# Epicor UD Table Design Worksheet

> Source: https://netray.co/tools/epicor-ud-table-design-worksheet
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

An editable worksheet for planning user defined tables and fields before you build them in Epicor, with a column count and key check.

## Category

epicor

## Erp

Epicor Kinetic

## Audience

- Epicor developer
- Epicor consultant
- Business analyst

## Tool

**Kind:** worksheet

**Mode:** editable

**Columns:**

#### UD table

**Key:** table

**Type:** select

**Options:**

- UD01
- UD02
- UD03
- UD04
- UD05
- UD100
- UD101
- Other

#### Column label

**Key:** column

**Type:** text

#### Data type

**Key:** dtype

**Type:** select

**Options:**

- Character
- Integer
- Decimal
- Date
- Logical

#### Role

**Key:** role

**Type:** select

**Options:**

- Key
- Data
- Lookup
- Flag

#### Length or size

**Key:** len

**Type:** number

#### Required (1 or 0)

**Key:** required

**Type:** number

#### Business purpose

**Key:** purpose

**Type:** text

**Rows:**

**Table:** UD01

**Column:** Key1 CustomerNum

**Dtype:** Integer

**Role:** Key

**Len:** 0

**Required:** 1

**Purpose:** Customer the rule applies to

**Table:** UD01

**Column:** Key2 RuleType

**Dtype:** Character

**Role:** Key

**Len:** 20

**Required:** 1

**Purpose:** Type of customer packing rule

**Table:** UD01

**Column:** Character01 PackNote

**Dtype:** Character

**Role:** Data

**Len:** 200

**Required:** 0

**Purpose:** Text printed on the packing slip

**Table:** UD01

**Column:** Number01 LabelCopies

**Dtype:** Integer

**Role:** Data

**Len:** 0

**Required:** 1

**Purpose:** Number of labels to print

**Table:** UD01

**Column:** CheckBox01 ActiveFlag

**Dtype:** Logical

**Role:** Flag

**Len:** 0

**Required:** 1

**Purpose:** Rule is active

**Table:** UD01

**Column:** Date01 EffectiveDate

**Dtype:** Date

**Role:** Data

**Len:** 0

**Required:** 0

**Purpose:** Date the rule starts

**Totals:**

#### Required columns

**Key:** required

**Agg:** sum

**Format:** integer

#### Total character length

**Key:** len

**Agg:** sum

**Format:** integer

**Summary:**

#### Columns planned

**Key:** col_count

**Expr:** count

**Format:** integer

**Primary:** true

#### Required share

**Key:** req_share

**Expr:** if(gt(count,0), (sum_required / count) * 100, 0)

**Format:** percent

**Notes:** UD tables in Epicor have standard columns like Key1 to Key5 and numbered Character, Number, Date and CheckBox fields, plus user defined labels. Names and counts vary by release and by table, so confirm what UD Table maintenance offers in your system before building. Plan keys first, since changing a key later is hard.

## Content

**Intro:** UD tables are the standard way to add custom data to Epicor without changing the base schema. Plan them on paper first, because keys and data types are hard to change once data is loaded.

**Sections:**

#### How to use the worksheet

**Body:** Add one row per column you intend to use. Pick the UD table, give the column a clear label and the business purpose, and mark whether it is a key, a data column, a lookup or a flag. Record the data type and size. The summary shows how many columns you plan and what share is required. Export to Excel and review it with the business owner before anyone touches the UD maintenance screen.

**Bullets:**

- Define keys before data columns
- Describe every column in business terms
- Mark required columns explicitly
- Review with the business owner

#### Designing keys

**Body:** A UD table identifies each record through its key columns, so the keys decide what makes a row unique. Choose keys that are stable and meaningful, such as customer number and rule type, rather than free text that users may mistype. Avoid using a description as a key. If a record might need two rows for the same customer and rule at different dates, include the date or a sequence in the key.

#### Data types and sizing

**Body:** Use the narrowest type that fits: logical for yes or no, integer for counts, decimal for amounts, date for dates and character for text. Keep character sizes realistic, since oversized fields invite free text that is hard to report on. Where users choose from a list, plan a lookup source or a validated value list so reports stay consistent.

#### When not to use a UD table

**Body:** If the data is a single extra attribute on a standard record, a UD field on that record may be simpler. If you need heavy reporting, many relationships or high volumes, a UD table can become awkward and a separate database or integration may be better. Also consider how UD data flows into BAQs, reports, REST and upgrades before you commit.

**Bullets:**

- One extra attribute usually fits a UD field
- High volume or many relations may need another store
- Plan how reports and REST will read it
- Document the table in your inventory

**Cta:** If you want to review your UD tables and customizations against live data without writing queries by hand, Netray can discuss a read-only assistant for your Epicor environment.

**Faq:**

#### What is a UD table in Epicor?

**Answer:** A user defined table is a standard Epicor table such as UD01 or UD100 that you can configure with your own key labels and data columns. It stores custom data that does not fit in the standard schema.

#### How many UD tables are available?

**Answer:** Epicor ships a set of numbered UD tables, and the exact list depends on your release. Check UD Table maintenance in your system. Some are reserved for standard use, so confirm availability before planning.

#### Can I change a UD table key later?

**Answer:** It is difficult once data exists, because existing rows, BAQs, reports and code depend on the key. Treat keys as final during design, and test the table with sample data before using it in production.

#### Should I use a UD table or a UD field?

**Answer:** Use a UD field when you only need extra attributes on an existing record such as a part or customer. Use a UD table when you need a separate set of records with their own keys, such as rules or lookups.

## Search terms

epicor ud table design, epicor user defined tables, epicor ud table worksheet, epicor ud fields planning, epicor ud column naming, epicor ud table template, epicor ud01 ud100 tables, epicor data model customization

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
