# Engineer-to-Order Engineering Hours Estimator

> Source: https://netray.co/tools/eto-engineering-hours-complexity-estimator-calculator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Estimate engineering hours, cost and elapsed weeks for an ETO job from drawing count, complexity, design reuse, analysis, revision allowance and project coordination load.

## Category

engineering-plm

## Industry

Engineer-to-Order Machinery

## Audience

- Estimator
- Engineering manager
- Project manager

## Tool

**Kind:** calculator

**Currency:** $

**Inputs:**

#### Total drawings and models in scope

**Key:** drawings

**Type:** number

**Default:** 140

**Min:** 1

**Step:** 5

**Unit:** drawings

**Help:** Count detail drawings, assemblies, layouts, schematics and P&IDs the job needs, whether new or reused.

#### Share of drawings reused or lightly modified

**Key:** reuse

**Type:** slider

**Default:** 35

**Min:** 0

**Max:** 95

**Step:** 5

**Unit:** %

**Help:** Drawings pulled from an earlier job with only dimensional or note changes.

#### Effort to adapt a reused drawing

**Key:** reuse_effort

**Type:** select

**Default:** 0.25

**Options:**

##### 15% of a new drawing

**Value:** 0.15

##### 25% of a new drawing

**Value:** 0.25

##### 40% of a new drawing

**Value:** 0.4

#### Base hours per new drawing

**Key:** hrs_per_dwg

**Type:** number

**Default:** 9

**Min:** 1

**Step:** 0.5

**Unit:** hrs

**Help:** Use your own history. Many shops see roughly 4 to 20 hours for a mix of detail and assembly drawings.

#### Complexity factor

**Key:** complexity

**Type:** select

**Default:** 1.3

**Options:**

##### Simple, proven design (0.8)

**Value:** 0.8

##### Typical custom (1.0)

**Value:** 1

##### Complex, new mechanisms (1.3)

**Value:** 1.3

##### First of a kind, R&D content (1.7)

**Value:** 1.7

#### Analysis and design review load

**Key:** analysis

**Type:** number

**Default:** 18

**Min:** 0

**Step:** 1

**Unit:** % of drafting

**Help:** FEA, controls design, calcs, safety review, customer design reviews.

#### Revision and customer comment allowance

**Key:** revisions

**Type:** number

**Default:** 15

**Min:** 0

**Step:** 1

**Unit:** %

#### Project engineering and coordination load

**Key:** pm

**Type:** number

**Default:** 10

**Min:** 0

**Step:** 1

**Unit:** %

#### Blended engineering rate

**Key:** rate

**Type:** number

**Default:** 118

**Min:** 0

**Step:** 1

**Unit:** $/hr

**Help:** Fully burdened cost rate, not the sell rate.

#### Engineers assigned

**Key:** team

**Type:** number

**Default:** 4

**Min:** 1

**Step:** 1

**Unit:** people

#### Productive utilization per engineer

**Key:** util

**Type:** number

**Default:** 80

**Min:** 10

**Max:** 100

**Step:** 5

**Unit:** %

**Outputs:**

#### Equivalent new drawings

**Key:** eq_dwg

**Expr:** drawings * ((1 - reuse / 100) + (reuse / 100) * reuse_effort)

**Format:** decimal

**Description:** Reused drawings are weighted by the adaptation effort.

#### Drafting and design hours

**Key:** base_hrs

**Expr:** eq_dwg * hrs_per_dwg * complexity

**Format:** hours

#### Analysis and review hours

**Key:** analysis_hrs

**Expr:** base_hrs * analysis / 100

**Format:** hours

#### Revision allowance hours

**Key:** rev_hrs

**Expr:** (base_hrs + analysis_hrs) * revisions / 100

**Format:** hours

#### Project engineering hours

**Key:** pm_hrs

**Expr:** (base_hrs + analysis_hrs + rev_hrs) * pm / 100

**Format:** hours

#### Total engineering hours

**Key:** total_hrs

**Expr:** base_hrs + analysis_hrs + rev_hrs + pm_hrs

**Format:** hours

**Primary:** true

#### Engineering cost

**Key:** cost

**Expr:** total_hrs * rate

**Format:** currency

**Primary:** true

#### Elapsed weeks at this staffing

**Key:** weeks

**Expr:** total_hrs / (team * 40 * util / 100)

**Format:** weeks

**Description:** Assumes a 40 hour week. Dependencies between tasks can stretch this.

**Chart:**

#### Total engineering hours vs share of drawings reused

**Type:** line

**X:** reuse

**From:** 0

**To:** 95

**Steps:** 20

**Series:**

- total_hrs

**Disclaimer:** Estimating model for budgeting. Calibrate base hours per drawing and the complexity factor against your own closed jobs before using the output in a quote.

## Content

**Intro:** Engineering is usually the least understood line in an engineer-to-order quote, yet it often carries the most schedule and margin risk. This estimator turns a drawing count into hours, cost and elapsed weeks using the same layered logic most ETO estimators keep in a spreadsheet.

**Sections:**

#### How to use the estimator

**Body:** Start with the number of drawings and models the job will need, including schematics, layouts and P&IDs, then enter the share you expect to reuse from a prior job. Set the base hours per new drawing from your own history and choose a complexity factor. Add loads for analysis and design review, revisions and project engineering. Enter a burdened rate and the number of engineers to see cost and elapsed weeks. Move the reuse slider to see how much a genuine standard design library is worth on this job.

**Bullets:**

- Count drawings from a preliminary layout or the nearest similar job
- Use burdened cost rates for cost, sell rates only when pricing
- Record the result next to the actual hours when the job closes

#### The method behind the numbers

**Body:** The model is a parametric estimate: a unit of work (equivalent new drawings) multiplied by a historical productivity (hours per drawing) and a complexity factor, then loaded for non-drafting work. Reused drawings are weighted by the effort to adapt them, which is why 100 percent reuse never gives zero hours. Each load is applied to the running subtotal, so revisions are charged on drafting plus analysis, and project engineering is charged on everything before it. Elapsed time is hours divided by team size times 40 hours times utilization, a simple capacity model.

#### Reading the result and the chart

**Body:** The primary outputs are total hours and cost. Compare the hours to your last two or three similar jobs: if the estimate sits far outside their actuals, check the drawing count first, then the complexity factor. The chart shows how total hours fall as reuse rises. A shop with a controlled library of standard assemblies will see a steep slope, while a shop that only claims reuse informally will find the real adaptation effort is higher than 15 percent. Use the elapsed weeks output to sanity check the delivery promise.

#### Common mistakes

**Body:** The most frequent error is estimating only drafting and forgetting that analysis, customer review cycles and project coordination are real hours. The second is using the standard rate from the quoting system instead of a burdened cost rate. Others include assuming every engineer is productive 100 percent of the time, ignoring that a first-of-a-kind machine does not follow historical hours per drawing, and never feeding actual hours back so the base value improves.

**Bullets:**

- Do not count reuse unless the source files are findable and current
- Add hours for vendor drawing review and approval cycles
- Re-baseline the base hours per drawing each year

**Cta:** Netray can read closed-job hours from your ERP or PLM and calibrate hours per drawing by product family, so the estimate improves with each job. Ask for a review of your estimating data.

**Faq:**

#### What is a reasonable number of hours per drawing?

**Answer:** It varies widely by product. A simple detail drawing can take 2 to 4 hours while a complex weldment or assembly may take 15 to 30. Use your own closed-job data, divide actual engineering hours by final drawing count per product family, and start from that rather than a published number.

#### Should I include electrical and software engineering?

**Answer:** Yes, if the same team estimates them. Either count schematics, panel layouts and software modules as drawings with their own hours per unit, or run the calculator once per discipline with a different rate and complexity factor, then add the results.

#### How is design reuse handled?

**Answer:** Reused drawings are weighted by the effort needed to adapt them. At 25 percent, four reused drawings count as one new drawing. This keeps the estimate honest because reuse still needs checking, dimension changes and re-release.

#### Does this replace a bottom-up estimate?

**Answer:** No. Parametric estimates are quick and useful for early quotes. For a firm fixed-price bid, build a bottom-up task list and use this as a cross-check. A large gap between the two is a signal to review assumptions.

## Search terms

engineering hours estimator, eto engineering hours calculator, estimate engineering hours per drawing, engineer to order estimating, design hours estimate custom machine, engineering labor estimate template, drawing based engineering estimate, design reuse engineering hours

---