Help:** Use your tariff classification and any additional duties.

#### Brokerage and local fees

**Key:** fees

**Type:** number

**Default:** 900

**Min:** 0

**Step:** 50

**Unit:** USD

**Outputs:**

#### Goods value

**Key:** goods

**Expr:** price_cny * qty / fx

**Format:** currency

#### Insurance

**Key:** insurance

**Expr:** (goods + freight) * ins_pct / 100

**Format:** currency

#### CIF value

**Key:** cif

**Expr:** goods + freight + insurance

**Format:** currency

#### Import duty

**Key:** duty

**Expr:** cif * duty_pct / 100

**Format:** currency

**Description:** Many countries assess duty on CIF; others on FOB. Check your own rules.

#### Total landed cost

**Key:** landed

**Expr:** cif + duty + fees

**Format:** currency

#### Landed cost per unit

**Key:** unit

**Expr:** landed / qty

**Format:** currency

**Primary:** true

#### Landed vs goods value

**Key:** mult

**Expr:** landed / goods

**Format:** decimal

**Description:** Multiple of the goods value.

**Chart:**

#### Landed cost per unit vs exchange rate

**Type:** line

**X:** fx

**From:** 6

**To:** 8

**Steps:** 20

**Series:**

- unit

**Disclaimer:** Estimate only. Duty, additional tariffs, import VAT and local fees depend on the destination country and tariff classification. Confirm with your customs broker.

## Content

**Intro:** A Chinese quote in CNY looks cheap until freight, insurance, duty and fees are added and the exchange rate moves. This calculator gives the landed cost per unit in USD and shows the rate sensitivity.

**Sections:**

#### How to use it

**Body:** Enter the supplier unit price in CNY, the order quantity and the exchange rate you expect to pay. Add total freight for the shipment, an insurance percentage, your duty rate and brokerage fees. The result is landed cost per unit, plus the multiple of goods value so you can compare suppliers on the same basis.

#### The formula

**Body:** Goods value is price times quantity divided by the CNY per USD rate. Insurance is applied to goods plus freight, giving the CIF value. Duty is the duty rate times CIF, and landed cost is CIF plus duty and fees. Import VAT or GST is usually recoverable and is left out; add it if it is a cost in your case.

**Bullets:**

- Goods = price x qty / rate
- CIF = goods + freight + insurance
- Duty = CIF x duty rate
- Landed = CIF + duty + fees

#### Common mistakes

**Body:** Quotes that include Chinese VAT overstate cost for exporters who get a refund, so confirm the price basis. Freight per unit changes with quantity, so rerun for each order size. Do not forget additional duties that apply to certain origins and products, and do not use a spot rate for a payment that will settle in 60 days; use the forward or budget rate.

**Cta:** Netray can discuss feeding landed cost logic into your ERP purchasing views so buyers compare suppliers on the same basis.

**Faq:**

#### Does it include import VAT?

**Answer:** No. Import VAT or GST is usually recoverable, so it is excluded. Add it to fees if your business cannot recover it.

#### Which exchange rate should I use?

**Answer:** Use the rate you expect at payment, often a budget or forward rate. The chart shows how landed cost changes from 6 to 8 CNY per USD.

#### Is duty on FOB or CIF?

**Answer:** It differs by country. Many assess on CIF, others on FOB or transaction value. Check with your broker and adjust.

#### Can I compare two suppliers?

**Answer:** Run it twice with each quote and compare the landed cost per unit, not the quoted price.

## Search terms

landed cost calculator china, china sourcing cost calculator, cny to usd landed cost, import duty calculator china sourcing, total landed cost per unit, fob to landed cost, china supplier quote comparison

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
