# Conformal Coating Inspection Record Template

> Source: https://netray.co/tools/conformal-coating-inspection-record-template
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A fill-in inspection record for conformal coating on printed circuit assemblies: material, cure, thickness, coverage, keep-out areas and disposition.

## Category

industry-templates

## Industry

Defense Electronics

## Audience

- Quality engineer
- Process engineer
- Production supervisor

## Tool

**Kind:** template

**Output:** document

**Fields:**

#### Company name

**Key:** company

**Type:** text

**Default:** Harbor Electronics Inc.

#### Assembly part number

**Key:** assembly_pn

**Type:** text

**Default:** A-704210-03

#### Serial or lot number

**Key:** serial

**Type:** text

**Default:** SN 0147 to SN 0162

#### Work order

**Key:** work_order

**Type:** text

**Default:** WO-558214

#### Inspection date

**Key:** date

**Type:** date

**Default:** 2026-10-20

#### Coating chemistry

**Key:** coating_type

**Type:** select

**Options:**

- Acrylic (AR)
- Urethane (UR)
- Silicone (SR)
- Epoxy (ER)
- Parylene (XY)

**Default:** Urethane (UR)

#### Coating material lot and expiry

**Key:** coating_lot

**Type:** text

**Default:** Lot UC-22091, exp 2027-03-31

#### Required thickness

**Key:** thickness_req

**Type:** text

**Default:** 0.05 to 0.13 mm (0.002 to 0.005 in)

#### Cure schedule

**Key:** cure

**Type:** text

**Default:** 30 min air dry, then 60 min at 65 C

#### Measured thickness range

**Key:** thickness_actual

**Type:** text

**Default:** 0.06 to 0.11 mm

#### Inspection result

**Key:** result

**Type:** select

**Options:**

- Accept
- Rework coating
- Reject
- Hold for MRB

**Default:** Accept

#### Findings and notes

**Key:** findings

**Type:** textarea

**Default:** Full coverage on all component sides. Connector J3 keep-out masked correctly. No bubbles over 0.25 mm in critical areas.

**Blocks:**

#### Conformal Coating Inspection Record

**Body:** Company: {{company}}
Assembly: {{assembly_pn}}
Serial or lot: {{serial}}
Work order: {{work_order}}
Inspection date: {{date}}

#### Material and Process

**Body:** Coating chemistry: {{coating_type}}
Material lot and expiry: {{coating_lot}}
Required thickness: {{thickness_req}}
Cure schedule: {{cure}}
Measured thickness range: {{thickness_actual}}

#### Inspection Points

**Table:**

**Columns:**

- Check
- Requirement
- Result (Y/N/NA)
- Initials

**Rows:**

**0:** Keep-out areas masked and clean

**1:** Connectors, test points, heat sinks, adjustable parts

**0:** Coverage on all required surfaces

**1:** Per drawing coating note

**0:** Bubbles, voids, dewetting

**1:** Per customer or workmanship criteria

**0:** Cracks, peeling, delamination

**1:** None allowed

**0:** Thickness measured

**1:** Per drawing, method recorded

**0:** UV tracer check (if used)

**1:** Visible and uniform under UV

**0:** Foreign material under coating

**1:** None in critical spacing

#### Result and Findings

**Body:** Result: {{result}}

{{findings}}

#### Approvals

**Signatures:**

- Coating operator
- Inspector
- Quality representative

**Notes:** Use your drawing coating note and customer workmanship standard for pass/fail limits. The check list shows common points only. Record the thickness method (wet film gauge, dry film eddy current or witness coupon).

## Content

**Intro:** Conformal coating protects defense electronics from moisture, salt fog, fungus and contamination, and it is one of the steps auditors look at closely. This template gives you a repeatable inspection record you can fill in, print and file with the traveler.

**Sections:**

#### How to use this record

**Body:** Fill in the header fields for the assembly, work order and coating material, then complete the inspection points table by hand or in the exported Word or Excel file. Export a PDF for the build record. Create one record per lot or per serial number depending on your customer's traceability rule. Keep the coating material lot and expiry on the record because a material problem found later must be traceable to the assemblies it touched.

#### Where the criteria come from

**Body:** Most defense primes call out IPC-CC-830 for coating qualification and IPC-A-610 for workmanship acceptance, plus the drawing's coating note. The coating note sets the chemistry, keep-out areas and thickness range. Thickness is checked on the board surface or on a witness coupon processed with the lot. Parylene is measured differently from liquid coatings, so state the method on the record.

**Bullets:**

- Drawing coating note and thickness range
- Customer workmanship or source inspection requirements
- IPC-A-610 coating section for visual acceptance
- Material data sheet for cure time and temperature

#### Common mistakes

**Body:** The most common escape is coating over a keep-out area, such as a connector contact or a thermal pad, because masking was missed. Next is inspecting only under white light when the drawing calls for UV tracer inspection. Others include recording a single thickness reading instead of a range, forgetting to record material expiry, and releasing an assembly before the cure schedule has finished. A signature line for the inspector and the operator keeps accountability clear.

**Cta:** If your coating results live in a traveler, MES or ERP, Netray can help route inspection results into the work order record automatically.

**Faq:**

#### What thickness should conformal coating be?

**Answer:** It depends on chemistry and the drawing. Many specifications give 0.03 to 0.13 mm for acrylic, urethane and epoxy, and a thinner range for parylene. Always follow your drawing note or customer specification, not a generic number.

#### Do I need a record for every board?

**Answer:** Not always. Many programs record per lot with a sample of thickness readings, while others require per serial number. Check your quality plan and customer flow-down before deciding.

#### How do I check coverage?

**Answer:** Most shops use a UV tracer in the coating and inspect under a black light, then confirm visual criteria under magnification. Record the method on the form so the result can be reproduced.

#### Can I reuse this for parylene?

**Answer:** Yes, change the coating chemistry field and thickness method. Parylene is vapor deposited, so also record the chamber run number and witness coupon results.