# Ignition SCADA Private AI Layer Blueprint Generator

> Source: https://netray.co/tools/ignition-scada-private-ai-layer-blueprint-generator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Fill in your environment and get an architecture plan for a private AI assistant on Ignition SCADA: components, security controls, rollout phases and open questions for IT.

## Category

mes-shop-floor

## Erp

Ignition by Inductive Automation

## Industry

Manufacturing, Aerospace and Defense

## Audience

- IT manager
- Controls engineer
- CIO
- Plant manager

## Tool

**Kind:** template

**Output:** document

**Fields:**

#### Company name

**Key:** company

**Type:** text

**Default:** Acme Precision Ltd

#### System version

**Key:** version

**Type:** select

**Options:**

- Ignition 8.1
- Ignition 8.3
- Ignition 7.9 (upgrade review needed)

**Default:** Ignition 8.1

#### Database engine / data layout

**Key:** db

**Type:** select

**Options:**

- PostgreSQL
- MariaDB or MySQL
- Microsoft SQL Server

**Default:** PostgreSQL

#### Hosting

**Key:** hosting

**Type:** select

**Options:**

- On-prem server
- Private cloud
- Air-gapped

**Default:** On-prem server

#### Named users who will use the assistant

**Key:** users

**Type:** number

**Default:** 80

#### Sites or plants in scope

**Key:** sites

**Type:** text

**Default:** Plant 1 (pilot), Plant 2 (phase 3)

#### Main use cases

**Key:** usecases

**Type:** textarea

**Default:** Ask about downtime, alarms and tag history in plain language, find tags by description, draft shift and downtime summaries, link downtime reasons to documents and work orders.

#### Data that must never leave the site

**Key:** never_leave

**Type:** textarea

**Default:** Tags from restricted lines, recipe values, operator identities, any export-controlled program data.

#### GPU available

**Key:** gpu

**Type:** select

**Options:**

- No GPU yet (procure)
- 1 x 24 GB class
- 1 x 48 GB class
- 2 to 4 x 48 GB class
- 8 or more data center GPUs

**Default:** 1 x 48 GB class

#### Target go-live (phase 1)

**Key:** golive

**Type:** date

**Default:** 2027-02-01

**Blocks:**

#### Private AI Layer Architecture Plan: Ignition SCADA

**Body:** Company: {{company}}
System: Ignition SCADA ({{version}})
Data layout: {{db}}
Hosting: {{hosting}}
Sites in scope: {{sites}}
Named users: {{users}}
Target go-live for phase 1: {{golive}}

#### 1. Context and scope

**Body:** {{company}} runs Ignition SCADA ({{version}}) and wants an AI assistant that works on the data and documents already held on site, without moving that data to a third-party cloud. Hosting model: {{hosting}}.

Main use cases:
{{usecases}}

Out of scope for the assistant: control writes of any kind, changes to controlled records without a person committing them, and any access beyond the roles each user already holds.

#### 2. Components

**Table:**

**Columns:**

- Component
- Design
- Notes for {{company}}

**Rows:**

**0:** Data access path

**1:** Read-only database account on the Tag Historian and Alarm Journal database plus approved Named Queries or WebDev endpoints

**2:** Read-only identity, reviewed by IT and controls owners. Data layout: {{db}}.

**0:** Retrieval index

**1:** Tag tree export (paths, descriptions, units, tag groups) plus SOPs, downtime reason guides and maintenance notes

**2:** Rebuilt on a schedule; source permissions stored with each chunk.

**0:** Model serving

**1:** Open-weight model served with vLLM or Ollama on local GPUs

**2:** GPU available: {{gpu}}. Sized for {{users}} named users; see the sizing calculator.

**0:** Tool server

**1:** MCP or HTTP server exposing a small set of approved read operations with time and row caps

**2:** No free-form queries from the model. Every operation is parameterised and reviewed.

**0:** Identity and permissions

**1:** Ignition roles, security zones and tag permissions mapped to tool-server allow lists

**2:** Negative tests per role before each phase gate.

**0:** Audit

**1:** Append-only log of question, user, sources, tool calls, row counts and answer

**2:** Readable by security. Retention per site policy. Hosting: {{hosting}}.

#### 3. Security controls mapped to your inputs

**Table:**

**Columns:**

- Control
- How it is applied

**Rows:**

**0:** Data residency

**1:** Model, embeddings, index, tool server and logs all run on {{company}} infrastructure ({{hosting}}). No outbound calls for inference.

**0:** Data that must never leave the site

**1:** {{never_leave}}

**0:** Least privilege

**1:** Read-only service identity; per-role allow lists; no admin accounts for the assistant.

**0:** Write-back

**1:** No PLC tag writes. Downtime or maintenance records only, via validated Named Queries or handlers with human approval.

**0:** Air-gap readiness

**1:** Model weights and containers imported on approved media; embeddings run locally; no runtime internet dependency.

**0:** Monitoring

**1:** Alerts on unusual query volume, denied-access spikes and tool errors.

#### 4. Rollout in three phases

**Table:**

**Columns:**

- Phase
- Scope
- Exit criteria

**Rows:**

**0:** 1: Read-only questions (target {{golive}})

**1:** One area or line, read-only questions with sources shown, for a pilot group of the {{users}} users

**2:** Answer quality reviewed on a fixed question set; permission negative tests passed; audit log reviewed by security

**0:** 2: Drafts

**1:** Drafted shift summaries, deviation write-ups and reports that a person edits and owns

**2:** Edit rate and time saved measured; no unreviewed output enters a controlled record

**0:** 3: Approved actions

**1:** Records or requests created in downstream systems through supported APIs after human approval

**2:** Approval flow tested; rollback and audit proven; extension to further sites considered

#### 5. Open questions for IT

**Body:** 1. Which database engine hosts the historian and alarm journal, and is a read replica available?
2. Are history tables partitioned monthly (default) and what is the retention and pruning policy?
3. Which identity provider or user source does the Gateway use, and can roles be read by the tool server?
4. Will access go through WebDev endpoints, Named Queries called by a service, or direct read-only SQL?
5. Which custom business tables (downtime reasons, production counts) are in scope and who documents them?
6. Who owns the model and index lifecycle (updates, re-indexing, evaluation) after go-live?
7. Which approval board signs off each phase gate?

#### Approvals

**Signatures:**

- IT / infrastructure
- Controls or OT owner
- Information security
- Business sponsor

**Notes:** This is a planning starting point, not a design guarantee. Confirm interfaces, versions and licensing against the vendor documentation for your installed release before committing to a build. Keep the assistant read-only against controlled records.

## Content

**Intro:** This generator turns your environment details into a structured architecture plan for adding a private AI assistant to Ignition SCADA. It covers components, security controls, rollout phases and the questions your IT and controls teams need to answer, and it exports to PDF or Word.

**Sections:**

#### How to use the generator

**Body:** Fill in the company, version, data layout, hosting model, named users and sites. Write the main use cases in plain language and, just as important, list the data that must never leave the site. Choose the GPU capacity you have or expect. The output document updates as you type. Export it, circulate it to IT, controls and security, and use the open questions as the agenda for a first review meeting.

**Bullets:**

- Start with one area and one pilot group
- Write the never-leave list first
- Be honest about GPU availability
- Treat the output as a draft for review, not a final design

#### What the plan contains

**Body:** The plan has six parts: scope, a components table, security controls tied to your inputs, a three-phase rollout, open questions and an approvals block. The components table covers the six things every private AI layer needs: a data access path, a retrieval index, model serving, a tool server, identity and permissions, and audit. Each is stated in terms specific to Ignition SCADA.

#### Design principles behind it

**Body:** The design follows a few principles. The assistant reads through approved, parameterised tools instead of free-form queries. It inherits the permissions each user already has. It never writes to control systems and writes to business systems only through supported APIs after a person approves the payload. Everything it does is logged. Inference runs on your own hardware, so the plan works in an air-gapped site as well as an on-prem one.

#### Common mistakes to avoid

**Body:** The usual failures are scoping too widely, giving the assistant an admin account for convenience, skipping negative permission tests, returning raw time-series or record dumps to the model instead of summaries, and ignoring data quality such as missing tag descriptions. Fix those in phase 1 and the later phases go much more smoothly.

**Cta:** If you want a second pair of eyes on this plan for your environment, Netray designs and builds private AI layers for on-prem industrial and ERP systems, and can review the document with your team.

**Faq:**

#### Does this work for an air-gapped site?

**Answer:** Yes. Choose Air-gapped as the hosting option. The design uses local models, a local index and a local audit log, with software imported on approved media and no runtime internet dependency.

#### Is the generated document a final design?

**Answer:** No. It is a structured starting point for review. Confirm interfaces, versions and licensing with the vendor documentation for your release, and adjust the components to what your IT team approves.

#### Which model should we use?

**Answer:** The plan assumes an open-weight model served with vLLM or Ollama. Which one fits depends on GPU memory, language needs and evaluation on your own question set, so test two or three candidates in phase 1.

#### Can the assistant change data in the system?

**Answer:** Not directly. The plan restricts it to read access, with write-back limited to supported APIs in business systems after a person approves each payload. Control-system writes are out of scope.

## Search terms

add AI to Ignition SCADA on-prem, Ignition AI architecture, Ignition private AI blueprint, Ignition local LLM, air-gapped AI Ignition, on-prem AI architecture document template, private AI reference architecture manufacturing, Ignition AI security controls

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
