# ERP Interface Inventory and Register Worksheet

> Source: https://netray.co/tools/eu-erp-interface-register-worksheet
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Inventory every system that talks to your ERP with protocol, frequency, volume, owner and criticality, before a migration or upgrade.

## Category

erp-operations

## Region

Europe

## Industry

Discrete Manufacturing

## Audience

- IT integration lead
- ERP architect
- ERP project manager

## Tool

**Kind:** worksheet

**Mode:** editable

**Columns:**

#### Interface ID

**Key:** id

**Type:** text

#### Interface name

**Key:** name

**Type:** text

#### Source system

**Key:** source

**Type:** text

#### Target system

**Key:** target

**Type:** text

#### Protocol

**Key:** protocol

**Type:** select

**Options:**

- REST API
- SOAP
- File (CSV/XML)
- EDI
- Database link
- Message queue
- Manual upload

#### Direction

**Key:** direction

**Type:** select

**Options:**

- Inbound
- Outbound
- Both

#### Runs per day

**Key:** freq

**Type:** number

#### Messages per run

**Key:** msgs

**Type:** number

#### Messages per day

**Key:** daily

**Type:** number

**Expr:** freq * msgs

**Format:** integer

#### Business critical

**Key:** critical

**Type:** select

**Options:**

- Yes
- No

#### Owner

**Key:** owner

**Type:** text

#### Plan

**Key:** plan

**Type:** select

**Options:**

- Keep
- Rebuild
- Replace by standard
- Retire

**Rows:**

#### Customer EDI orders

**Id:** INT-001

**Source:** Customer portal

**Target:** ERP

**Protocol:** EDI

**Direction:** Inbound

**Freq:** 24

**Msgs:** 15

**Critical:** Yes

**Owner:** Sales admin

**Plan:** Rebuild

#### Bank payment files

**Id:** INT-002

**Source:** ERP

**Target:** Bank

**Protocol:** File (CSV/XML)

**Direction:** Outbound

**Freq:** 2

**Msgs:** 1

**Critical:** Yes

**Owner:** Finance

**Plan:** Rebuild

#### MES production confirmations

**Id:** INT-003

**Source:** MES

**Target:** ERP

**Protocol:** REST API

**Direction:** Inbound

**Freq:** 96

**Msgs:** 40

**Critical:** Yes

**Owner:** Production IT

**Plan:** Rebuild

#### Carrier label and tracking

**Id:** INT-004

**Source:** ERP

**Target:** Carrier service

**Protocol:** REST API

**Direction:** Both

**Freq:** 48

**Msgs:** 10

**Critical:** No

**Owner:** Logistics

**Plan:** Replace by standard

#### CAD to BOM upload

**Id:** INT-005

**Source:** PLM

**Target:** ERP

**Protocol:** File (CSV/XML)

**Direction:** Inbound

**Freq:** 4

**Msgs:** 5

**Critical:** No

**Owner:** Engineering

**Plan:** Keep

**Totals:**

#### Total messages per day

**Key:** daily

**Agg:** sum

**Format:** integer

#### Number of interfaces

**Key:** id

**Agg:** count

**Format:** integer

#### Average runs per day

**Key:** freq

**Agg:** avg

**Format:** decimal

**Summary:**

#### Average messages per interface per day

**Key:** avg_msgs

**Expr:** if(gt(count,0), sum_daily / count, 0)

**Format:** integer

**Notes:** Cover every system: shop floor machines, scanners, labelling, bank, tax authority portals, EDI providers, BI tools, spreadsheets with macros and manual file drops.

## Content

**Intro:** Interfaces are where ERP projects lose weeks. They are often undocumented, owned by someone who left, and discovered during testing. An interface register lists every connection so the team can decide what to keep, rebuild, replace by standard functionality or retire.

**Sections:**

#### How to use the register

**Body:** Give each interface an ID, name the source and target and record the protocol and direction. Estimate runs per day and messages per run to get daily volume, which tells you whether a simple file drop is enough or an API with retry handling is needed. Mark business-critical interfaces and name an owner. Finally, record the plan for the new ERP and update it as design decisions are made.

**Bullets:**

- Interview each department, do not rely only on IT records
- Include spreadsheets that are loaded or exported by hand
- Record the owner on the business side as well
- Revisit after each design workshop

#### Where to find interfaces

**Body:** Check scheduled jobs and batch scripts on the ERP server, database links, middleware or integration platform logs, EDI provider portals, bank connection settings, file shares with regular drops, and the licence list of third-party tools. In European plants, also look for tax and customs connections, such as e-invoicing networks, Intrastat reporting and SEPA bank formats.

#### Using the volume numbers

**Body:** Daily message volume guides technical choices. A few hundred messages a day can go through scheduled files, while thousands of small confirmations from the shop floor suit an API or queue with monitoring. Peaks matter more than averages, so note month-end or shift-change spikes in the comments.

#### Common mistakes

**Body:** The most common failure is an incomplete inventory that misses the small, forgotten integrations, such as a label printer fed by a script. Another is listing interfaces without a business owner, which makes testing and sign-off slow. Finally, avoid copying all interfaces one-for-one; many exist only to work around old system limits.

**Cta:** If you want help reading old integration scripts and documenting what they do, AI tools running on your own servers can summarise them for you. We can show how. Optional.

**Faq:**

#### How many interfaces does a typical plant have?

**Answer:** A mid-size manufacturer often has between 15 and 60 interfaces once banks, EDI, carriers, MES, PLM, BI and tax connections are included. Counts higher than expected are normal when the inventory is done properly.

#### What do Keep, Rebuild, Replace and Retire mean?

**Answer:** Keep means it works unchanged. Rebuild means the function is needed but must be re-implemented for the new ERP. Replace by standard means the new system or a vendor connector covers it. Retire means the need has gone.

#### Should manual file uploads be listed?

**Answer:** Yes. Manual uploads are interfaces that depend on a person and a spreadsheet. They are fragile and often high risk at cutover because the knowledge sits with one user. Record them and decide whether to automate.

#### How do I treat interfaces to government systems?

**Answer:** List them as critical, with the owner in finance or compliance, and note the legal deadline and format version. Formats and portals change, so confirm requirements with your tax adviser or the vendor's current documentation.

## Search terms

erp interface inventory template, interface register template, erp integration inventory excel, system interface list template, erp interface list, integration landscape worksheet

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
