# Dynamics GP 18.x In-Place Upgrade Checklist

> Source: https://netray.co/tools/dynamics-gp-18-x-in-place-upgrade-checklist
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A five-stage checklist for moving an on-prem GP 2016 or 2018 system to the current 18.x build, from lifecycle planning to post-upgrade posting tests.

## Category

microsoft-dynamics

## Erp

Microsoft Dynamics GP

## Audience

- ERP administrator
- GP consultant
- DBA

## Tool

**Kind:** checklist

**Groups:**

#### 1. Plan

**Items:**

Record the current build from Help > About Microsoft Dynamics GP on a client

Query DYNAMICS..DB_Upgrade and DYNAMICS..DU000020 to confirm every database and product is at the same version

**Text:** Confirm your starting build is a supported direct source for the target 18.x build in Microsoft's upgrade documentation; older releases need an intermediate hop

**Critical:** true

Note lifecycle: GP 2018 and 2018 R2 extended support ends January 11, 2028; installing any compatible tax release or hotfix moves you to 18.5+ and the Modern Lifecycle

Note that Microsoft ends GP support on December 31, 2029, with security updates if needed until April 30, 2031

**Text:** Confirm every ISV product (e.g. Mekorma, Binary Stream) has a build certified for the target 18.x release

**Critical:** true

Check the SQL Server and Windows versions against the target build's system requirements

List all modified forms and reports dictionaries (Forms.dic, Reports.dic) and third-party dictionaries in Dynamics.set

#### 2. Pre-upgrade data checks

**Items:**

Complete or time the upgrade around year-end and 1099 or payroll tax update requirements

Have all users log off; confirm DYNAMICS..ACTIVITY and SY00800 (batch activity) are empty

Confirm no batches are stuck in posting or marked for posting

Run Check Links on key series in a test copy if data integrity is doubtful

Run any pre-upgrade SQL scripts Microsoft publishes for your source and target versions

**Text:** Take full SQL backups of DYNAMICS and every company database and test a restore

**Critical:** true

Export Excel report, SmartList Designer and Management Reporter definitions you rely on

#### 3. Test upgrade

**Items:**

**Text:** Restore production backups to a test SQL Server and install the target GP build

**Critical:** true

Run GP Utilities to upgrade DYNAMICS, then each company, timing each one for the cutover plan

Review the GP Utilities upgrade messages and DB_Upgrade status for every company

Investigate any table conversion failure (community examples include PM00204) before going further

If a company upgrade fails, follow Microsoft's 'restart the upgrade of a company database' steps instead of re-running blindly

Upgrade modified dictionaries in the test client and confirm modified forms and reports open

Have key users run a scripted test of daily transactions in the test system

#### 4. Production cutover

**Items:**

**Text:** Repeat the backups immediately before cutover

**Critical:** true

**Text:** Install or update the GP client on every workstation and terminal server to the exact same build

**Critical:** true

Upgrade Web Client, Workflow and service-based architecture components if used

Upgrade Management Reporter, SSRS reports and Analysis Cubes to versions supported with the target build

Upgrade eConnect and Integration Manager to the matching 18.x version and retest integrations

Update ISV products in the order their vendors document

Point all clients at the shared Dynamics.set and upgraded dictionaries

#### 5. Post-upgrade validation

**Items:**

Post a test transaction in SOP, POP, Receivables, Payables and General Ledger

Run a payroll test if US Payroll is used and confirm the current tax table

Print key Word templates and Report Writer forms

Open critical SmartLists and redeploy Excel reports

Spot-check user security roles and Alternate/Modified Forms and Reports IDs

Confirm 1099 setup and the latest year-end update are in place

Compare trial balance and subledger totals before and after the upgrade

**Scoring Note:** Do not start production until every critical item in groups 1 to 3 is complete. A version mismatch between any client and the database blocks login.

## Content

**Intro:** This checklist plans an in-place upgrade of an on-premises Dynamics GP system from GP 2016 or GP 2018 to the current 18.x build under Microsoft's Modern Lifecycle. It covers the lifecycle dates, pre-checks, a timed test upgrade, cutover and the posting tests that prove it worked.

**Sections:**

#### How to use it

**Body:** Run the five groups in order and treat the test upgrade as mandatory: it gives you real timings per company and surfaces conversion errors before the business is waiting. Tick items as you confirm them, export to Excel and keep the completed list with your change record. Critical items are the ones that cause failed logins, broken integrations or a rollback when skipped. If you have many companies, time the largest one in test and add a margin for production.

#### Lifecycle facts to plan around

**Body:** Microsoft moved GP to the Modern Lifecycle in October 2019. Version 18.x stays supported as long as you keep taking the updates and tax releases Microsoft publishes for it. GP 2018 and 2018 R2 remain under the Fixed Lifecycle with extended support ending January 11, 2028, but installing any compatible tax release or hotfix moves them to 18.5 or later and the Modern policy. Microsoft has announced the end of GP support for enhancements, tax updates and technical support on December 31, 2029, with security updates if needed until April 30, 2031.

**Bullets:**

- GP 2016 and 2016 R2 extended support ended July 14, 2026
- Stay current means staying on a recent 18.x update
- Tax updates stop after December 31, 2029

#### Checking versions and restarting a failed company

**Body:** GP Utilities records versions in DYNAMICS..DB_Upgrade (one row per database and product) and upgrade progress in DYNAMICS..DU000020. Before and after each run, select from both tables and confirm every company and product shows the target version. If a company stops part way through, do not keep relaunching GP Utilities: follow Microsoft's troubleshooting article on restarting the upgrade of a company database, which resets the version information for that company so the upgrade reruns cleanly, after you fix the underlying table error. Restore the company backup if the error cannot be fixed.

#### Common mistakes

**Body:** The most expensive mistakes are an ISV product without a certified build, a forgotten terminal server still on the old client, and modified dictionaries that were not upgraded. Table conversion errors reported in the community, for example on PM00204, are usually data problems in that table on that system, so investigate the specific error text and the table contents rather than assuming a known cause. eConnect and Integration Manager must match the GP version, so integrations break silently if they are left on the old release.

**Cta:** If you are keeping GP on-prem through 2029 and want users to query it in plain English on your own servers, we can add that layer without touching the upgrade path.

**Faq:**

#### What is the upgrade path from GP 2018.3 to the latest 18.x?

**Answer:** GP 2018 (18.x) builds can generally be upgraded within the 18.x line by installing the newer build and running GP Utilities. Confirm your exact starting build is listed as a supported source in Microsoft's upgrade notes for the target release, and check that every ISV product has a matching build before you start.

#### How do I restart a Dynamics GP upgrade that failed on one company?

**Answer:** Fix the error first, using the GP Utilities message and the table it names. Then follow Microsoft's article on restarting the upgrade of a company database, which resets that company's version information in DB_Upgrade so GP Utilities treats it as not yet upgraded. If you cannot fix the data, restore the company backup and rerun.

#### What does the PM00204 upgrade error mean?

**Answer:** PM00204 has appeared in community threads as a table where conversion failed during an upgrade. The root cause varies by system, often data that violates the new table definition. Read the full error, query the table in a test copy, and fix or open a support case with the exact message. Do not apply another site's fix unchecked.

#### Do I have to upgrade 18.6 to 18.8 if 18.6 still works?

**Answer:** Under the Modern Lifecycle you need to stay on a recent update to keep getting fixes and tax updates. Staying on an old 18.x build works technically, but year-end and payroll tax releases target current builds. Plan at least one update per year until you leave GP.