# Electronic Component Sourcing Resilience Assessment

> Source: https://netray.co/tools/electronic-component-sourcing-resilience-assessment
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Score your sourcing practices across sourcing breadth, forecasts, alternates, buffers, supplier terms and data quality to see where shortage exposure is greatest.

## Category

supply-chain

## Industry

Electronics Manufacturing

## Audience

- Electronics buyer
- Supply chain manager
- Operations director

## Tool

**Kind:** assessment

**Questions:**

#### What share of your high-value or long lead time components have at least one approved alternate or second source?

**Options:**

##### Under 20 percent

**Score:** 0

##### 20 to 50 percent

**Score:** 1

##### 50 to 80 percent

**Score:** 2

##### Over 80 percent

**Score:** 3

#### How do you share demand forecasts with component suppliers and distributors?

**Options:**

##### We do not share forecasts

**Score:** 0

##### Occasionally by email

**Score:** 1

##### Regular forecast for key parts

**Score:** 2

##### Regular forecast with agreed commitments or consignment on key parts

**Score:** 3

#### How current is your lifecycle and end-of-life monitoring?

**Options:**

##### We react to notices when they arrive

**Score:** 0

##### Reviewed ad hoc by engineering

**Score:** 1

##### Periodic review of key BOMs

**Score:** 2

##### Continuous monitoring linked to the item master and open orders

**Score:** 3

#### How do you set buffer stock for long lead time parts?

**Options:**

##### No policy, buy to demand

**Score:** 0

##### Rule of thumb by buyer

**Score:** 1

##### Policy by lead time class

**Score:** 2

##### Policy based on lead time variability and criticality, reviewed regularly

**Score:** 3

#### How is purchasing from non-franchised sources controlled?

**Options:**

##### Buyers decide case by case

**Score:** 0

##### Manager approval needed

**Score:** 1

##### Written policy with approval and inspection

**Score:** 2

##### Written policy, authorized sources first, testing and traceability for every exception

**Score:** 3

#### How accurate are your BOM data and manufacturer part numbers?

**Options:**

##### Frequent errors found at purchase

**Score:** 0

##### Occasional errors

**Score:** 1

##### Checked before release

**Score:** 2

##### Systematic scrub before release and after changes

**Score:** 3

#### How concentrated is your spend with a single distributor or region?

**Options:**

##### One distributor or region over 80 percent

**Score:** 0

##### Two sources over 80 percent

**Score:** 1

##### Spread with a clear primary

**Score:** 2

##### Spread by design with tested backups

**Score:** 3

#### How quickly can you identify which products are affected when a part goes short?

**Options:**

##### Days, manual search

**Score:** 0

##### Hours, using spreadsheets

**Score:** 1

##### Same day through ERP where-used

**Score:** 2

##### Minutes, with demand and revenue impact shown

**Score:** 3

#### How are supplier terms for allocation and cancellation handled?

**Options:**

##### Standard web terms, never reviewed

**Score:** 0

##### Reviewed only for large suppliers

**Score:** 1

##### Negotiated for key suppliers

**Score:** 2

##### Negotiated with agreed allocation and flexibility terms

**Score:** 3

#### How often do buyers, engineering and planning meet about shortages and alternates?

**Options:**

##### Only during a crisis

**Score:** 0

##### Monthly or less

**Score:** 1

##### Weekly

**Score:** 2

##### Weekly with a tracked action list

**Score:** 3

**Bands:**

#### Exposed

**Min:** 0

**Max:** 30

**Verdict:** Your sourcing relies on individual effort and luck. A single allocation event could stop production.

**Recommendations:**

- List your top 25 long lead time or single source parts and start alternate approvals on them
- Fix BOM data errors before the next release
- Set a written policy for non-franchised purchases

#### Reactive

**Min:** 31

**Max:** 55

**Verdict:** You have some controls but they depend on who is buying. Shortages are handled after they appear.

**Recommendations:**

- Share a rolling forecast with distributors for key parts
- Link lifecycle notices to open orders and BOM where-used
- Hold a weekly shortage meeting with engineering and planning

#### Managed

**Min:** 56

**Max:** 80

**Verdict:** Your sourcing is structured. The remaining gaps are speed of impact analysis and supplier flexibility.

**Recommendations:**

- Quantify revenue at risk per part so effort is prioritized
- Negotiate allocation and cancellation terms with key suppliers
- Test your backup sources with a small order

#### Resilient

**Min:** 81

**Max:** 100

**Verdict:** Your practices cover alternates, data quality, buffers and communication. Maintain them as the product mix changes.

**Recommendations:**

- Review buffer policy each quarter against lead time trends
- Audit alternate approvals for expiry or changes
- Document the process so it survives staff changes

## Content

**Intro:** Component shortages rarely come from one failure. They come from single sourcing, poor forecasts, bad BOM data and late warning of end-of-life. This assessment scores ten sourcing practices and shows which gaps to close first.

**Sections:**

#### How to use the assessment

**Body:** Answer each question for the products and suppliers that matter most, not for the average part. Be honest about practice rather than policy, since a written rule that nobody follows scores as no rule. The result shows a band and recommended next steps. Repeat it each quarter and compare, or ask buyers, planners and engineers to answer separately and discuss the differences.

**Bullets:**

- Answer for your critical parts first
- Score what is done, not what is written
- Share results with engineering and planning

#### What the questions measure

**Body:** The questions cover approved alternates, forecast sharing, lifecycle monitoring, buffer policy, control of non-franchised purchases, BOM data accuracy, concentration of spend, speed of impact analysis, supplier terms and cross-functional meetings. Together they describe whether your team can see a shortage early, understand its impact, and have something ready to do about it.

#### Reading the result

**Body:** A low score does not mean your buyers are poor. It usually shows missing structure: no approved alternate list, no shared forecast, and BOM data nobody scrubbed. A mid score means individuals compensate for weak systems. A high score means the practices are repeatable. Use the recommendations as a short list of changes and assign owners and dates rather than trying everything at once.

#### Common mistakes

**Body:** Teams often buy extra stock everywhere in response to a shortage, which ties up cash and still misses the part that mattered. Better to rank parts by lead time, single-source status and revenue exposure, and then act on the top group. Another mistake is relying on brokers without testing and traceability, which trades a shortage problem for a counterfeit one.

**Cta:** If you want shortage impact, where-used and lifecycle alerts available from one question inside your ERP, we can build a private read-only agent for your data.

**Faq:**

#### Is this assessment specific to one ERP?

**Answer:** No. It covers sourcing practices that apply whether you run SAP, Infor, Epicor, NetSuite, Dynamics or another system. The ERP matters for how quickly you can answer the where-used question.

#### How many parts should I consider when answering?

**Answer:** Focus on parts that are long lead time, single source or high value. These drive most shortage risk, and averages over the full BOM can hide the problem.

#### Does a high score guarantee no shortages?

**Answer:** No. Global allocation events can affect even well run teams. A high score means you are likely to see problems earlier and have options ready.

#### How often should I repeat it?

**Answer:** Quarterly is practical for most teams, and after any major supply event or change in product mix. Compare scores over time to see whether actions are working.