# ERP Production Data Fix Request Template

> Source: https://netray.co/tools/erp-production-data-fix-request-template
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A change record for direct data corrections: what is wrong, the exact script, the backup, the rollback and who approved it.

## Category

erp-operations

## Audience

- ERP analyst
- Database administrator
- ERP administrator

## Tool

**Kind:** template

**Output:** document

**Fields:**

#### Ticket number

**Key:** ticket

**Type:** text

**Default:** CHG-20418

#### System and database

**Key:** system

**Type:** text

**Default:** SyteLine PROD, database Acme_App

#### Script author

**Key:** author

**Type:** text

**Default:** Daniel Okafor

#### Problem statement

**Key:** problem

**Type:** textarea

**Default:** 212 item-warehouse rows carry a negative on-hand quantity after a failed cycle count import. Planning shows false shortages.

#### Root cause

**Key:** root_cause

**Type:** textarea

**Default:** Import template wrote the count as a delta instead of an absolute quantity.

#### Expected rows affected

**Key:** rows

**Type:** number

**Default:** 212

#### Script summary

**Key:** script

**Type:** textarea

**Default:** UPDATE on the item-warehouse table inside a transaction, joined to a staging table of corrected quantities. Row count asserted before commit.

#### Backup method

**Key:** backup

**Type:** select

**Options:**

- Full database backup
- Table copy to backup schema
- Selected rows exported to CSV
- Snapshot

**Default:** Table copy to backup schema

#### Execution window

**Key:** window

**Type:** text

**Default:** 2026-10-24 19:00 to 19:30, no users on inventory transactions

#### Rollback plan

**Key:** rollback

**Type:** textarea

**Default:** Restore the affected columns from the backup table using the primary key. Rollback script tested in TEST on 2026-10-22.

**Blocks:**

#### Production Data Fix Request

**Body:** Ticket: {{ticket}}
System: {{system}}
Script author: {{author}}

#### Problem and root cause

**Body:** Problem:
{{problem}}

Root cause:
{{root_cause}}

#### Change details

**Body:** Expected rows affected: {{rows}}
Script summary: {{script}}
Execution window: {{window}}

#### Safety net

**Body:** Backup method: {{backup}}

Rollback plan:
{{rollback}}

#### Pre and post checks

**Table:**

**Columns:**

- Step
- Expected
- Actual
- Initials

**Rows:**

**0:** Run SELECT with same WHERE clause

**1:** {{rows}} rows

**0:** Script tested in non-production copy

**1:** Pass

**0:** Backup verified readable

**1:** Pass

**0:** Rows affected after UPDATE

**1:** {{rows}}

**0:** Business check on ERP screen

**1:** Values correct

**0:** Dependent jobs and integrations checked

**1:** No errors

#### Approvals

**Signatures:**

- Script author
- Peer reviewer
- Data owner
- DBA
- Change manager

**Notes:** Direct database edits can bypass ERP business logic, audit trails and validations. Prefer an ERP supported import, API or utility where one exists, and check your vendor support terms. This is a starting template, not legal or vendor advice.

## Content

**Intro:** Sometimes the only way to repair bad ERP data is a SQL update. When that happens, you need a record that shows what was wrong, what was run, how it can be undone and who agreed. This template is that record.

**Sections:**

#### How to use the template

**Body:** Complete the form before the script is run, not after. Write the problem and root cause plainly, state the row count you expect, and describe the backup and rollback in enough detail that a colleague could execute them at 2am. Export it as PDF and attach it to the change ticket. Fill in the actual column of the checks table during execution.

#### The control that matters most: expected row count

**Body:** The single best protection against a bad UPDATE is a SELECT that uses the identical WHERE clause and returns a known count. Run it first, compare to the expected rows, then run the UPDATE inside a transaction and assert that the affected rows equal the same number before committing. A script that touches 21,200 rows instead of 212 is caught in seconds.

**Bullets:**

- Wrap the change in an explicit transaction
- Never run a script without a WHERE clause review by a second person
- Keep the backup table until the next period close
- Record the actual rows affected on the form

#### ERP specific cautions

**Body:** ERP tables often have companion tables, audit columns, row version stamps and cached summaries. Updating one table directly can leave inventory balances, costing layers or workflow state inconsistent. Check whether your ERP offers a supported utility for the correction, and test the effect on screens and reports in a copy of production first.

#### Common mistakes

**Body:** The usual failures are no backup, a rollback plan that was never tested, scripts run by the author without review, and fixes applied during peak transaction hours. Another is fixing the symptom repeatedly without closing the import or interface that created the bad data in the first place.

**Cta:** If the same data defects keep returning, we can review the source of the bad data and, where it makes sense, help you build a read-only monitor that flags them before planning sees them.

**Faq:**

#### Is it ever acceptable to update ERP tables directly?

**Answer:** Sometimes, when no supported utility exists and the vendor allows it. It should be rare, reviewed, backed up and recorded. Always check the vendor support policy, since direct edits can affect supportability.

#### How long should I keep the backup?

**Answer:** At least until the next period close and any audit cycle that touches the affected data. Many teams keep it for 30 to 90 days. Follow your own retention policy.

#### Do I need a peer reviewer for a small fix?

**Answer:** Yes. A second pair of eyes on the WHERE clause is the cheapest control available. Even a ten row fix can become a ten thousand row mistake with one missing condition.

#### What if the rollback fails?

**Answer:** That is why the rollback is tested in a non-production copy and the backup is verified readable before the change. If both fail you fall back to a full database restore, so know that recovery time in advance.