# Garment Tech Pack Specification Template

> Source: https://netray.co/tools/garment-tech-pack-specification-template
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A fill-in tech pack that gives the sewing floor and the buyer one agreed specification for a style, exportable to PDF or Word.

## Category

industry-templates

## Industry

Textile & Apparel

## Audience

- Plant manager
- Merchandiser
- Production planner
- Sourcing manager

## Tool

**Kind:** template

**Output:** document

**Fields:**

#### Factory or brand name

**Key:** company

**Type:** text

**Default:** Sunrise Apparel Pvt Ltd

#### Buyer

**Key:** buyer

**Type:** text

**Default:** Northline Outdoor

#### Style number

**Key:** style_no

**Type:** text

**Default:** NL-JKT-2217

#### Style name

**Key:** style_name

**Type:** text

**Default:** Men's quilted shell jacket

#### Season

**Key:** season

**Type:** text

**Default:** Autumn/Winter 2027

#### Revision

**Key:** revision

**Type:** text

**Default:** Rev 02

#### Date

**Key:** date

**Type:** date

**Default:** 2026-10-20

#### Main fabric

**Key:** main_fabric

**Type:** text

**Default:** 100% nylon taffeta, 68 GSM, DWR finish

#### Lining and fill

**Key:** lining

**Type:** text

**Default:** Polyester pongee lining, 80 g/m2 recycled polyester wadding

#### Construction notes

**Key:** construction

**Type:** textarea

**Default:** Lock stitch 12 SPI on seams, bar tack at pocket corners, taped seams at shoulder, bound hem. Quilting 100 mm channel pattern.

#### Labels and packing

**Key:** labels

**Type:** textarea

**Default:** Woven main label centre back neck, care label left side seam, size label with main label. Polybag per piece, 12 pieces per carton, solid size ratio.

**Blocks:**

#### Tech Pack

**Body:** Company: {{company}}
Buyer: {{buyer}}
Style: {{style_no}} - {{style_name}}
Season: {{season}}
Revision: {{revision}}
Date: {{date}}

#### Fabric and Fill

**Body:** Main fabric: {{main_fabric}}

Lining and fill: {{lining}}

#### Bill of Trims

**Table:**

**Columns:**

- Trim
- Description
- Supplier
- Qty per garment
- Placement

**Rows:**

**0:** Zipper

**3:** 1

**4:** Centre front

**0:** Snap buttons

**4:** Pocket flaps

**0:** Drawcord

**4:** Hem

**0:** Thread

**4:** All seams

**0:** Hangtag

**3:** 1

**4:** Left sleeve

#### Construction

**Body:** {{construction}}

#### Measurements Summary

**Table:**

**Columns:**

- Point of measure
- Spec (cm)
- Tolerance (+/-)
- Sample 1
- Sample 2

**Rows:**

**0:** Chest 2.5 cm below armhole

**2:** 1.0

**0:** Body length from HPS

**2:** 1.0

**0:** Sleeve length

**2:** 0.8

**0:** Shoulder width

**2:** 0.5

**0:** Hem opening

**2:** 1.0

#### Labels and Packing

**Body:** {{labels}}

#### Approvals

**Signatures:**

- Merchandiser
- Pattern maker
- Production manager
- Buyer representative

**Notes:** HPS means high point shoulder. Attach the sketch, colourways and artwork separately. Keep one revision number per change so that the floor never works from an old pack.

## Content

**Intro:** A tech pack is the single document that tells the cutting room, the sewing line and the packing area what a style must be. This template captures the style header, fabric, trims, construction, measurements and packing so that nothing lives only in an email thread.

**Sections:**

#### How to use the template

**Body:** Fill the header fields first: style number, revision and date. Then enter fabric, lining and construction in plain words that a line supervisor can follow. Complete the bill of trims and measurement tables in the exported document, print it, and sign it off. Issue it to the floor only after the buyer representative and your production manager have signed. When anything changes, raise the revision and withdraw the old copy from the line.

**Bullets:**

- Use one style number per tech pack
- Write fabric as composition, weight and finish
- State stitch density in stitches per inch
- Raise the revision on every change
- Keep signed copies with the sample approval

#### What belongs in a tech pack

**Body:** A working pack has five parts: the identity of the style, the materials, the construction, the size specification with tolerances, and the packing and labelling rules. Buyers differ in format, but missing any one of these is the usual cause of rejected first bulk lots. Measurements should be tied to named points of measure, with a tolerance in centimetres or inches stated for each, so that inline and final inspectors check the same thing.

**Bullets:**

- Style header and revision
- Fabric composition, GSM and finish
- Trim list with placement
- Construction and stitch details
- Point of measure table with tolerances
- Labels, folding and carton packing

#### Common mistakes and ERP notes

**Body:** The most frequent failures are a spec that differs from the purchase order, a trim quantity that is not on the bill of materials, and an old revision still on the line. If you run an ERP, the style number and revision should map to the item and BOM revision so that the tech pack and the production order agree. Check that colour and size variants exist as item variants before you release the order. Treat this form as the controlled source and update the BOM from it, not the other way around.

**Cta:** If your style data lives in a spreadsheet and an ERP at the same time, we can look at how to keep them in step. Ask us for an expert review.

**Faq:**

#### What is the difference between a tech pack and a spec sheet?

**Answer:** A spec sheet usually lists measurements and tolerances only. A tech pack is wider: it adds materials, trims, construction, labels and packing, and often sketches and artwork. Factories use the tech pack to cost and make a style, and the spec sheet is one page inside it.

#### Who owns the tech pack in a factory?

**Answer:** Usually the merchandiser or product development team controls it, with the pattern maker and the production manager contributing. The important point is that one named person controls revisions and distributes signed copies to the cutting room, the sewing lines and the quality team.

#### Can I attach images to the exported file?

**Answer:** The template exports text and tables. Insert your sketches, colourways and artwork into the exported Word file, or attach them as separate pages in the PDF set. Keep the same revision number on every attached page.

#### How many revisions are normal?

**Answer:** Two to four before bulk is common for a new style, because fit comments and fabric changes arrive after samples. The number matters less than discipline: each revision is dated, signed and replaces the earlier copy on the floor.

## Search terms

garment tech pack template, tech pack template free, apparel specification sheet, tech pack format excel, garment spec sheet template, style specification sheet, apparel production spec, tech pack pdf

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
