# EU Declaration of Conformity (CE) Template

> Source: https://netray.co/tools/eu-ce-declaration-of-conformity-template
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A single page EU declaration of conformity layout with manufacturer, product identification, directives, harmonised standards and signature.

## Category

compliance-legal

## Region

European Union

## Audience

- Product compliance engineer
- Quality manager
- Engineering manager

## Tool

**Kind:** template

**Output:** document

**Fields:**

#### Manufacturer name

**Key:** manufacturer

**Type:** text

**Default:** Alpine Automation GmbH

#### Manufacturer address

**Key:** address

**Type:** textarea

**Default:** Industriestrasse 22, 6020 Innsbruck, Austria

#### Product name and type

**Key:** product

**Type:** text

**Default:** Servo drive controller, type SDC-400

#### Model, batch or serial identification

**Key:** model

**Type:** text

**Default:** SDC-400-A, serial numbers from 100001

#### Union harmonisation legislation

**Key:** legislation

**Type:** textarea

**Default:** Machinery Regulation, Low Voltage Directive 2014/35/EU, EMC Directive 2014/30/EU, RoHS Directive 2011/65/EU

#### Harmonised standards and specifications applied

**Key:** standards

**Type:** textarea

**Default:** EN 61800-5-1, EN 61800-3, EN IEC 63000. Use the edition and year currently in force.

#### Notified body (if applicable)

**Key:** notified

**Type:** text

**Default:** Not applicable

#### Additional information

**Key:** extra

**Type:** textarea

**Default:** Technical file held at the manufacturer address. Authorised person for technical documentation: Head of Compliance.

#### Place of issue

**Key:** place

**Type:** text

**Default:** Innsbruck

#### Date of issue

**Key:** date

**Type:** date

**Default:** 2026-10-20

#### Signatory name and function

**Key:** signatory

**Type:** text

**Default:** Managing Director

**Blocks:**

#### EU Declaration of Conformity

**Body:** 1. Product: {{product}}
2. Identification: {{model}}
3. Manufacturer: {{manufacturer}}, {{address}}

#### Responsibility

**Body:** This declaration of conformity is issued under the sole responsibility of the manufacturer.

#### Object and legislation

**Body:** The object of the declaration described above is in conformity with the relevant Union harmonisation legislation:
{{legislation}}

#### References to standards

**Body:** References to the relevant harmonised standards used or to the specifications in relation to which conformity is declared:
{{standards}}

#### Notified body and additional information

**Body:** Notified body: {{notified}}

{{extra}}

#### Signed for and on behalf of

**Body:** Place and date of issue: {{place}}, {{date}}
Name and function: {{signatory}}

**Signatures:**

- Signature

**Notes:** A layout starting point, not legal advice. Required content differs by directive or regulation, and the standards list must reflect the editions you actually applied. Keep the declaration with the technical file and make it available in the languages required by the member states where the product is sold.

## Content

**Intro:** Every CE marked product placed on the EU market needs a declaration of conformity, and market surveillance authorities ask for it first. This template follows the structure used across the harmonisation directives so you can complete one quickly and adapt it.

**Sections:**

#### How to use the template

**Body:** Enter manufacturer data, the product identification and the list of directives or regulations that apply. Then list the harmonised standards you actually used, and any notified body involved. Export to PDF for signature or to Word for further editing. A single declaration may cover several directives if one product falls under them, for example low voltage, EMC and RoHS together.

#### Structure and content

**Body:** The model declaration in the EU decision on a common framework for product marketing sets out the standard fields. Specific directives add details. Check the text of each directive that applies to your product.

**Bullets:**

- Product identification that allows traceability, such as model, batch or serial number
- Name and address of the manufacturer, or authorised representative if applicable
- Statement that it is issued under the manufacturer's sole responsibility
- List of legislation and references to harmonised standards, with editions
- Notified body details where one was involved, and signature with place and date

#### Common mistakes

**Body:** Frequent errors include citing repealed directives, listing standards the product was never tested against, leaving out RoHS or the radio equipment rules where relevant, and signing without a complete technical file behind it. Another is not versioning the declaration when a standard is revised or the design changes. Link the declaration number to the item revision in your PLM or ERP so the right version is retrievable by serial number.

**Cta:** If your item and revision data lives in an ERP or PLM, we can help link declarations to serial numbers. This template needs no contact to use.

**Faq:**

#### Who signs the declaration of conformity?

**Answer:** A person authorised by the manufacturer, or by the authorised representative, signs on their behalf. The name and function should be stated so the authority knows who took responsibility.

#### Can one declaration cover several directives?

**Answer:** Yes. Where a product falls under more than one directive, one declaration can cover all of them, as long as it identifies each and the relevant standards clearly.

#### Does the declaration need to be translated?

**Answer:** It must be translated into the language or languages required by the member state where the product is placed on the market or made available. Check national requirements.

#### How long must I keep it?

**Answer:** Typically ten years after the product is placed on the market, unless the specific legislation says otherwise. Keep it together with the technical documentation.

## Search terms

EU declaration of conformity template, CE declaration of conformity word, DoC template machinery directive, declaration of conformity example, CE marking declaration format, EU DoC low voltage EMC RoHS, declaration of conformity manufacturer template

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
