## Short answer

An editable fit gap table that classifies requirements, estimates effort and totals the customization burden for your ERP project.

## Category

erp-migration

## Audience

- ERP business analyst
- ERP project manager
- Functional consultant

## Tool

**Kind:** worksheet

**Mode:** editable

**Columns:**

#### Requirement

**Key:** req

**Type:** text

#### Process area

**Key:** area

**Type:** select

**Options:**

- Finance
- Procurement
- Inventory
- Production
- Sales
- Quality
- Maintenance
- Reporting

#### Fit

**Key:** fit

**Type:** select

**Options:**

- Standard
- Configuration
- Workaround
- Custom development
- Not supported

#### Priority

**Key:** priority

**Type:** select

**Options:**

- Must
- Should
- Could

#### Effort (days)

**Key:** days

**Type:** number

#### Day rate

**Key:** rate

**Type:** number

**Format:** currency

#### Estimated cost

**Key:** cost

**Type:** number

**Expr:** days * rate

**Format:** currency

#### Decision owner

**Key:** owner

**Type:** text

**Rows:**

**Req:** Lot and serial traceability through production

**Area:** Inventory

**Fit:** Standard

**Priority:** Must

**Days:** 0

**Rate:** 900

**Owner:** Quality manager

**Req:** Customer specific packing label format

**Area:** Sales

**Fit:** Configuration

**Priority:** Should

**Days:** 3

**Rate:** 900

**Owner:** Logistics lead

**Req:** Approval of purchase orders by project budget holder

**Area:** Procurement

**Fit:** Workaround

**Priority:** Must

**Days:** 2

**Rate:** 900

**Owner:** Procurement manager

**Req:** Landed cost variance report by receipt

**Area:** Reporting

**Fit:** Custom development

**Priority:** Should

**Days:** 6

**Rate:** 900

**Owner:** Finance manager

**Req:** Calibration due date block on gauge issue

**Area:** Quality

**Fit:** Custom development

**Priority:** Must

**Days:** 8

**Rate:** 900

**Owner:** Quality manager

**Totals:**

#### Total effort (days)

**Key:** days

**Agg:** sum

**Format:** number

#### Total estimated cost

**Key:** cost

**Agg:** sum

**Format:** currency

#### Requirements

**Key:** req

**Agg:** count

**Format:** integer

**Summary:**

#### Average effort per requirement (days)

**Key:** avg_days

**Expr:** sum_days / count

**Format:** decimal

**Currency:** $

**Notes:** Set effort to 0 for Standard fits. Review every Custom development row with the sponsor before design freeze.

## Content

**Intro:** A fit gap analysis compares what the business needs against what the ERP does out of the box. This worksheet gives each requirement a fit category, an effort estimate and a cost, and totals the customization burden.

**Sections:**

#### How to use the worksheet

**Body:** List requirements one per row, taken from workshops, not from a wish list. Classify each as Standard, Configuration, Workaround, Custom development or Not supported. Add a priority using MoSCoW style Must, Should and Could. Estimate effort in days for anything beyond Standard and enter your blended day rate. The cost column and totals update. Export to Excel for the design authority and re-sort by cost to see where to challenge the requirement.

**Bullets:**

- One requirement per row
- Agree fit categories first
- Challenge every custom row
- Name a decision owner

#### Fit categories explained

**Body:** Standard means the requirement works with delivered features. Configuration means parameters, workflows or user defined fields satisfy it without code. Workaround means a process change or manual step is accepted. Custom development means new code, extensions or reports are built. Not supported means the business must drop it or buy a third party add on. Count the Custom and Workaround share: a high share of custom rows is a warning that the product or the process design is a poor match.

**Bullets:**

- Standard: delivered
- Configuration: no code
- Workaround: process change
- Custom: new code
- Not supported: drop or buy

#### Reading the totals

**Body:** Total days and cost give you the customization budget to compare against your contingency. A useful rule of thumb many teams apply is to keep Custom development below a small minority of Must requirements, because every custom item adds testing, upgrade and support cost over the life of the system. Also compare the Must rows against the Should rows. If the cost is concentrated in Should and Could items, defer them to a later phase.

#### Common mistakes

**Body:** Teams record requirements as solutions, such as build a screen, instead of the underlying need. Others skip the effort for testing and training, understating cost. Another trap is classifying a requirement as Standard without a demonstration in the sandbox. Validate Standard claims with a scripted demo using your own data. Finally, a fit gap is not a one time exercise; update it when scope changes through change control.

**Cta:** If many gaps are reports and lookups, ask whether natural language access to ERP data could close them without custom code.

**Faq:**

#### What is a fit gap analysis?

**Answer:** A structured comparison of business requirements against ERP capabilities. Each requirement is classified as fit or gap, and gaps get a resolution such as configuration, workaround, custom development or dropping the requirement.

#### When do we do the fit gap analysis?

**Answer:** During selection to compare vendors, and again during the design phase against the chosen system with your own processes and data. The second pass drives the build scope.

#### How do we estimate custom effort?

**Answer:** Ask the build team for development, unit test, documentation and support estimates, then add functional design and user testing. A single developer number usually understates the real effort.

#### How many custom items is too many?

**Answer:** There is no universal number, but a growing custom list raises upgrade, support and test costs. Treat each custom item as a standing cost and ask whether a process change would do.