# IC Package Type Reference (SOIC, QFN, BGA, TSSOP, QFP)

> Source: https://netray.co/tools/ic-package-type-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A searchable list of common semiconductor package types with full names, mounting method, lead style and typical lead pitch.

## Category

electronics

## Industry

Electronics Manufacturing

## Audience

- Electronics buyer
- Component engineer
- Process engineer

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Package

**Key:** pkg

**Type:** text

#### Full name

**Key:** name

**Type:** text

#### Mounting

**Key:** mount

**Type:** text

#### Lead or terminal style

**Key:** leads

**Type:** text

#### Common pitch

**Key:** pitch

**Type:** text

#### Process note

**Key:** note

**Type:** text

**Rows:**

#### Dual in-line package

**Pkg:** DIP

**Mount:** Through hole

**Leads:** Two rows of pins

**Pitch:** 2.54 mm

**Note:** Wave or hand solder; legacy and sockets

#### Small outline integrated circuit

**Pkg:** SOIC

**Mount:** Surface mount

**Leads:** Gull-wing, two sides

**Pitch:** 1.27 mm

**Note:** Easy to inspect and rework

#### Shrink small outline package

**Pkg:** SSOP

**Mount:** Surface mount

**Leads:** Gull-wing, two sides

**Pitch:** 0.65 mm

**Note:** Tighter pitch than SOIC; watch bridging

#### Thin shrink small outline package

**Pkg:** TSSOP

**Mount:** Surface mount

**Leads:** Gull-wing, two sides

**Pitch:** 0.65 mm (0.5 mm also common)

**Note:** Thinner body; common for logic and analog

#### Mini small outline package

**Pkg:** MSOP

**Mount:** Surface mount

**Leads:** Gull-wing, two sides

**Pitch:** 0.5 to 0.65 mm

**Note:** Also called VSSOP by some makers

#### Small outline transistor

**Pkg:** SOT-23

**Mount:** Surface mount

**Leads:** Three to six gull-wing leads

**Pitch:** 0.95 mm

**Note:** Transistors, diodes and small regulators

#### Small outline transistor 223

**Pkg:** SOT-223

**Mount:** Surface mount

**Leads:** Three leads and a tab

**Pitch:** 2.3 mm

**Note:** Tab spreads heat; used for linear regulators

#### Transistor outline 220

**Pkg:** TO-220

**Mount:** Through hole

**Leads:** Three leads and a metal tab

**Pitch:** 2.54 mm

**Note:** Heatsink mounting for power parts

#### Transistor outline 252

**Pkg:** TO-252 (DPAK)

**Mount:** Surface mount

**Leads:** Leads and a solderable tab

**Pitch:** 2.28 mm

**Note:** Power MOSFETs and regulators

#### Transistor outline 263

**Pkg:** TO-263 (D2PAK)

**Mount:** Surface mount

**Leads:** Leads and a solderable tab

**Pitch:** 2.54 mm

**Note:** Larger surface mount power package

#### Plastic leaded chip carrier

**Pkg:** PLCC

**Mount:** Surface mount or socket

**Leads:** J-lead, four sides

**Pitch:** 1.27 mm

**Note:** Legacy memory and logic

#### Quad flat package

**Pkg:** QFP

**Mount:** Surface mount

**Leads:** Gull-wing, four sides

**Pitch:** 0.4 to 1.0 mm

**Note:** Microcontrollers; coplanarity matters

#### Low-profile quad flat package

**Pkg:** LQFP

**Mount:** Surface mount

**Leads:** Gull-wing, four sides

**Pitch:** 0.4 to 0.8 mm

**Note:** 1.4 mm body is typical

#### Thin quad flat package

**Pkg:** TQFP

**Mount:** Surface mount

**Leads:** Gull-wing, four sides

**Pitch:** 0.4 to 0.8 mm

**Note:** 1.0 mm body is typical

#### Quad flat no-lead

**Pkg:** QFN

**Mount:** Surface mount

**Leads:** Pads on the underside edge

**Pitch:** 0.4 to 0.65 mm

**Note:** Exposed pad needs void control; no visible fillet

#### Dual flat no-lead

**Pkg:** DFN

**Mount:** Surface mount

**Leads:** Pads on two sides underneath

**Pitch:** 0.4 to 0.65 mm

**Note:** Small regulators and memory

#### Ball grid array

**Pkg:** BGA

**Mount:** Surface mount

**Leads:** Solder balls in a grid

**Pitch:** 0.5 to 1.27 mm

**Note:** Needs X-ray inspection; moisture sensitive

#### Land grid array

**Pkg:** LGA

**Mount:** Surface mount or socket

**Leads:** Flat pads in a grid

**Pitch:** 0.5 to 1.27 mm

**Note:** Paste printing accuracy is critical

#### Wafer-level chip-scale package

**Pkg:** WLCSP

**Mount:** Surface mount

**Leads:** Bumps on the die

**Pitch:** 0.35 to 0.5 mm

**Note:** Bare die edges; handle carefully

#### Chip-scale package

**Pkg:** CSP

**Mount:** Surface mount

**Leads:** Ball or land array

**Pitch:** 0.4 to 0.8 mm

**Note:** Package is close to die size

**Notes:** Pitches and body heights are typical ranges. Standards bodies such as JEDEC register outlines and manufacturers add their own variants, so always use the exact outline drawing from the datasheet when ordering or designing a land pattern.

## Content

**Intro:** Package names turn up on every BOM line and distributor listing, but they are easy to confuse: SOIC, SSOP and TSSOP differ by pitch and height, and QFN and QFP differ by whether leads are visible. This reference lists common package types with mounting, lead style and typical pitch.

**Sections:**

#### How to use the package reference

**Body:** Search for the acronym on your BOM and read across to what it means physically. Buyers use it to judge whether a proposed alternate fits the same footprint, and process engineers use it to anticipate inspection and rework needs. Pitch and lead style are the quickest way to tell whether two similarly named packages can share a land pattern.

**Bullets:**

- Search by acronym, full name or mounting type
- Compare pitch before assuming a drop-in replacement
- Export the table for supplier onboarding documents

#### How packages are grouped

**Body:** Through hole packages such as DIP and TO-220 pass leads through the board. Surface mount leaded packages such as SOIC and QFP have gull-wing leads that show a solder fillet. No-lead packages such as QFN and DFN have pads underneath, and array packages such as BGA and LGA hide every joint under the body. The more hidden the joint, the more you depend on process control and X-ray rather than visual inspection.

#### What it means for sourcing

**Body:** Package families are sometimes listed with the same name but different outlines, such as several QFN variants with different body sizes and pad layouts. An alternate with the same acronym is not automatically footprint compatible. Confirm body size, pitch, pad dimensions and exposed pad size against the drawing, and check the moisture sensitivity level for BGA, QFN and similar packages before accepting open stock.

#### Common mistakes

**Body:** A frequent error is treating DPAK and D2PAK as interchangeable: they are different sizes. Another is assuming that a thinner package has the same thermal performance, when a smaller body with a smaller exposed pad can run hotter at the same load. Store the full package name and body size in the item master rather than only a short acronym.

**Cta:** If package data is inconsistent across your item master, we can build a private agent that reads your ERP and supplier files and flags parts whose package descriptions disagree.

**Faq:**

#### What is the difference between QFN and QFP?

**Answer:** QFP has gull-wing leads that extend from the body on four sides, so joints are visible. QFN has flat pads under the body edge with no leads, giving a smaller footprint but joints that are harder to inspect.

#### Are SOIC, SSOP and TSSOP interchangeable?

**Answer:** No. They differ in lead pitch and body width, so they need different land patterns. Treat each as a separate footprint unless the manufacturer states a common outline.

#### Why do BGA parts need X-ray inspection?

**Answer:** The solder balls sit under the body, so bridging, voids and opens cannot be seen from the side. X-ray or functional test is how those joints are checked in production.

#### Does package name tell me the moisture sensitivity level?

**Answer:** Not directly. Moisture sensitivity depends on the molding compound and package construction, and is shown on the dry-pack label and datasheet. Many BGA and QFN parts are sensitive, so read the label.

## Search terms

ic package types, soic vs tssop, qfn vs bga, semiconductor package names, smd package types list, sot-23 package, to-220 vs to-252, lqfp meaning

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
