# Cost of Goods Manufactured Calculator

> Source: https://netray.co/tools/cost-of-goods-manufactured-calculator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Build the schedule of cost of goods manufactured from raw material, direct labor, overhead and work in process balances, and get the unit cost.

## Category

cost-finance

## Industry

Discrete Manufacturing

## Audience

- CFO
- Controller
- Cost accountant

## Tool

**Kind:** calculator

**Currency:** $

**Inputs:**

#### Beginning raw materials inventory

**Key:** dm_beg

**Type:** number

**Default:** 120000

**Min:** 0

**Step:** 1000

**Unit:** $

#### Raw material purchases

**Key:** dm_purch

**Type:** number

**Default:** 640000

**Min:** 0

**Step:** 1000

**Unit:** $

**Help:** Include freight-in and net of purchase returns and discounts.

#### Ending raw materials inventory

**Key:** dm_end

**Type:** number

**Default:** 135000

**Min:** 0

**Step:** 1000

**Unit:** $

#### Direct labor

**Key:** dl

**Type:** number

**Default:** 410000

**Min:** 0

**Step:** 1000

**Unit:** $

#### Manufacturing overhead applied or incurred

**Key:** oh

**Type:** number

**Default:** 365000

**Min:** 0

**Step:** 1000

**Unit:** $

**Help:** Indirect labor, factory utilities, depreciation of plant equipment, supervision, indirect materials.

#### Beginning work in process

**Key:** wip_beg

**Type:** number

**Default:** 95000

**Min:** 0

**Step:** 1000

**Unit:** $

#### Ending work in process

**Key:** wip_end

**Type:** number

**Default:** 110000

**Min:** 0

**Step:** 1000

**Unit:** $

#### Units completed in period

**Key:** units

**Type:** number

**Default:** 52000

**Min:** 1

**Step:** 100

**Unit:** units

**Outputs:**

#### Direct materials used

**Key:** dm_used

**Expr:** dm_beg + dm_purch - dm_end

**Format:** currency

#### Prime cost

**Key:** prime

**Expr:** dm_used + dl

**Format:** currency

**Description:** Direct materials plus direct labor.

#### Total manufacturing costs added

**Key:** total_mfg

**Expr:** prime + oh

**Format:** currency

#### Cost of goods manufactured

**Key:** cogm

**Expr:** total_mfg + wip_beg - wip_end

**Format:** currency

**Primary:** true

#### Cost per unit completed

**Key:** unit_cost

**Expr:** cogm / units

**Format:** currency

**Primary:** true

#### Overhead as share of manufacturing costs

**Key:** oh_share

**Expr:** oh / total_mfg * 100

**Format:** percent

**Chart:**

#### Unit cost vs units completed

**Type:** line

**X:** units

**From:** 20000

**To:** 100000

**Steps:** 30

**Series:**

- unit_cost

**Disclaimer:** This calculator follows the standard managerial accounting schedule. Your costing policy (absorption rules, capitalized variances, scrap treatment) may change the inputs.

## Content

**Intro:** Cost of goods manufactured is the total cost of the units that finished production in a period, whether or not they were sold. It feeds finished goods inventory and, once sold, cost of goods sold. This calculator walks the standard schedule from raw material to finished output.

**Sections:**

#### How to use the calculator

**Body:** Enter your period balances from the trial balance. Start with raw material beginning inventory, purchases and ending inventory to get direct materials used. Add direct labor and manufacturing overhead to get total manufacturing costs added, then adjust for the change in work in process. The result is COGM and the average cost per completed unit. Use the same period for every balance, and use units that actually completed, not units started.

**Bullets:**

- Use purchases net of returns and discounts, plus freight-in
- Overhead can be applied (at a predetermined rate) or actual, but be consistent
- Units completed excludes ending WIP, unless you convert WIP to equivalent units
- Run it monthly so the unit cost trend is visible

#### The formula and where COGM sits

**Body:** COGM = beginning WIP + direct materials used + direct labor + manufacturing overhead - ending WIP. Direct materials used = beginning raw materials + purchases - ending raw materials. COGM then flows into the cost of goods sold schedule: beginning finished goods + COGM - ending finished goods = COGS. Mixing these up is the most common reporting error: COGM is production cost, COGS is cost of what you shipped.

#### Worked example and how to read it

**Body:** With the default values, materials used are 625,000 and prime cost is 1,035,000. Adding 365,000 of overhead gives 1,400,000, and the 15,000 build in WIP lowers COGM to 1,385,000. Over 52,000 units that is about 26.63 per unit. Watch the overhead share: when it climbs while volume falls, fixed costs are spreading over fewer units, which the chart shows as unit cost rising at low volume.

#### Common mistakes and ERP notes

**Body:** Do not include selling and administrative expense in COGM. Do not forget that standard cost systems carry variances: if your ERP posts purchase price, usage and efficiency variances to separate accounts, decide whether COGM is at standard or at actual. In SAP this sits in the production order settlement, in Infor SyteLine and Epicor in the job or work order close, and in NetSuite in the work order completion and variance postings. Reconcile the calculator to the general ledger before using the unit cost for pricing.

**Cta:** If your ERP already holds these balances, we can build a read-only view that produces the COGM schedule by plant and period without re-keying. Ask for an expert review of your costing flow.

**Faq:**

#### What is the difference between COGM and COGS?

**Answer:** COGM is the cost of everything completed in production during the period. COGS is the cost of the goods actually sold. COGS equals beginning finished goods plus COGM minus ending finished goods, so the two differ by the change in finished goods inventory.

#### Does COGM include labor that is not direct?

**Answer:** Indirect labor such as supervisors, material handlers and maintenance on production equipment is part of manufacturing overhead, so it is included in COGM through the overhead line. Only direct labor goes on the direct labor line.

#### Should I use applied or actual overhead?

**Answer:** Either is valid, but be consistent with your books. With applied overhead, the over or under applied amount is usually cleared to COGS at period end. With actual overhead the unit cost moves with volume, which is why many plants prefer a predetermined rate.

#### Can I use this for a service or job shop?

**Answer:** Yes for a job shop, if you treat all completed jobs as the period output and enter units as jobs or standard hours. For a pure service business there is no manufacturing schedule, so COGM does not apply.

## Search terms

cost of goods manufactured calculator, COGM formula, schedule of cost of goods manufactured, cost of goods manufactured example, COGM vs COGS, manufacturing cost statement, cost of goods manufactured excel, unit cost of production calculator

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
