# CNC G-Code Reference Table

> Source: https://netray.co/tools/cnc-g-code-reference-table
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A searchable table of common G-codes for milling and turning with their function, group and practical notes.

## Category

manufacturing

## Industry

Machine Shops

## Audience

- CNC machinist
- CNC programmer
- Manufacturing engineer

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### G-code

**Key:** code

**Type:** text

#### Function

**Key:** function

**Type:** text

#### Group

**Key:** group

**Type:** text

#### Mill / Lathe

**Key:** machine

**Type:** text

#### Notes

**Key:** notes

**Type:** text

**Rows:**

**Code:** G00

**Function:** Rapid positioning

**Group:** Motion

**Machine:** Both

**Notes:** Non-cutting move at maximum traverse. Check the path for clamps and the part.

**Code:** G01

**Function:** Linear interpolation

**Group:** Motion

**Machine:** Both

**Notes:** Straight cutting move at the programmed F feed.

**Code:** G02

**Function:** Circular interpolation clockwise

**Group:** Motion

**Machine:** Both

**Notes:** Use I, J, K center offsets or an R radius.

**Code:** G03

**Function:** Circular interpolation counterclockwise

**Group:** Motion

**Machine:** Both

**Notes:** Same address words as G02.

**Code:** G04

**Function:** Dwell

**Group:** Non-modal

**Machine:** Both

**Notes:** Pause using P (milliseconds on many controls) or X (seconds). Check your control.

**Code:** G09

**Function:** Exact stop, single block

**Group:** Non-modal

**Machine:** Both

**Notes:** Decelerates to exact position at the end of the block.

**Code:** G10

**Function:** Programmable data input

**Group:** Non-modal

**Machine:** Both

**Notes:** Writes work or tool offsets from the program.

**Code:** G17

**Function:** XY plane selection

**Group:** Plane

**Machine:** Mill

**Notes:** Default plane for arcs and cutter compensation on most mills.

**Code:** G18

**Function:** ZX plane selection

**Group:** Plane

**Machine:** Both

**Notes:** Default plane on a lathe.

**Code:** G19

**Function:** YZ plane selection

**Group:** Plane

**Machine:** Mill

**Notes:** For arcs in the YZ plane.

**Code:** G20

**Function:** Inch units

**Group:** Units

**Machine:** Both

**Notes:** Fanuc-style. Some controls use G70 for inch.

**Code:** G21

**Function:** Metric units

**Group:** Units

**Machine:** Both

**Notes:** Fanuc-style. Some controls use G71 for metric.

**Code:** G28

**Function:** Return to machine home via intermediate point

**Group:** Non-modal

**Machine:** Both

**Notes:** Usually used with G91 for a safe move to zero return.

**Code:** G30

**Function:** Return to second reference point

**Group:** Non-modal

**Machine:** Both

**Notes:** Commonly used for tool change position.

**Code:** G40

**Function:** Cutter radius compensation cancel

**Group:** Compensation

**Machine:** Mill

**Notes:** Cancel on a move away from the part.

**Code:** G41

**Function:** Cutter compensation left

**Group:** Compensation

**Machine:** Mill

**Notes:** Uses a D word to select the radius offset.

**Code:** G42

**Function:** Cutter compensation right

**Group:** Compensation

**Machine:** Mill

**Notes:** Climb vs conventional depends on spindle direction and side.

**Code:** G43

**Function:** Tool length compensation, positive

**Group:** Compensation

**Machine:** Mill

**Notes:** Uses an H word and Z move to activate.

**Code:** G49

**Function:** Tool length compensation cancel

**Group:** Compensation

**Machine:** Mill

**Notes:** Cancels G43 and G44.

**Code:** G52

**Function:** Local coordinate system shift

**Group:** Non-modal

**Machine:** Both

**Notes:** Temporary shift of the work coordinate system. Cancel with G52 X0 Y0 Z0.

**Code:** G53

**Function:** Machine coordinate system move

**Group:** Non-modal

**Machine:** Both

**Notes:** Applies to the current block only.

**Code:** G54

**Function:** Work coordinate system 1

**Group:** Work offset

**Machine:** Both

**Notes:** G54 to G59 select the first six work offsets.

**Code:** G55

**Function:** Work coordinate system 2

**Group:** Work offset

**Machine:** Both

**Notes:** Often used for the second fixture position.

**Code:** G56

**Function:** Work coordinate system 3

**Group:** Work offset

**Machine:** Both

**Notes:** Same family as G54.

**Code:** G57

**Function:** Work coordinate system 4

**Group:** Work offset

**Machine:** Both

**Notes:** Same family as G54.

**Code:** G58

**Function:** Work coordinate system 5

**Group:** Work offset

**Machine:** Both

**Notes:** Same family as G54.

**Code:** G59

**Function:** Work coordinate system 6

**Group:** Work offset

**Machine:** Both

**Notes:** Further offsets use G54.1 P or G110 and up, depending on control.

**Code:** G61

**Function:** Exact stop mode

**Group:** Path mode

**Machine:** Mill

**Notes:** Decelerates at every corner. Cancel with G64.

**Code:** G64

**Function:** Cutting (blending) mode

**Group:** Path mode

**Machine:** Mill

**Notes:** Smoother motion without stopping at each block end.

**Code:** G68

**Function:** Coordinate system rotation

**Group:** Transform

**Machine:** Mill

**Notes:** Rotates the program about a point. Cancel with G69.

**Code:** G69

**Function:** Coordinate rotation cancel

**Group:** Transform

**Machine:** Mill

**Notes:** Cancels G68.

**Code:** G73

**Function:** High speed peck drilling cycle

**Group:** Canned cycle

**Machine:** Mill

**Notes:** Short retract between pecks to break chips.

**Code:** G76

**Function:** Fine boring cycle (mill)

**Group:** Canned cycle

**Machine:** Mill

**Notes:** Stops spindle and shifts the tool off the wall before retracting. On a lathe G76 is a threading cycle.

**Code:** G80

**Function:** Canned cycle cancel

**Group:** Canned cycle

**Machine:** Both

**Notes:** Always cancel before the next unrelated move.

**Code:** G81

**Function:** Drilling cycle

**Group:** Canned cycle

**Machine:** Mill

**Notes:** Feed in, rapid out.

**Code:** G82

**Function:** Drilling cycle with dwell

**Group:** Canned cycle

**Machine:** Mill

**Notes:** Dwell at the bottom for spot facing or counterbores.

**Code:** G83

**Function:** Peck drilling cycle

**Group:** Canned cycle

**Machine:** Mill

**Notes:** Full retract between pecks to clear chips. Deep holes.

**Code:** G84

**Function:** Tapping cycle, right hand

**Group:** Canned cycle

**Machine:** Mill

**Notes:** Needs a tap holder or rigid tapping (M29 on many Fanuc-style controls).

**Code:** G85

**Function:** Boring cycle, feed in and feed out

**Group:** Canned cycle

**Machine:** Mill

**Notes:** Spindle keeps turning on retract.

**Code:** G90

**Function:** Absolute programming

**Group:** Distance mode

**Machine:** Mill

**Notes:** Coordinates are relative to the work zero. On many lathes G90 is a turning cycle.

**Code:** G91

**Function:** Incremental programming

**Group:** Distance mode

**Machine:** Mill

**Notes:** Coordinates are relative to the current position.

**Code:** G92

**Function:** Set position / thread cycle

**Group:** Setting

**Machine:** Both

**Notes:** Mill: sets a position register. Some lathe controls use G92 for threading.

**Code:** G94

**Function:** Feed per minute

**Group:** Feed mode

**Machine:** Mill

**Notes:** F is in inches or mm per minute.

**Code:** G95

**Function:** Feed per revolution

**Group:** Feed mode

**Machine:** Both

**Notes:** F is in inches or mm per spindle revolution.

**Code:** G96

**Function:** Constant surface speed

**Group:** Spindle mode

**Machine:** Lathe

**Notes:** S is surface speed. Set a G50 limit first to cap RPM.

**Code:** G97

**Function:** Direct RPM

**Group:** Spindle mode

**Machine:** Lathe

**Notes:** S is spindle RPM. Cancels constant surface speed.

**Code:** G98

**Function:** Return to initial level after canned cycle

**Group:** Canned cycle

**Machine:** Mill

**Notes:** Retracts to the Z level before the cycle started.

**Code:** G99

**Function:** Return to R plane after canned cycle

**Group:** Canned cycle

**Machine:** Mill

**Notes:** Retracts only to the R plane; faster between holes.

**Code:** G50

**Function:** Spindle speed limit / coordinate setting

**Group:** Setting

**Machine:** Lathe

**Notes:** Used with S to cap RPM under G96 on Fanuc-style lathes.

**Code:** G70

**Function:** Finishing cycle

**Group:** Turning cycle

**Machine:** Lathe

**Notes:** Finish pass along the profile defined for G71 or G72.

**Code:** G71

**Function:** Rough turning cycle (stock removal)

**Group:** Turning cycle

**Machine:** Lathe

**Notes:** Roughs along Z using a profile defined by blocks.

**Notes:** Codes shown follow common Fanuc-style conventions. Haas, Siemens, Heidenhain, Mazak and others differ in details, and G-code groups, G70 to G72 and cycle formats vary by control. Always check the programming manual for your machine before running a program.

## Content

**Intro:** A G-code lookup is one of the most searched machining references. This table lists the codes used daily on mills and lathes with a plain-language function and the traps that usually catch people.

**Sections:**

#### How to use the table

**Body:** Type a code, function or keyword in the search box to filter the table, for example G83, tapping, or compensation. Each row gives the code, what it does, its group, whether it applies to a mill, a lathe or both, and a note about behavior or cautions. Export the table to Excel or PDF if you want a printed cheat sheet for the machine. Because controls differ, use it as a quick reminder, then confirm the exact format in your machine's manual.

#### Modal and non-modal codes

**Body:** Most G-codes are modal: they stay active until another code in the same group replaces them. G01, G90, G17 and G54 all remain in effect across blocks. Non-modal codes such as G04, G28 or G53 apply only to the line they appear on. This is why a safe start-up line usually restates the modal states, for example G90 G54 G17 G40 G49 G80, so a program does not inherit the previous job's state.

**Bullets:**

- Motion: G00, G01, G02, G03 (one active at a time)
- Distance mode: G90 or G91
- Work offset: G54 to G59 and extended offsets
- Canned cycles stay active until G80

#### Controls differ

**Body:** There is no single universal G-code standard. ISO 6983 defines a common core, but each builder adds extensions. G20 and G21 select units on Fanuc-style controls while older controls use G70 and G71. G90 is absolute positioning on a mill but a turning cycle on some lathe controls. G76 means a fine boring cycle on a mill and a threading cycle on a lathe. Siemens and Heidenhain use their own languages with different cycle calls. Read the manual for your specific control.

#### Common mistakes

**Body:** Forgetting G80 after a canned cycle can cause unexpected drilling on the next move. Leaving cutter compensation active through a rapid can gouge a part. Mixing G90 and G91 without a restatement is a classic source of crashes. On lathes, running G96 without a G50 RPM cap can send the spindle to its maximum when the tool approaches the centerline. Always dry run or single block a new program with feed and rapid overrides lowered.

**Cta:** If CNC programs, revisions and approvals are managed by file shares rather than your ERP or PLM, Netray can help connect them to part and routing records with read-only controls.

**Faq:**

#### What is the difference between G00 and G01?

**Answer:** G00 is a rapid, non-cutting move at the machine's traverse speed. G01 is a linear move at the programmed feed rate, used for cutting. Using G00 into material or G01 for long air moves are both common mistakes.

#### What does G54 do?

**Answer:** G54 selects work coordinate system 1, which maps program coordinates to a position on the machine set by the operator during setup. G55 to G59 select further work offsets so multiple fixtures or parts can share one program.

#### Are G-codes the same on every CNC machine?

**Answer:** No. A core set is shared, but details differ by control builder and machine type. Cycle formats, canned cycle parameters and even unit codes change. Use this table as a refresher and check the manual for your control before relying on a code.

#### What does it mean when a G-code is modal?

**Answer:** A modal code remains active until another code from the same group is programmed. For example, once G01 is active it applies to following moves until G00, G02 or G03 replaces it. Non-modal codes apply only to their own block.

## Search terms

g code list, g code reference, cnc g codes, g code cheat sheet, fanuc g codes, g code table pdf, g00 g01 g02 g03, cnc programming codes

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
