# Heat Treat Furnace Batch Log Worksheet

> Source: https://netray.co/tools/heat-treat-furnace-batch-log-worksheet
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

An editable batch log for furnace loads: part, process, load weight, setpoint, soak time, quench medium, hardness and pass or hold status.

## Category

industry-templates

## Industry

Heat Treating

## Audience

- Heat treat supervisor
- Metallurgist
- Quality engineer

## Tool

**Kind:** worksheet

**Mode:** editable

**Columns:**

#### Batch ID

**Key:** batch

**Type:** text

#### Part number

**Key:** part

**Type:** text

#### Process

**Key:** process

**Type:** select

**Options:**

- Normalize
- Anneal
- Harden
- Temper
- Carburize
- Stress relieve
- Solution treat
- Age

#### Load weight

**Key:** load

**Type:** number

**Unit:** kg

#### Setpoint

**Key:** setpoint

**Type:** number

**Unit:** deg C

#### Soak time

**Key:** soak

**Type:** number

**Unit:** min

#### Soak hours

**Key:** soak_h

**Type:** number

**Expr:** soak / 60

**Format:** decimal

#### Quench

**Key:** quench

**Type:** select

**Options:**

- Oil
- Polymer
- Water
- Air
- Furnace cool
- Gas

#### HRC min

**Key:** hrc_min

**Type:** number

#### HRC actual

**Key:** hrc_act

**Type:** number

#### Margin to min

**Key:** margin

**Type:** number

**Expr:** hrc_act - hrc_min

**Format:** decimal

#### Status

**Key:** status

**Type:** select

**Options:**

- Pass
- Hold
- Retreat
- Reject

#### Date

**Key:** date

**Type:** date

**Rows:**

**Batch:** HT-1041

**Part:** SH-220 shaft

**Process:** Harden

**Load:** 420

**Setpoint:** 845

**Soak:** 60

**Quench:** Oil

**Hrc min:** 52

**Hrc act:** 54

**Status:** Pass

**Date:** 2026-10-12

**Batch:** HT-1042

**Part:** SH-220 shaft

**Process:** Temper

**Load:** 420

**Setpoint:** 400

**Soak:** 120

**Quench:** Air

**Hrc min:** 45

**Hrc act:** 47

**Status:** Pass

**Date:** 2026-10-12

**Batch:** HT-1043

**Part:** GR-85 gear

**Process:** Carburize

**Load:** 310

**Setpoint:** 925

**Soak:** 360

**Quench:** Oil

**Hrc min:** 58

**Hrc act:** 57

**Status:** Hold

**Date:** 2026-10-13

**Batch:** HT-1044

**Part:** BR-19 bracket

**Process:** Stress relieve

**Load:** 180

**Setpoint:** 600

**Soak:** 90

**Quench:** Furnace cool

**Hrc min:** 0

**Hrc act:** 0

**Status:** Pass

**Date:** 2026-10-14

**Totals:**

#### Total load

**Key:** load

**Agg:** sum

**Format:** number

#### Total soak hours

**Key:** soak_h

**Agg:** sum

**Format:** decimal

#### Batches logged

**Key:** batch

**Agg:** count

**Format:** integer

**Summary:**

#### Kilograms per soak hour

**Key:** kg_per_hour

**Expr:** sum_load / sum_soak_h

**Format:** number

**Notes:** Replace the example rows. Margin to min shows how close hardness runs to the lower limit; a persistently small margin is a drift signal. Set both hardness columns to 0 for processes with no hardness requirement.

## Content

**Intro:** Heat treat shops and in-house furnace departments often keep batch logs in Excel. This worksheet gives you a clean structure with soak hours and hardness margin calculated for you, ready to export.

**Sections:**

#### How to use this worksheet

**Body:** Delete the example rows and add one row per furnace load. Select the process and quench, enter load weight, setpoint, soak time and the hardness readings, and set the status. Soak hours and margin to minimum calculate on their own. Export to Excel to merge months of logs, or to PDF for a signed daily record.

#### What to log and why

**Body:** A batch log answers two questions: was the load treated to the specified cycle, and can every part be traced to it. The minimum is batch ID, part, process, load, setpoint, soak and result. Add furnace ID and chart reference in your own copy. Specifications such as AMS 2750 for pyrometry in aerospace set expectations for instrumentation and survey frequency, so keep the log consistent with your instrument records.

#### Reading margin and throughput

**Body:** Margin to min is actual hardness minus the lower limit. A string of loads with a margin of one or two points suggests austenitizing temperature, quench severity or tempering drift. Kilograms per soak hour is a rough utilization figure, useful to compare furnaces, but it ignores heat up and cool down time.

#### Common mistakes

**Body:** Do not log the setpoint when the controlled thermocouple shows something different. Record the load thermocouple reading where you have one. Do not close a batch as Pass before hardness is verified on enough pieces per your sampling plan, and do not mix different parts in a logged load without listing each part.

**Cta:** If you want furnace batches reconciled with work orders and lots in your ERP, Netray can help set that up privately on your servers.

**Faq:**

#### Can this replace my furnace chart recorder?

**Answer:** No. The log is a summary record. The chart or digital cycle record from the furnace remains the evidence of the actual temperature profile and should be kept and referenced by batch ID.

#### Does it support Rockwell C only?

**Answer:** The columns are labeled HRC but you can relabel them in your Excel copy for HRB, HV or HBW as long as the minimum and actual use the same scale.

#### How do I handle partial loads?

**Answer:** Enter one row per batch with the total load weight and list the part numbers in the part field, or split into one row per part with a shared batch ID if your customer requires it.

#### Why is soak time in minutes?

**Answer:** Most cycle sheets quote soak in minutes. The worksheet converts to hours so you can total furnace time and compare against capacity.

## Search terms

heat treat batch log, furnace load log excel, heat treatment record sheet, heat treat log template, furnace cycle log, quench and temper log, heat treat traceability log, heat treating production log

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
