# Distribution KPI Formula Reference for Distributors and ERP Reports

> Source: https://netray.co/tools/distribution-kpi-formula-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A searchable lookup of the standard KPI formulas a distributor tracks, with units, direction of good and common data traps.

## Category

supply-chain

## Industry

Wholesale Distribution

## Audience

- Distribution manager
- Purchasing manager
- ERP report writer
- Controller

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### KPI

**Key:** kpi

**Type:** text

#### Formula

**Key:** formula

**Type:** text

#### Unit

**Key:** unit

**Type:** text

#### Good direction

**Key:** good

**Type:** text

#### Common data trap

**Key:** trap

**Type:** text

**Rows:**

**Kpi:** Line fill rate

**Formula:** Order lines shipped complete on first ship / total order lines

**Unit:** Percent

**Good:** Higher

**Trap:** Decide whether partial shipments count as filled

**Kpi:** Order fill rate

**Formula:** Orders shipped complete / total orders

**Unit:** Percent

**Good:** Higher

**Trap:** Much stricter than line fill, do not compare the two

**Kpi:** Unit fill rate

**Formula:** Units shipped / units ordered

**Unit:** Percent

**Good:** Higher

**Trap:** Cancelled quantity must be excluded from the denominator or flagged

**Kpi:** On-time in-full (OTIF)

**Formula:** Orders or lines both on time and complete / total

**Unit:** Percent

**Good:** Higher

**Trap:** Compare against promise date or request date, not both

**Kpi:** Inventory turns

**Formula:** Annual cost of goods sold / average inventory at cost

**Unit:** Times per year

**Good:** Higher

**Trap:** Use average inventory, not a single month-end snapshot

**Kpi:** Days of supply

**Formula:** On-hand quantity / average daily usage

**Unit:** Days

**Good:** Within target band

**Trap:** Seasonal items need a forward-looking usage figure

**Kpi:** Days inventory outstanding

**Formula:** Average inventory / COGS x 365

**Unit:** Days

**Good:** Lower

**Trap:** Includes obsolete stock that distorts the average

**Kpi:** GMROI

**Formula:** Gross margin dollars / average inventory at cost

**Unit:** Ratio

**Good:** Higher

**Trap:** Margin and inventory must cover the same period and items

**Kpi:** Gross margin percent

**Formula:** (Sales - cost of goods sold) / sales

**Unit:** Percent

**Good:** Higher

**Trap:** Rebates and freight treatment change the answer

**Kpi:** Markup percent

**Formula:** (Sales - cost) / cost

**Unit:** Percent

**Good:** Higher

**Trap:** Often confused with margin percent

**Kpi:** Dead stock percent

**Formula:** Inventory value with no sale in 12 months / total inventory value

**Unit:** Percent

**Good:** Lower

**Trap:** Choose the look-back window and keep it fixed

**Kpi:** Stockout rate

**Formula:** Demand lines hitting zero available / total demand lines

**Unit:** Percent

**Good:** Lower

**Trap:** Needs demand captured even when stock was zero

**Kpi:** Backorder rate

**Formula:** Backordered lines / total lines ordered

**Unit:** Percent

**Good:** Lower

**Trap:** Release date matters when you compare periods

**Kpi:** Perfect order rate

**Formula:** On time x complete x damage free x correct documents

**Unit:** Percent

**Good:** Higher

**Trap:** Multiplying four measures drops the result sharply

**Kpi:** Return rate

**Formula:** Returned lines or value / shipped lines or value

**Unit:** Percent

**Good:** Lower

**Trap:** Separate vendor-error returns from customer-choice returns

**Kpi:** Days sales outstanding (DSO)

**Formula:** Accounts receivable / credit sales x days in period

**Unit:** Days

**Good:** Lower

**Trap:** Cash and counter sales must be excluded

**Kpi:** Days payable outstanding (DPO)

**Formula:** Accounts payable / COGS x days in period

**Unit:** Days

**Good:** Within vendor terms

**Trap:** Early-pay discounts change the target

**Kpi:** Cash conversion cycle

**Formula:** DIO + DSO - DPO

**Unit:** Days

**Good:** Lower

**Trap:** All three inputs need the same period basis

**Kpi:** Order lines per pick hour

**Formula:** Lines picked / direct picking hours

**Unit:** Lines per hour

**Good:** Higher

**Trap:** Include only direct labor hours

**Kpi:** Cost to serve per order

**Formula:** (Handling + freight + admin cost) / orders

**Unit:** Currency per order

**Good:** Lower

**Trap:** Allocation rules drive the result

**Kpi:** Sales per square foot

**Formula:** Net sales / warehouse or branch square feet

**Unit:** Currency per sq ft

**Good:** Higher

**Trap:** Use usable selling or storage area consistently

**Kpi:** Vendor on-time delivery

**Formula:** Receipts on or before promise date / total receipts

**Unit:** Percent

**Good:** Higher

**Trap:** Promise date edits after the fact hide misses

**Kpi:** Inventory accuracy

**Formula:** Locations matching count / locations counted

**Unit:** Percent

**Good:** Higher

**Trap:** Tolerance rules differ for high-value items

**Kpi:** Carrying cost rate

**Formula:** Capital + storage + insurance + shrink + obsolescence / average inventory

**Unit:** Percent per year

**Good:** Lower

**Trap:** Many sites forget obsolescence and shrink

**Notes:** Definitions vary by company. Write down your own numerator, denominator and period rules before you publish a KPI, and keep them fixed from month to month.

## Content

**Intro:** Distributors measure the same dozen ideas under slightly different names, and the arguments in a monthly review are usually about definitions, not performance. This reference lists the common distribution KPIs with their formula, unit and the data trap that most often skews them.

**Sections:**

#### How to use the reference

**Body:** Search for a KPI name or a word from the formula, then copy the definition into your report specification. Decide the period, the item scope and the treatment of cancelled or returned quantity before anyone builds the report. Write the decision beside the KPI so the next analyst does not redefine it. Export the table to Excel to use as the data dictionary of your dashboard project.

**Bullets:**

- Search by KPI name, formula word or unit
- Copy the formula into the report spec
- Record the period and scope rule next to each KPI
- Review definitions once a year, not every month

#### Service level versus financial KPIs

**Body:** Service KPIs such as line fill rate, OTIF and backorder rate describe what the customer felt. Financial KPIs such as GMROI, turns and gross margin describe what the stock cost you. A distributor can push fill rate to the high nineties by overstocking, and the financial KPIs will show the price. Always read one service KPI together with one inventory KPI so that a change in one is checked against the other.

#### Worked example

**Body:** A branch has 4,000 order lines in a month and 3,700 ship complete on first ship, so line fill is 92.5 percent. The same branch holds an average of 900,000 in inventory at cost and sells goods with a cost of 5.4 million over the year, so turns are 6.0 and days inventory outstanding is about 61. If gross margin dollars for the year are 1.35 million, GMROI is 1.5. Together these say the branch is serving well but carrying a moderate amount of stock for the margin it earns.

#### Where the numbers come from in an ERP

**Body:** Most distribution ERPs hold order lines, shipment confirmations, inventory balances by location and invoice history in separate tables, so each KPI is a join across them. Fill rate needs the requested and shipped quantity on the same line. Turns need a month-end inventory history, which some systems do not keep unless a snapshot job runs. Check that history exists before you promise a trend chart.

**Cta:** If these KPIs live in several ERP screens and spreadsheets today, we can help you build a single read-only view over your own data, with the query shown for every number.

**Faq:**

#### What is the difference between fill rate and OTIF?

**Answer:** Fill rate measures whether the quantity ordered was available and shipped. OTIF adds a time test, so an order must be complete and also arrive on or before the agreed date. OTIF is always equal to or lower than fill rate for the same orders.

#### Is GMROI better than inventory turns?

**Answer:** They answer different questions. Turns show how fast stock moves, while GMROI shows how much gross margin each dollar of inventory earns. A slow item with a high margin can have good GMROI and poor turns, so most distributors watch both.

#### Which period should I use for turns?

**Answer:** Use a trailing twelve months of cost of goods sold over the average of month-end inventory for the same twelve months. Short periods swing with seasons and large receipts, so annualizing one month is risky.

#### Do these formulas match my ERP standard reports?

**Answer:** Not always. ERP standard reports apply their own rules for cancelled quantity, returns and transfers. Compare one branch and one month by hand against your ERP report before you trust a new dashboard.

## Search terms

distribution kpi formulas, distributor kpi list, gmroi formula, inventory turns formula distribution, fill rate formula, days of supply formula, wholesale distribution metrics, distribution dashboard kpis

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
