# Demand Variability (CV) and XYZ Classification Calculator

> Source: https://netray.co/tools/demand-variability-cv-xyz-classification-calculator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Turn mean demand, standard deviation and average demand interval into a CV, an XYZ class and a Syntetos-Boylan demand pattern so you can pick the right forecast method.

## Category

supply-chain

## Audience

- Demand planner
- Supply planner
- Inventory analyst

## Tool

**Kind:** calculator

**Inputs:**

#### Mean demand per period

**Key:** mean

**Type:** number

**Default:** 480

**Min:** 0

**Step:** 10

**Unit:** units

**Help:** Average demand per period over your history window, for example the last 24 months.

#### Standard deviation of demand

**Key:** sigma

**Type:** number

**Default:** 190

**Min:** 0

**Step:** 5

**Unit:** units

**Help:** Sample standard deviation of the same period series.

#### Average demand interval (ADI)

**Key:** adi

**Type:** number

**Default:** 1.1

**Min:** 1

**Step:** 0.1

**Unit:** periods

**Help:** Total periods divided by number of periods with non-zero demand. 1.0 means demand every period.

#### X class upper CV limit

**Key:** x_limit

**Type:** number

**Default:** 0.5

**Min:** 0

**Step:** 0.05

**Help:** Items at or below this CV are class X (stable). Many sites use 0.5.

#### Y class upper CV limit

**Key:** y_limit

**Type:** number

**Default:** 1

**Min:** 0

**Step:** 0.05

**Help:** Items above X limit and up to this value are class Y. Above it is class Z.

**Outputs:**

#### Coefficient of variation (CV)

**Key:** cv

**Expr:** sigma / mean

**Format:** decimal

**Primary:** true

**Description:** Standard deviation divided by mean demand.

#### CV as percent

**Key:** cv_pct

**Expr:** cv * 100

**Format:** percent

#### CV squared

**Key:** cv2

**Expr:** cv * cv

**Format:** decimal

**Description:** Compared with 0.49 in the Syntetos-Boylan scheme.

#### XYZ class (1 = X, 2 = Y, 3 = Z)

**Key:** xyz

**Expr:** if(lte(cv, x_limit), 1, if(lte(cv, y_limit), 2, 3))

**Format:** integer

#### Demand pattern (1 smooth, 2 erratic, 3 intermittent, 4 lumpy)

**Key:** pattern

**Expr:** if(lt(adi, 1.32), if(lt(cv2, 0.49), 1, 2), if(lt(cv2, 0.49), 3, 4))

**Format:** integer

**Primary:** true

**Description:** Cut-offs ADI 1.32 and CV squared 0.49.

**Chart:**

#### CV as standard deviation rises

**Type:** line

**X:** sigma

**From:** 0

**To:** 600

**Steps:** 30

**Series:**

- cv

**Disclaimer:** Classification cut-offs are conventions, not laws. Tune the CV limits to your own item population and review them yearly.

## Content

**Intro:** Before choosing a forecast method you need to know how noisy an item is. The coefficient of variation (CV) and the average demand interval (ADI) place every SKU in an XYZ class and in one of four demand patterns. This calculator does both from three numbers.

**Sections:**

#### How to use it

**Body:** Pull the last 18 to 36 periods of demand for the item at the level you forecast, such as SKU by month. Enter the mean and the sample standard deviation, then enter ADI, which is the number of periods divided by the number of periods that had any demand. Set your X and Y limits and read the class and pattern. Run the same logic across the catalogue in a spreadsheet or the ERP once you trust the cut-offs.

**Bullets:**

- Use the same period bucket you plan in
- Exclude one-off bulk orders only if you will also exclude them from the forecast
- Use at least 12 periods
- Recompute quarterly

#### The method behind it

**Body:** CV is sigma divided by mean. XYZ analysis ranks items by this CV: X items are stable, Y have trend or seasonality and moderate noise, Z are erratic. The Syntetos-Boylan scheme adds ADI and CV squared: ADI below 1.32 with CV squared below 0.49 is smooth, ADI below 1.32 with higher CV squared is erratic, ADI above 1.32 with low CV squared is intermittent and above both is lumpy. Smooth items suit exponential smoothing, intermittent and lumpy items suit Croston or SBA style methods.

#### Reading the result with an example

**Body:** Mean 480, sigma 190 gives CV 0.40, class X. With ADI 1.1 the item is smooth, so a simple statistical model should do well and safety stock can be driven by a normal error assumption. If sigma rises to 600 the CV passes 1.25, the item becomes class Z and erratic, and you should expect poor forecast accuracy and higher safety stock, or consider make-to-order or postponement for it.

#### Common mistakes

**Body:** Calculating CV on a series that contains a strong trend or seasonality overstates noise, because part of the movement is predictable. Detrend or compare against forecast error instead when you can. Another mistake is mixing channels or pooling distinct customers, which hides intermittency. Finally, do not treat the class as permanent: new products and phase-outs change class quickly.

**Cta:** If you want this classification run across every item in your ERP and fed into the right forecast method automatically, Netray can build a read-only analysis over your item and demand history.

**Faq:**

#### What is a good CV for demand?

**Answer:** There is no universal value, but below about 0.5 is usually considered stable and easy to forecast, 0.5 to 1.0 moderate, and above 1.0 erratic. Compare against your own portfolio and check whether trend or seasonality is inflating the figure.

#### What is the difference between ABC and XYZ?

**Answer:** ABC ranks items by value or volume, showing where money is. XYZ ranks by variability, showing how hard demand is to predict. Combining them gives nine cells, for example AZ items are valuable and unpredictable and deserve the most planning attention.

#### Why do ADI 1.32 and CV squared 0.49 matter?

**Answer:** They are the cut-offs from research by Syntetos and Boylan on when Croston type methods beat simple exponential smoothing. They are a practical rule of thumb, not exact boundaries.

#### Should zero periods be included in the mean?

**Answer:** Yes, for forecasting at the period level include zeros in mean and sigma, because they are real periods with no demand. ADI then describes how often demand actually occurs.

## Search terms

coefficient of variation demand calculator, xyz classification calculator, demand variability calculator, adi cv2 classification, smooth erratic intermittent lumpy demand, xyz analysis inventory, demand pattern classification, forecastability cv

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
