# FAA 8130-3 Tag Field Guide: What Each Field Means and What to Check

> Source: https://netray.co/tools/faa-8130-3-tag-field-guide
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A searchable reference of 8130-3 fields, what belongs in each, and the errors receiving inspectors most often find.

## Category

aerospace-defense

## Industry

Aerospace MRO

## Audience

- Receiving inspector
- Stores clerk
- MRO quality engineer
- Parts buyer

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Field

**Key:** field

**Type:** text

#### What belongs there

**Key:** content

**Type:** text

#### What a receiving inspector checks

**Key:** check

**Type:** text

#### Common error

**Key:** error

**Type:** text

#### Appears on

**Key:** form

**Type:** select

**Options:**

- Both
- FAA 8130-3 only
- EASA Form 1 only

**Rows:**

**Field:** Approving authority

**Content:** The civil aviation authority and country that approved the issuing organization

**Check:** Matches the authority the issuer actually works under

**Error:** Blank or an abbreviation nobody can identify

**Form:** Both

**Field:** Form title

**Content:** Authorized Release Certificate, with the form identifier

**Check:** Correct form for the situation, not a shop traveler

**Error:** Using a plain work order as a release

**Form:** Both

**Field:** Form tracking number

**Content:** A unique number assigned by the issuing organization

**Check:** Unique, legible, and not reused on another document

**Error:** Duplicate or handwritten over

**Form:** Both

**Field:** Organization name and address

**Content:** The company issuing the release, with its address

**Check:** Matches the approval number in the signature block

**Error:** Name does not match the approval holder

**Form:** Both

**Field:** Work order, contract or invoice number

**Content:** The reference that ties the tag to a job

**Check:** Can be matched to your purchase order or the repair order

**Error:** No reference, so the tag cannot be linked to the order

**Form:** Both

**Field:** Item

**Content:** Line item number when more than one part is listed

**Check:** Every part on the tag is numbered and accounted for

**Error:** Items missing or added by hand after signing

**Form:** Both

**Field:** Description

**Content:** Name of the part or assembly

**Check:** Consistent with the part number and with your order

**Error:** Description that conflicts with the part number

**Form:** Both

**Field:** Part number

**Content:** The part number of the item being released

**Check:** Exact match to the physical part and the purchase order, including dash numbers

**Error:** Dash number or revision letter mismatch

**Form:** Both

**Field:** Eligibility

**Content:** The aircraft, engine or product models the part is eligible for

**Check:** Covers the type and configuration you intend to fit it to

**Error:** Left blank, or a vague entry such as 'all'

**Form:** FAA 8130-3 only

**Field:** Quantity

**Content:** Number of items released

**Check:** Equals the quantity physically received

**Error:** Short shipment against a full-quantity tag

**Form:** Both

**Field:** Serial or batch number

**Content:** Serial number, batch or lot number, or 'N/A' where none exists

**Check:** Matches the data plate or label on the part

**Error:** Serial number transposed or missing

**Form:** Both

**Field:** Status or work

**Content:** Work performed, for example new, overhauled, repaired, inspected or modified

**Check:** Consistent with what you ordered and with the remarks

**Error:** 'Repaired' when overhaul was ordered

**Form:** Both

**Field:** Remarks

**Content:** Regulatory basis, repair or overhaul data used, airworthiness directive or bulletin compliance, life data and limitations

**Check:** Contains the data you need to carry the part into your records

**Error:** Empty remarks on a part that has a life limit

**Form:** Both

**Field:** Certification statement

**Content:** The block where the signer states the basis for release, which differs by form and release type

**Check:** The correct box is marked for the data basis used

**Error:** Wrong box or both boxes marked

**Form:** Both

**Field:** Authorized signature

**Content:** Signature of the person authorized by the issuing organization

**Check:** Present, original or accepted electronic signature

**Error:** Unsigned, or a stamp not allowed by the issuer's procedures

**Form:** Both

**Field:** Approval or authorization number

**Content:** The certificate or authorization number of the issuing organization or signer

**Check:** Present and consistent with the organization named

**Error:** Missing number or a number from another company

**Form:** Both

**Field:** Name of signer

**Content:** Printed name of the person signing

**Check:** Legible and matches the signature

**Error:** Illegible, so authority cannot be verified

**Form:** Both

**Field:** Date

**Content:** Date of signing

**Check:** Not later than receipt, not before the work was completed

**Error:** Date in the future or before the work order date

**Form:** Both

**Field:** Reverse side notes

**Content:** Standard notes about the use of the form

**Check:** Read once so the team knows the limits of the document

**Error:** Treating the tag as a release to service for the aircraft

**Form:** Both

**Field:** Copies and reissued tags

**Content:** Duplicate or replacement certificates

**Check:** Cross-referenced to the original tracking number

**Error:** Two tags in circulation for one part

**Form:** Both

**Field:** Electronic tags

**Content:** Electronically produced and signed certificates

**Check:** Accepted in your procedures and verifiable with the issuer

**Error:** Printing a PDF and altering it

**Form:** Both

**Field:** Tag does not equal release to service

**Content:** The tag certifies a part, not the installation

**Check:** The aircraft certificate of release comes from the installing organization

**Error:** Using the part tag as proof the aircraft is serviceable

**Form:** Both

**Notes:** Block numbers and wording differ between form revisions and between the FAA and EASA versions, so this guide uses field names. Always read the field against the current form and your authority's guidance. It is a training aid, not a regulation.

## Content

**Intro:** The FAA 8130-3 is the Authorized Release Certificate that travels with many aircraft parts and says who released them, in what condition and on what basis. This guide lists each field, what belongs in it and what a receiving inspector should check before the part goes into stock.

**Sections:**

#### How to use the field guide

**Body:** Search for a field name, or for a symptom such as serial number or remarks, and read the check column. The guide is arranged in the order you read the tag: authority and identification, then the part, then status and remarks, then the signature. Keep it open at the receiving bench or print it as a one-page aid. If you find an error, do not correct the tag yourself. Contact the issuing organization and ask for a corrected or reissued certificate, and keep the original with your discrepancy record.

#### What the tag is and is not

**Body:** An 8130-3 is a part-level document. It tells you who certified the part, what work was done and what data was used, and it lets the receiving shop treat the part as eligible for installation, subject to its own checks. It does not by itself release an aircraft to service, and it does not guarantee that the part is eligible for your aircraft configuration. The eligibility entry, the remarks and your own technical data decide that. EASA Form 1 plays a similar role under European rules, with a slightly different field layout, so if you handle both, compare them side by side.

**Bullets:**

- Check the part number against the tag character by character
- Check the serial or batch number against the plate
- Read the remarks for directive compliance and life data
- Confirm the signer and approval number match the organization

#### Worked example

**Body:** A hydraulic actuator arrives with a tag showing status overhauled, a serial number and remarks that cite the overhaul manual revision and list directive compliance. You match the part number and serial to the plate, confirm the quantity is one, confirm the signer's approval number belongs to the named shop, and note the remarks for your records. Everything agrees, so the receipt is accepted. If the remarks were empty on a part with a life limit, you would hold it and ask the shop for the missing data before stocking.

#### Common mistakes

**Body:** Inspectors often check the part number and stop there. Most real discrepancies are elsewhere: a serial number that differs from the plate by one digit, a quantity that does not match, a tag signed by an organization whose approval number is missing, or a status that does not match what was ordered. Another frequent mistake is accepting photocopies without a procedure for verifying them. A good rule is that every field on the tag should either be consistent with the order and the part or be explained in the remarks.

**Cta:** If your receiving team keys tag data into the ERP by hand, we can help validate it on entry against the order. Netray builds private tools around SAP, Infor and other ERPs for aerospace shops.

**Faq:**

#### Is an 8130-3 the same as an EASA Form 1?

**Answer:** They serve a similar purpose as authorized release certificates but are issued under different authorities and have different field layouts. Bilateral agreements allow acceptance in many cases, subject to conditions. Check your approval, the agreement terms and any customer requirements before treating one as the other.

#### Does the 8130-3 release the aircraft to service?

**Answer:** No. The tag covers the part or work it describes. The organization that installs the part and performs maintenance on the aircraft issues its own certificate of release to service, and it records the installed part numbers and serial numbers in the aircraft records.

#### What should I do if a tag is wrong?

**Answer:** Do not alter it. Quarantine the part, document the discrepancy, and ask the issuing organization for a corrected or reissued certificate. Keep the original and the correspondence with the receiving record. Treat a part without a corrected tag as unserviceable until your quality system accepts it.

#### Can an 8130-3 be electronic?

**Answer:** Yes, electronic certificates exist and are accepted when the issuer's procedures and the receiving organization's procedures both allow them, and when authenticity can be verified. Altering a printed copy is never acceptable. Confirm your own rules for storage, signatures and retrieval of electronic records.

## Search terms

faa 8130-3 tag, 8130-3 field guide, how to read an 8130-3, faa form 8130-3 explained, authorized release certificate, 8130-3 receiving inspection, 8130-3 vs easa form 1, airworthiness approval tag

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
