# Downtime Reason Code Hierarchy Reference

> Source: https://netray.co/tools/downtime-reason-code-hierarchy-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A starter list of downtime reason codes arranged in a hierarchy, mapped to the six big losses and to planned or unplanned status.

## Category

mes-shop-floor

## Industry

Discrete Manufacturing

## Audience

- Continuous improvement manager
- Production supervisor
- MES engineer

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Level 1 group

**Key:** level1

**Type:** text

#### Level 2 reason

**Key:** level2

**Type:** text

#### Big loss

**Key:** loss

**Type:** text

#### Planned or unplanned

**Key:** status

**Type:** text

#### Example

**Key:** example

**Type:** text

**Rows:**

**Level1:** Equipment failure

**Level2:** Mechanical breakdown

**Loss:** Breakdowns

**Status:** Unplanned

**Example:** Broken drive belt on conveyor

**Level1:** Equipment failure

**Level2:** Electrical fault

**Loss:** Breakdowns

**Status:** Unplanned

**Example:** Contactor failure on a spindle motor

**Level1:** Equipment failure

**Level2:** Controls or software fault

**Loss:** Breakdowns

**Status:** Unplanned

**Example:** PLC fault that needs reset and restart

**Level1:** Equipment failure

**Level2:** Tool breakage

**Loss:** Breakdowns

**Status:** Unplanned

**Example:** Broken end mill mid cycle

**Level1:** Setup and changeover

**Level2:** Product changeover

**Loss:** Setup and adjustments

**Status:** Planned

**Example:** Switch from part A to part B

**Level1:** Setup and changeover

**Level2:** Tooling change

**Loss:** Setup and adjustments

**Status:** Planned

**Example:** Fixture swap

**Level1:** Setup and changeover

**Level2:** First off approval wait

**Loss:** Setup and adjustments

**Status:** Unplanned

**Example:** Waiting for quality to approve the first piece

**Level1:** Setup and changeover

**Level2:** Adjustment after setup

**Loss:** Setup and adjustments

**Status:** Unplanned

**Example:** Re-zeroing offsets after a trial part

**Level1:** Material

**Level2:** Material shortage

**Loss:** Breakdowns

**Status:** Unplanned

**Example:** Bar stock not delivered to the cell

**Level1:** Material

**Level2:** Wrong or incorrect material

**Loss:** Breakdowns

**Status:** Unplanned

**Example:** Wrong lot staged

**Level1:** Material

**Level2:** Material jam or feed fault

**Loss:** Small stops

**Status:** Unplanned

**Example:** Part jam at the feeder

**Level1:** Minor stoppage

**Level2:** Sensor blocked or misread

**Loss:** Small stops

**Status:** Unplanned

**Example:** Dust on a photo eye

**Level1:** Minor stoppage

**Level2:** Cleaning during run

**Loss:** Small stops

**Status:** Unplanned

**Example:** Chip clearing

**Level1:** Minor stoppage

**Level2:** Operator intervention

**Loss:** Small stops

**Status:** Unplanned

**Example:** Manual reset of an alarm

**Level1:** Speed

**Level2:** Running below rated speed

**Loss:** Reduced speed

**Status:** Unplanned

**Example:** Feed rate reduced to avoid chatter

**Level1:** Speed

**Level2:** Worn equipment

**Loss:** Reduced speed

**Status:** Unplanned

**Example:** Machine run slower to hold tolerance

**Level1:** Quality

**Level2:** Startup rejects

**Loss:** Startup rejects

**Status:** Unplanned

**Example:** Scrap until the process warms up

**Level1:** Quality

**Level2:** Production rejects

**Loss:** Production rejects

**Status:** Unplanned

**Example:** Out of tolerance part found at inspection

**Level1:** Quality

**Level2:** Rework

**Loss:** Production rejects

**Status:** Unplanned

**Example:** Part sent for secondary operation

**Level1:** People

**Level2:** No operator available

**Loss:** Breakdowns

**Status:** Unplanned

**Example:** Operator pulled to another line

**Level1:** People

**Level2:** Shift change handover

**Loss:** Setup and adjustments

**Status:** Planned

**Example:** Scheduled handover time

**Level1:** Planned stop

**Level2:** Scheduled maintenance

**Loss:** Not a loss in OEE

**Status:** Planned

**Example:** Preventive maintenance slot

**Level1:** Planned stop

**Level2:** Break or meal

**Loss:** Not a loss in OEE

**Status:** Planned

**Example:** Scheduled break

**Level1:** Planned stop

**Level2:** No demand or no order

**Loss:** Not a loss in OEE

**Status:** Planned

**Example:** Nothing scheduled

**Level1:** Utilities

**Level2:** Power or air supply loss

**Loss:** Breakdowns

**Status:** Unplanned

**Example:** Compressed air pressure drop

**Notes:** Keep the list short enough that operators can pick a reason in a few seconds. Whether a reason counts against OEE depends on your planned time rules, so confirm before you load the codes into a system.

## Content

**Intro:** Downtime data is only useful if reasons are consistent. This table gives a starter hierarchy of reason codes, tied to the six big losses so each stop lands in the right loss bucket.

**Sections:**

#### How to use the table

**Body:** Start from level 1 groups, then trim level 2 reasons to those that happen on your equipment. Operators should see no more than about ten choices per screen. Copy the result to Excel as the reason code master for your MES, your ERP downtime posting or a paper log.

**Bullets:**

- Delete reasons that never happen
- Add equipment specific faults at level 3
- Mark each code planned or unplanned

#### Mapping to the six big losses

**Body:** The six big losses are breakdowns, setup and adjustments, small stops, reduced speed, startup rejects and production rejects. The first two are availability losses, the next two are performance losses and the last two are quality losses. Mapping each code to one of these keeps reports consistent and lets you see which factor is dragging OEE.

#### Making the codes usable

**Body:** Short names beat long descriptions. Avoid an Other code, or limit it and review it weekly, because it grows quickly and hides the real causes. Require a reason for any stop longer than your threshold and let small stops be counted automatically if the machine can report them.

#### Common mistakes

**Body:** Plants often build too many codes, mix causes with symptoms and let supervisors assign reasons days later from memory. Capture the reason at the time of the stop, and review code use monthly so the list stays honest.

**Cta:** If you want downtime reasons captured against ERP work orders and reported without double entry, we can help design the posting flow.

**Faq:**

#### How many reason codes should I have?

**Answer:** Most plants do well with 20 to 40 codes in two or three levels. Operators should see a short list on screen. Add detail only where a loss is large enough to justify the extra data entry.

#### Should changeovers count as downtime?

**Answer:** Yes for improvement work. Changeovers are an availability loss that SMED projects target. If you exclude them from OEE, still record them separately so the time is visible.

#### What about small stops of a few seconds?

**Answer:** Operators cannot log them by hand. Use machine signals to count them automatically, or sample them in a short observation study. Group them under a single minor stoppage reason with a note.

#### Can I load these codes into my ERP?

**Answer:** Many ERPs and MES products support configurable downtime or non-production reason codes. Check the field names and length limits in your own system before loading, and keep a single master list.

## Search terms

downtime reason codes list, downtime codes for oee, machine downtime categories, six big losses codes, mes downtime reason hierarchy, stop reason code template

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
