# Common OT and ICS Protocol Ports Reference

> Source: https://netray.co/tools/common-ot-and-ics-protocol-ports-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Default TCP and UDP ports used by industrial protocols and the IT services that sit beside them, with a firewall risk note for each.

## Category

developer

## Industry

Manufacturing

## Audience

- IT security lead
- Network engineer
- Automation engineer

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Port

**Key:** port

**Type:** text

#### Transport

**Key:** proto

**Type:** text

#### Protocol or service

**Key:** service

**Type:** text

#### Typically seen on

**Key:** typical

**Type:** text

#### Firewall note

**Key:** note

**Type:** text

**Rows:**

**Port:** 20

**Proto:** TCP

**Service:** FTP data

**Typical:** Legacy file transfer

**Note:** Cleartext. Replace with SFTP.

**Port:** 21

**Proto:** TCP

**Service:** FTP control

**Typical:** Machine tool and PLC backups

**Note:** Cleartext credentials. Block between zones.

**Port:** 22

**Proto:** TCP

**Service:** SSH and SFTP

**Typical:** Linux gateways, switches

**Note:** Allow only from jump host.

**Port:** 23

**Proto:** TCP

**Service:** Telnet

**Typical:** Old switches and controllers

**Note:** Cleartext. Disable.

**Port:** 53

**Proto:** TCP/UDP

**Service:** DNS

**Typical:** All networks

**Note:** Restrict to approved resolvers.

**Port:** 69

**Proto:** UDP

**Service:** TFTP

**Typical:** Firmware and config loads

**Note:** No authentication. Allow briefly.

**Port:** 88

**Proto:** TCP/UDP

**Service:** Kerberos

**Typical:** Windows domain

**Note:** Needed to domain controllers only.

**Port:** 102

**Proto:** TCP

**Service:** Siemens S7comm and ISO-TSAP, also IEC 61850 MMS

**Typical:** Siemens PLCs

**Note:** Allow only from engineering stations and HMIs.

**Port:** 123

**Proto:** UDP

**Service:** NTP

**Typical:** Time sync

**Note:** Use an internal time source.

**Port:** 135

**Proto:** TCP

**Service:** RPC endpoint mapper, used by classic OPC DCOM

**Typical:** Windows, OPC Classic

**Note:** Wide dynamic range follows. Prefer OPC UA.

**Port:** 161

**Proto:** UDP

**Service:** SNMP

**Typical:** Switches, UPS, printers

**Note:** Use SNMPv3, restrict to monitoring server.

**Port:** 162

**Proto:** UDP

**Service:** SNMP trap

**Typical:** Monitoring server

**Note:** Inbound to monitoring only.

**Port:** 389

**Proto:** TCP/UDP

**Service:** LDAP

**Typical:** Directory lookups

**Note:** Prefer LDAPS on 636.

**Port:** 443

**Proto:** TCP

**Service:** HTTPS

**Typical:** Web HMIs, cloud connectors, APIs

**Note:** Inspect and limit destinations.

**Port:** 445

**Proto:** TCP

**Service:** SMB

**Typical:** File shares, Windows hosts

**Note:** Primary ransomware spread path. Block between zones.

**Port:** 502

**Proto:** TCP

**Service:** Modbus TCP

**Typical:** PLCs, meters, drives

**Note:** No authentication. Allow specific master to slave pairs only.

**Port:** 636

**Proto:** TCP

**Service:** LDAPS

**Typical:** Directory lookups over TLS

**Note:** Preferred over 389.

**Port:** 1433

**Proto:** TCP

**Service:** Microsoft SQL Server

**Typical:** ERP, MES, historians

**Note:** Allow only from app servers.

**Port:** 1521

**Proto:** TCP

**Service:** Oracle listener (default)

**Typical:** Oracle databases

**Note:** Allow only from app servers.

**Port:** 1883

**Proto:** TCP

**Service:** MQTT

**Typical:** IIoT brokers

**Note:** Cleartext. Use 8883 with TLS.

**Port:** 2222

**Proto:** UDP

**Service:** EtherNet/IP implicit I/O

**Typical:** Rockwell and ODVA devices

**Note:** Cyclic I/O. Keep inside the cell.

**Port:** 2404

**Proto:** TCP

**Service:** IEC 60870-5-104

**Typical:** Utility and substation links

**Note:** No native security. Isolate.

**Port:** 3389

**Proto:** TCP

**Service:** RDP

**Typical:** Remote administration

**Note:** Never expose to the internet. Jump host only.

**Port:** 4840

**Proto:** TCP

**Service:** OPC UA (default)

**Typical:** Gateways, MES connectors

**Note:** Use signed and encrypted endpoints.

**Port:** 5000

**Proto:** TCP

**Service:** MTConnect agent (common default)

**Typical:** CNC data collection

**Note:** Read only data, but still restrict.

**Port:** 5900

**Proto:** TCP

**Service:** VNC

**Typical:** HMIs, remote screens

**Note:** Weak auth often. Tunnel through jump host.

**Port:** 5985

**Proto:** TCP

**Service:** WinRM HTTP

**Typical:** PowerShell remoting

**Note:** Admin hosts only.

**Port:** 5986

**Proto:** TCP

**Service:** WinRM HTTPS

**Typical:** PowerShell remoting over TLS

**Note:** Admin hosts only.

**Port:** 8193

**Proto:** TCP

**Service:** FANUC FOCAS (default)

**Typical:** FANUC CNC controls

**Note:** Allow only from collection server.

**Port:** 8883

**Proto:** TCP

**Service:** MQTT over TLS

**Typical:** IIoT brokers

**Note:** Preferred to 1883.

**Port:** 9600

**Proto:** UDP/TCP

**Service:** Omron FINS

**Typical:** Omron PLCs

**Note:** No authentication by default.

**Port:** 20000

**Proto:** TCP/UDP

**Service:** DNP3

**Typical:** Utilities, water, oil and gas

**Note:** Limited native security. Isolate.

**Port:** 34980

**Proto:** UDP

**Service:** EtherCAT over UDP

**Typical:** EtherCAT segments

**Note:** Keep local to the machine network.

**Port:** 44818

**Proto:** TCP/UDP

**Service:** EtherNet/IP explicit messaging (CIP)

**Typical:** Rockwell and ODVA devices

**Note:** Allow from engineering station only.

**Port:** 47808

**Proto:** UDP

**Service:** BACnet/IP

**Typical:** Building automation

**Note:** Keep in a separate building zone.

**Notes:** These are default ports. Vendors and integrators change them, so confirm with a passive capture or the device manual before writing a firewall rule. A port number alone does not prove which protocol is running.

## Content

**Intro:** When you write a firewall rule between the office and the plant you need the port, the transport and some sense of the risk. This table puts the common industrial and supporting IT ports in one filterable list.

**Sections:**

#### How to use it

**Body:** Search by protocol name or port to find what a flow in a firewall log probably is. Use the typical column to guess which device class is talking. Use the note column when drafting a rule: it tells you which side should initiate and what to avoid. Export to Excel to attach to a firewall change request or an OT network design.

**Bullets:**

- Search 502 to find Modbus TCP rules fast
- Compare cleartext protocols against their secure variants
- Attach the export to the change request

#### Why defaults matter

**Body:** Most industrial protocols were designed for isolated networks, so many have no authentication or encryption. A firewall that allows port 502 from the whole office subnet gives every laptop write access to a controller. Rules should name a specific master and specific slaves, and be limited to the direction the protocol needs.

#### Verifying what actually runs

**Body:** Defaults can be changed and many devices answer on unexpected ports. Before blocking anything on a live line, capture traffic from a mirror port for a full production cycle and compare it with this list. Block in monitor mode first, review the hits and then enforce. Unplanned blocks of cyclic I/O can stop a machine.

#### Common mistakes

**Body:** Allowing any to any on SMB between plant and office is the usual ransomware path. Leaving RDP and VNC open to vendors without a jump host is the second. Remember also that classic OPC over DCOM needs a wide dynamic port range, which is one more reason to move to OPC UA with a single configurable port.

**Cta:** If you need a ready-made firewall rule review for your plant network, Netray can map your flows to this list with you.

**Faq:**

#### Is Modbus TCP secure?

**Answer:** No. Standard Modbus TCP has no authentication or encryption, so any host that can reach port 502 can read and write registers. Protect it with segmentation, allow lists and, where available, a secure Modbus variant.

#### Which OPC UA port should I use?

**Answer:** 4840 is the registered default for discovery and many servers, but servers can run on any port. Check the endpoint URL in the server configuration and use signed and encrypted security modes.

#### Why is 445 flagged so often?

**Answer:** SMB is the main way ransomware moves between Windows hosts. Blocking it between zones, and between workstations, removes a large share of lateral movement paths.

#### Does a port tell me the protocol?

**Answer:** Not reliably. It is a strong hint only. Confirm with a packet capture or an OT monitoring tool that understands the protocol before building rules on the assumption.

## Search terms

modbus tcp port 502, ethernet/ip port 44818, siemens s7 port 102, opc ua default port 4840, ot firewall rules ports list, industrial protocol ports cheat sheet, ics port list for firewall

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json