# EDI Trading Partner Production Cutover Checklist

> Source: https://netray.co/tools/edi-trading-partner-production-cutover-checklist
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A pre go-live list for switching a partner from T to P without surprise rejects or lost orders.

## Category

supply-chain

## Audience

- EDI coordinator
- EDI analyst
- Supply chain manager

## Tool

**Kind:** checklist

**Groups:**

#### Connectivity and envelope

**Items:**

**Text:** Partner confirmed ISA05, ISA06, ISA07, ISA08 values in writing

**Critical:** true

ISA and GS padding checked at exactly 15 characters

**Text:** AS2, SFTP or VAN credentials and certificates tested and not near expiry

**Critical:** true

Firewall and IP allow lists in place for production endpoints

**Text:** ISA15 switched from T to P only on the agreed cutover date

**Critical:** true

Control number counters configured and set to start without overlap with test

Delimiters and character set confirmed with partner

#### Maps and data

**Items:**

**Text:** Every inbound and outbound transaction set tested with real examples

**Critical:** true

Unit of measure cross reference loaded for the partner

Customer part number to item cross reference complete

**Text:** Ship-to location table loaded and validated against partner list

**Critical:** true

Pricing and currency rules tested on sample orders

Partner-specific required segments (REF, DTM, N1) verified against guide

**Text:** Error handling for unmapped codes sends an alert, not a silent drop

**Critical:** true

#### Acknowledgments and compliance

**Items:**

**Text:** 997 or 999 received and matched for each test document

**Critical:** true

855, 856 and 810 timing rules documented (hours after order, before shipment)

**Text:** ASN and label formats approved by the partner

**Critical:** true

GS1-128 label data matches ASN data for each pack

Chargeback rules and compliance scorecard reviewed with the partner

Duplicate document detection enabled

Retention period for EDI files agreed and configured

#### Monitoring and fallback

**Items:**

**Text:** Alerts for failed transmissions and missing 997s routed to a named person

**Critical:** true

Daily check for orders received versus orders in ERP

**Text:** Manual fallback documented (email PO, portal) with owner and trigger

**Critical:** true

Partner contact list with escalation path for both sides

First five production documents reviewed manually end to end

Rollback step defined if the partner reports a critical issue

Hypercare window and owner agreed for the first two weeks

**Scoring Note:** Every critical item should be checked before the switch. If a critical item is open, agree a dated plan with the partner or delay cutover.

## Content

**Intro:** Moving an EDI partner from test to production is where small gaps become real shipments with real chargebacks. Use this list to check connectivity, maps, acknowledgments and fallback before ISA15 changes to P.

**Sections:**

#### How to use the checklist

**Body:** Work through the groups with the partner on a call, not alone. Tick items as you verify them with evidence: a test file, a 997, an email from the partner. The critical items are those that cause lost orders, rejected shipments or financial penalties if wrong. Export the finished list to PDF and keep it with the partner record as the cutover sign-off.

#### Plan the first week

**Body:** The first production documents deserve manual review. Compare what the partner sent with what arrived in the ERP, and compare each outbound document with the ERP source. Agree the daily check with the partner, and watch for the first 997 on each document type. Do not start a second partner cutover until the first has stable traffic and the compliance dashboard is clean.

**Bullets:**

- Review the first five documents of each type manually.
- Confirm 997 receipt within the agreed window.
- Track rejected documents by cause.
- Hold off new maps during the first week.

#### Common mistakes

**Body:** Teams often go live on the technical test alone and forget the business side: the ship-to table, the label data, the invoice timing. Another frequent gap is monitoring: a failed AS2 session at night means orders arrive late and nobody notices until the buyer calls. Make sure someone owns the alert, and that the manual fallback has been rehearsed at least once.

**Cta:** If cutovers are tracked in emails and spreadsheets, Netray can help set up a partner onboarding register that links checklist status to your ERP and EDI monitoring.

**Faq:**

#### How long should EDI testing last?

**Answer:** It depends on the number of transaction sets and the partner. A single 850 and 810 pair may take a few days, while full retail programs with ASN and labels often take several weeks. Plan time for partner review cycles.

#### Who approves going live?

**Answer:** Both sides. Typically the partner's EDI team approves the technical test and the business owner approves the order and shipping flow. Keep the approval in writing.

#### Should test and production use different control numbers?

**Answer:** Use separate counters or ranges. A production file reusing a test ISA13 may be dropped as a duplicate, and mixing them makes troubleshooting harder.

#### What is hypercare for EDI?

**Answer:** A short period after go-live, usually one to two weeks, when someone checks every document and alert daily and the partner is on call. It ends when error rates stabilize.

## Search terms

edi go live checklist, edi production cutover, edi test to production checklist, trading partner go live, edi onboarding checklist, edi cutover plan, x12 production switch, edi readiness checklist

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
