# Wood Species Table: Janka Hardness, Density and Typical Furniture Use

> Source: https://netray.co/tools/hardwood-softwood-janka-hardness-density-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Compare Janka hardness and approximate air-dry density for 22 common furniture woods and see what each is normally used for.

## Category

industry-templates

## Industry

Furniture and Woodworking

## Audience

- Plant manager
- Furniture designer
- Purchasing
- Production engineer

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Species

**Key:** species

**Type:** text

#### Type

**Key:** type

**Type:** text

#### Janka hardness (lbf)

**Key:** janka

**Type:** number

**Format:** integer

#### Approx. air-dry density (kg/m3)

**Key:** density

**Type:** number

**Format:** integer

#### Typical furniture use

**Key:** use

**Type:** text

**Rows:**

**Species:** Red oak

**Type:** Hardwood

**Janka:** 1290

**Density:** 705

**Use:** Chairs, cabinets, flooring

**Species:** White oak

**Type:** Hardwood

**Janka:** 1360

**Density:** 755

**Use:** Tables, outdoor and mission furniture

**Species:** Hard (sugar) maple

**Type:** Hardwood

**Janka:** 1450

**Density:** 705

**Use:** Butcher blocks, school and office furniture

**Species:** Soft maple

**Type:** Hardwood

**Janka:** 950

**Density:** 545

**Use:** Painted furniture, drawer parts

**Species:** Black walnut

**Type:** Hardwood

**Janka:** 1010

**Density:** 610

**Use:** Premium tables, case goods

**Species:** Black cherry

**Type:** Hardwood

**Janka:** 950

**Density:** 580

**Use:** Fine case goods, bedroom sets

**Species:** White ash

**Type:** Hardwood

**Janka:** 1320

**Density:** 675

**Use:** Chair frames, bent parts

**Species:** Shagbark hickory

**Type:** Hardwood

**Janka:** 1880

**Density:** 830

**Use:** Tool handles, rustic furniture

**Species:** Yellow birch

**Type:** Hardwood

**Janka:** 1260

**Density:** 690

**Use:** Drawer sides, plywood face veneer

**Species:** American beech

**Type:** Hardwood

**Janka:** 1300

**Density:** 720

**Use:** Bentwood chairs, workbenches

**Species:** Teak

**Type:** Hardwood

**Janka:** 1155

**Density:** 655

**Use:** Outdoor furniture, marine decking

**Species:** Genuine mahogany

**Type:** Hardwood

**Janka:** 800

**Density:** 545

**Use:** Fine furniture, veneers

**Species:** Sapele

**Type:** Hardwood

**Janka:** 1410

**Density:** 640

**Use:** Doors, cabinets, veneers

**Species:** Rubberwood

**Type:** Hardwood

**Janka:** 980

**Density:** 560

**Use:** Knock-down furniture, cribs

**Species:** Yellow poplar

**Type:** Hardwood

**Janka:** 540

**Density:** 455

**Use:** Painted frames, hidden parts

**Species:** Red alder

**Type:** Hardwood

**Janka:** 590

**Density:** 450

**Use:** Cabinet doors, stained furniture

**Species:** Basswood

**Type:** Hardwood

**Janka:** 410

**Density:** 415

**Use:** Carving, blinds, light parts

**Species:** Eastern white pine

**Type:** Softwood

**Janka:** 380

**Density:** 350

**Use:** Country furniture, moldings

**Species:** Ponderosa pine

**Type:** Softwood

**Janka:** 460

**Density:** 450

**Use:** Millwork, knotty pine furniture

**Species:** Douglas fir

**Type:** Softwood

**Janka:** 660

**Density:** 530

**Use:** Beams, rustic tables, framing

**Species:** Western red cedar

**Type:** Softwood

**Janka:** 350

**Density:** 370

**Use:** Outdoor furniture, chests

**Species:** Hickory and pecan (generic)

**Type:** Hardwood

**Janka:** 1820

**Density:** 750

**Use:** Heavy-duty seating, cabinets

**Notes:** Janka hardness is the force in pounds-force to embed an 11.3 mm steel ball to half its diameter, so a higher number is harder. Density varies with moisture, growth rate and region, so treat both columns as approximate and check the supplier grading data for purchasing.

## Content

**Intro:** Janka hardness and density are the two numbers furniture buyers and production engineers use to compare species before they commit to a design. This table gathers both for 22 common woods and adds typical furniture use.

**Sections:**

#### How to use the table

**Body:** Filter by type to separate hardwood from softwood, or type a use such as chair or outdoor to see candidates. Sort by Janka to rank species by dent resistance. A table top that will see daily use should sit in the upper half of the list, while hidden frame parts can use softer, cheaper wood. Density tells you shipping weight, how heavy the finished piece will feel, and how hard the wood will be on tooling.

**Bullets:**

- Higher Janka means more dent resistance and tougher machining
- Higher density means heavier freight and heavier finished goods
- Match species to the exposure of each part, not the whole product

#### Hardness, machining and finishing

**Body:** Harder species such as hard maple and hickory dull cutters faster, need sharper tooling and often need pre-drilling for screws. Open-grain species such as oak and ash need grain filler for a smooth lacquer finish, while closed-grain maple and cherry take finish evenly but can blotch under stain. Teak and some tropical woods contain oils that can interfere with glue and some finishes, so test adhesion before you commit a production run.

#### Common mistakes and ERP notes

**Body:** A frequent mistake is treating Janka as a measure of strength in bending. It measures surface hardness only. Another is using a single density for weight and freight calculations when moisture content changes it. In ERP, hold species, grade and moisture content as item attributes so raw lumber, kiln-dried stock and finished parts can be costed and traced separately.

**Bullets:**

- Janka is surface hardness, not bending strength
- Moisture changes weight, so record it with the lot
- Hold species and grade as structured attributes

**Cta:** If lumber species, grade and moisture are tracked in spreadsheets outside your ERP, we can show how to bring them into lot-controlled item data.

**Faq:**

#### What is the Janka hardness test?

**Answer:** The Janka test measures the force needed to press an 11.3 mm steel ball into wood to half its diameter. The result in pounds-force ranks species by resistance to denting and wear. It does not measure how strong the wood is in bending or compression.

#### Is oak harder than maple?

**Answer:** Hard maple at about 1450 lbf is harder than red oak at about 1290 lbf and white oak at about 1360 lbf. Soft maple, at roughly 950 lbf, is notably softer than all three, so species naming matters when you buy.

#### Which woods suit outdoor furniture?

**Answer:** Teak, white oak and western red cedar are common outdoor choices because of their natural decay resistance. Even so, finish, drainage design and end-grain sealing affect life more than species alone.

#### Why do density values differ between sources?

**Answer:** Density depends on moisture content, growth conditions, heartwood share and region. Published values are averages at a stated moisture level, so small differences between sources are normal. Use your supplier's graded values for contracts and freight.

## Search terms

janka hardness chart, wood density table, hardwood hardness comparison, oak vs maple hardness, wood species for furniture, janka scale woods, softwood vs hardwood table, lumber density kg m3

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
