# IBM Maximo Manage On-Prem Private AI Layer Blueprint Generator

> Source: https://netray.co/tools/ibm-maximo-manage-on-prem-private-ai-layer-blueprint-generator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Generate a shareable architecture plan for a private, on-prem AI assistant on IBM Maximo Manage On-Prem: components, security controls, 3-phase rollout and open questions for IT.

## Category

on-prem-ai

## Erp

IBM Maximo

## Industry

Maintenance and Reliability

## Audience

- IT architect
- CIO
- Quality manager
- Engineering manager

## Tool

**Kind:** template

**Output:** document

**Fields:**

#### Company name

**Key:** company

**Type:** text

**Default:** Acme Precision Ltd

#### System version

**Key:** version

**Type:** select

**Options:**

- Maximo 7.6.1.x
- Maximo Manage 8.x on-prem (MAS)
- Maximo Manage 9.x on-prem (MAS)
- Older than 7.6
- Not sure

**Default:** Maximo 7.6.1.x

#### Database engine or data store

**Key:** db

**Type:** select

**Options:**

- IBM Db2
- Oracle
- Microsoft SQL Server
- Not sure

**Default:** IBM Db2

#### Hosting

**Key:** hosting

**Type:** select

**Options:**

- On-prem server
- Private cloud
- Air-gapped

**Default:** On-prem server

#### Named users

**Key:** users

**Type:** number

**Default:** 250

#### Sites or plants

**Key:** sites

**Type:** number

**Default:** 3

#### Main use cases

**Key:** usecases

**Type:** textarea

**Default:** Backlog by craft; overdue PMs; repeat failures by asset; parts on hand for a work order; manual and job plan questions; draft work orders in a pre-approval status.

#### Data that must never leave the site

**Key:** never

**Type:** textarea

**Default:** Security-sensitive asset locations, export-controlled equipment manuals, contractor rate data.

#### GPU available

**Key:** gpu

**Type:** select

**Options:**

- None yet
- 1 data-center GPU (24 to 48 GB)
- 1 to 2 GPUs (80 GB class)
- 4 or more GPUs (80 GB class)

**Default:** None yet

#### Target go-live

**Key:** golive

**Type:** date

**Default:** 2027-03-31

**Blocks:**

#### Private AI Layer Architecture Plan: IBM Maximo Manage On-Prem

**Body:** Company: {{company}}
System: IBM Maximo Manage On-Prem ({{version}})
Data store: {{db}}
Hosting: {{hosting}}
Named users: {{users}} across {{sites}} site(s)
Target go-live: {{golive}}

#### 1. Context and goals

**Body:** {{company}} runs IBM Maximo Manage On-Prem ({{version}}) on {{db}} and wants an AI assistant that works on the existing system without moving data to a third-party cloud. Hosting model: {{hosting}}.

Main use cases:
{{usecases}}

#### 2. Components

**Table:**

**Columns:**

- Component
- Design
- Notes

**Rows:**

**0:** Data access path

**1:** Maximo REST (OSLC) on object structures such as MXWO and MXASSET called as the user; read-only replica for trend analytics; DOCLINKS for attachments

**2:** Database: {{db}}. Read-only credentials; named views or parameterized queries only.

**0:** Retrieval index

**1:** Local hybrid keyword and vector index over: OEM manuals, job plans, DOCLINKS attachments, failure analysis reports and long descriptions

**2:** Each chunk carries source, version and access tags. Refreshed by scheduled sync or change data capture.

**0:** Model serving

**1:** Open-weight model served with vLLM or Ollama on local GPUs

**2:** GPU available today: {{gpu}}. Size with the sizing calculator for {{users}} named users.

**0:** Tool server

**1:** MCP or function-calling server exposing approved read actions

**2:** No free SQL in phase 1. Every call is parameterized, timed and logged.

**0:** Identity and permissions

**1:** Maximo security groups, organization and site authorization and data restrictions applied by calling the API as the user

**2:** End-user identity propagated on every call; restricted-user tests run nightly.

**0:** Audit

**1:** Append-only log of question, tools called, query text, data sources and answer

**2:** Retention set by your records policy. Stored inside the same enclave.

#### 3. Security controls mapped to your inputs

**Table:**

**Columns:**

- Control
- Implementation
- Driven by

**Rows:**

**0:** Data residency

**1:** All components inside {{hosting}} environment; no outbound calls at query time

**2:** Hosting

**0:** Data that must not leave

**1:** Excluded from index and tools unless explicitly approved:
{{never}}

**2:** Data restrictions

**0:** Least privilege

**1:** Read-only service accounts; no edit, sign or approve rights

**2:** System roles

**0:** Network

**1:** AI hosts in a separate segment; firewall allows only replica or API, file share reads and audit store

**2:** {{sites}} site(s)

**0:** Regulatory posture

**1:** Safety-critical maintenance: assistant drafts and advises; approvals, closures and inventory changes stay with people.

**2:** Industry obligations

**0:** Supply chain

**1:** Model weights and containers moved in by controlled transfer; internal package mirror; telemetry off

**2:** Air-gap option

#### 4. Three-phase rollout

**Table:**

**Columns:**

- Phase
- Scope
- Exit criteria

**Rows:**

**0:** Phase 1: read-only

**1:** Questions on curated views and document search for a pilot group; evaluation set of 30 to 50 real questions

**2:** Accuracy target agreed and met; permission tests pass; audit log reviewed

**0:** Phase 2: drafts

**1:** Summaries and draft text for human review; no writes to the system

**2:** Users accept drafts at an agreed rate; no data leakage findings

**0:** Phase 3: approved actions

**1:** A few narrow actions through supported APIs, each with a named human approver

**2:** Approver sign-off recorded; rollback tested; go-live by {{golive}}

#### 5. Open questions for IT

**Body:** 1. Which interface does our license include for read and, later, write (API, web service, export)?
2. Can we get a read-only replica or reporting copy, and who owns it?
3. Where do documents and attachments live, and what are their access rules?
4. How are users authenticated (AD, SSO) and how do we map groups to filters?
5. Where will the GPU hosts sit, and what is the patch and model-update process?
6. Which records policy and validation requirements apply to the assistant's logs and outputs?

#### Approvals

**Signatures:**

- IT architect
- Information security
- Business owner
- Quality or compliance

**Notes:** This plan is a starting point for discussion with your IT and security teams. Interface availability, table names and licensing vary by version and edition, so confirm each with your vendor before committing.

## Content

**Intro:** This generator produces a structured architecture plan for adding a private AI assistant to IBM Maximo Manage On-Prem without moving data off your site. Fill in your version, database, hosting and use cases, and export a document you can circulate to IT and security.

**Sections:**

#### How to use the generator

**Body:** Enter your company, system version, database and hosting model, then describe the main use cases and the data that must never leave the site. Choose the GPU you have today, or None yet. The document updates as you type: components table, security controls, rollout phases and open questions. Export to PDF or Word and use it as the pre-read for an architecture review. Edit the use case and restricted-data fields carefully, because they drive the scope of the first phase and the exclusion list for the index.

**Bullets:**

- Be specific in the use cases: questions people actually ask
- List restricted data classes, not only systems
- Send the open questions to IT before the meeting
- Re-generate after each decision

#### The design logic behind the plan

**Body:** The plan follows a conservative pattern for on-prem systems: a read-only data path (Maximo REST (OSLC) on object structures such as MXWO and MXASSET called as the user), a separate retrieval index for documents, an open-weight model served locally, a tool server that exposes a short menu of approved actions, identity propagation, and an audit log. Write-back is deferred and always goes through supported interfaces with a named human approver. This keeps the vendor's own rules, signatures and audit trail intact.

#### Reading the output

**Body:** The components table tells IT what to build and what access to request. The security controls table maps your restricted data and hosting choice to concrete controls. The rollout table sets exit criteria for each phase so that go-live is a decision, not a drift. The open questions list is the real value: most delays on projects like this come from unanswered questions about interfaces, replicas and identity, not from the model.

#### Common mistakes

**Body:** Teams often start with the model choice and leave data access and permissions to the end. Others give the assistant a broad service account for the pilot and forget to narrow it. Another frequent mistake is treating the assistant as a decision-maker in regulated processes. Keep it advisory, keep it read-only first, and measure it against real questions.

**Bullets:**

- Skipping the evaluation set
- One shared admin account
- No restricted-user tests
- Indexing documents without versions

**Cta:** If you want a second pair of eyes on this plan, Netray can review it with your IT team and show how the private AI layer would work on your version of IBM Maximo Manage On-Prem.

**Faq:**

#### Is this plan specific to my exact version?

**Answer:** It is specific to the system and the choices you enter, but interface availability, table names and licensing vary by version and edition. Treat the data access row as a hypothesis to confirm with your vendor and DBA.

#### Does the plan assume cloud AI?

**Answer:** No. It assumes open-weight models served on your own GPUs, in an on-prem, private cloud or air-gapped environment. Cloud models could be added later for non-sensitive content, but the plan keeps sensitive data local.

#### Who should sign the plan?

**Answer:** At least the IT architect, information security, the business owner and quality or compliance. The signature block is included for that reason, and you can edit the roles after export.

#### What if I have no GPU yet?

**Answer:** Choose None yet and use the sizing calculator to estimate how many you need. Small pilots can start on one data-center GPU or even CPU for a small model, with slower responses.

## Search terms

ibm maximo manage on-prem ai architecture, ibm maximo manage on-prem private ai blueprint, on-prem ai architecture template, air-gapped ai architecture plan, ai assistant architecture document template, local llm architecture plan template, private ai rollout plan template

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
