# Infor Lawson LSF System Utilities and Batch Command Reference

> Source: https://netray.co/tools/infor-lawson-s3-system-utilities-command-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

The LSF command-line utilities Lawson admins use for the batch server, job queues and copying data, with purpose, example, where to run and cautions.

## Category

developer

## Erp

Infor Lawson S3

## Audience

- Lawson system administrator
- Lawson DBA
- LSF technical consultant

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Command

**Key:** cmd

**Type:** text

#### Purpose

**Key:** purpose

**Type:** text

#### Typical usage

**Key:** usage

**Type:** text

#### Run as / where

**Key:** where

**Type:** text

#### Caution

**Key:** caution

**Type:** text

**Rows:**

**Cmd:** lajs

**Purpose:** Lawson Batch Server: manages all batch programs; reads lajs.cfg when it starts

**Usage:** Not run by hand; controlled with startlajs, stoplajs and jqcontrol

**Where:** LSF server, Lawson environment

**Caution:** Edit lajs.cfg only with a backup; changes are read at start

**Cmd:** startlajs

**Purpose:** Starts the Lawson Batch Server

**Usage:** startlajs

**Where:** LSF server, Lawson admin user

**Caution:** Completion messages for steps that finished during the stop are sent after restart

**Cmd:** stoplajs

**Purpose:** Controlled stop of the Lawson Batch Server

**Usage:** stoplajs

**Where:** LSF server, Lawson admin user

**Caution:** Waiting jobs stay waiting; an active job step runs to completion first

**Cmd:** startjobqueue / stopjobqueue

**Purpose:** Start / Stop Lawson Job Queue (System Utilities Reference)

**Usage:** startjobqueue

**Where:** LSF server

**Caution:** Check jqstatus before and after

**Cmd:** jqcontrol

**Purpose:** Job Queue Control: reports batch server settings and performance and changes server parameters without stoplajs / startlajs

**Usage:** jqcontrol (see guide for options on your OS)

**Where:** LSF server

**Caution:** Parameter changes affect every running queue

**Cmd:** jqstatus

**Purpose:** Job Queue Status

**Usage:** jqstatus

**Where:** LSF server

**Caution:** First stop for jobs stuck in waiting or needs recovery

**Cmd:** jqrpt

**Purpose:** Job Queue Listing

**Usage:** jqrpt

**Where:** LSF server

**Caution:** Read-only report

**Cmd:** jqdef

**Purpose:** Job Queue Definition

**Usage:** jqdef

**Where:** LSF server, admin

**Caution:** Queue limits change throughput for all users of the queue

**Cmd:** jqsubmit

**Purpose:** Submit Batch Job

**Usage:** jqsubmit (job name and user per guide)

**Where:** LSF server

**Caution:** Job must already be defined

**Cmd:** jobdef

**Purpose:** Job Definition

**Usage:** jobdef

**Where:** LSF server

**Caution:** Jobs belong to a user; changing another user's job needs rights

**Cmd:** jobdump / jobload

**Purpose:** Job Dump / Job Load: export and import job definitions

**Usage:** jobdump, then jobload in the target environment

**Where:** LSF server, both environments

**Caution:** Check product line and user names match in the target

**Cmd:** jobrpt

**Purpose:** Job Listing

**Usage:** jobrpt

**Where:** LSF server

**Caution:** Read-only

**Cmd:** jobstatus

**Purpose:** Job Status Utility

**Usage:** jobstatus

**Where:** LSF server

**Caution:** Use with jqstatus when a job will not restart

**Cmd:** deljobhst

**Purpose:** Delete Job History

**Usage:** deljobhst

**Where:** LSF server, admin

**Caution:** Deletes history users may need for audit; agree retention first

**Cmd:** recdef / recrpt

**Purpose:** Recurring Job Definition / Recurring Job Listing

**Usage:** recrpt to review, recdef to change

**Where:** LSF server

**Caution:** Review recurring jobs after a clone so test does not run production schedules

**Cmd:** dbdump

**Purpose:** Dump Database File to standard output or a file

**Usage:** dbdump -d -iGLMSET1 dataarea GLMASTER > glmaster.dmp

**Where:** LSF server

**Caution:** Without -d, fields wider than 80 columns are truncated

**Cmd:** dbload

**Purpose:** Load a database file from a dbdump flat file

**Usage:** dbload -f dataarea GLMASTER glmaster.dmp

**Where:** LSF server, target data area

**Caution:** -a overwrites duplicates, -n keeps existing, -r reports; check the guide for the -f option on your database type. Not for non-Lawson data

**Cmd:** rngdbdump

**Purpose:** Dump a range of records from one file, optionally as CSV or dbload format

**Usage:** rngdbdump -c -iGLMSET2 dataarea GLMASTER -k 100

**Where:** LSF server

**Caution:** -c CSV, -d dbload format, -n no headers, -f field list, -k key values, -z writes a log under LAWDIR/system/joblog

**Cmd:** importdb

**Purpose:** Import Comma-Delimited File into a Lawson database file

**Usage:** importdb with a CSV created by rngdbdump -c (options per guide)

**Where:** LSF server, target data area

**Caution:** Test on a copy; CSV column order must match the file definition

**Cmd:** dbcopy

**Purpose:** Database Copy: copies data from one data area to another

**Usage:** dbcopy (see guide)

**Where:** LSF server

**Caution:** Overwrites target data; confirm the target data area twice

**Cmd:** sqldbcopy

**Purpose:** Copy a database file between data areas using SQL

**Usage:** sqldbcopy (see guide)

**Where:** LSF server

**Caution:** Both data areas must be on reachable SQL databases

**Cmd:** expsysdb / impexp

**Purpose:** Export System Data / Import an Export File, including attachment files

**Usage:** expsysdb in source, impexp in target

**Where:** LSF server, both product lines

**Caution:** Use these, not dbdump, when attachments (L_H / L_D files) must move too

**Cmd:** count

**Purpose:** Count Records in Table

**Usage:** count (see guide for arguments)

**Where:** LSF server

**Caution:** Quick check before and after a load

**Cmd:** dbdef

**Purpose:** Database Definition

**Usage:** dbdef

**Where:** LSF server, developer or admin

**Caution:** Definition changes need a database reorganisation

**Cmd:** blddbdict

**Purpose:** Build Dictionary

**Usage:** blddbdict

**Where:** LSF server, admin

**Caution:** Run in a maintenance window

**Cmd:** dbusers

**Purpose:** View Database Processes

**Usage:** dbusers

**Where:** LSF server

**Caution:** Check before stopping servers or reorganising

**Cmd:** startlaw / stoplaw

**Purpose:** Start / Stop All Lawson Servers

**Usage:** stoplaw, then startlaw

**Where:** LSF server, admin

**Caution:** Stops every Lawson server process; announce downtime

**Cmd:** tmmon / tmcontrol

**Purpose:** Transaction Manager Monitor / Transaction Monitor Control

**Usage:** tmmon

**Where:** LSF server

**Caution:** Watch online transaction load before restarting latm

**Cmd:** licsta

**Purpose:** License Status

**Usage:** licsta

**Where:** LSF server

**Caution:** Read-only

**Cmd:** lashow

**Purpose:** Display File

**Usage:** lashow on a job log or print file

**Where:** LSF server

**Caution:** Read-only

**Notes:** Names and one-line purposes follow the LSF 10.0 System Utilities Reference index. Options are shown only where the guide documents them; for others, check the guide for your platform (UNIX, Windows, IBM i). 'dataarea' and file names are placeholders.

## Content

**Intro:** A searchable list of the Lawson System Foundation (LSF 9.x to 10.x) command-line utilities that S3 admins use for the batch server, job queues and data copies. Each row gives the purpose from the Infor System Utilities Reference, a typical command, where to run it and what to watch.

**Sections:**

#### How to use this reference

**Body:** Search by command or by task word such as 'queue', 'dump' or 'copy'. Commands run in a Lawson environment shell on the LSF server, as a user with the Lawson environment variables set (LAWDIR, GENDIR and the product line variables). Most job and queue utilities read the GEN data area; data utilities take a data area (product line) and a file name such as GLMASTER. Export the table to Excel to build a runbook for your own servers, adding your real data area names and paths.

**Bullets:**

- Batch: lajs, startlajs, stoplajs, jqcontrol, jqstatus, jqrpt
- Jobs: jobdef, jobdump, jobload, jobrpt, recdef
- Data: dbdump, dbload, rngdbdump, importdb, dbcopy, expsysdb, impexp

#### Batch troubleshooting flow

**Body:** When users report a job stuck in 'waiting', start with jqstatus to see whether the batch server and queue are active. If the queue is held or the server is down, check lajs.cfg and restart with stoplajs and startlajs; stopping is controlled, so an active step finishes first. If the server is fine, look at the job itself with jobstatus and the job log (job logs sit under LAWDIR/system/joblog for utilities that log, such as rngdbdump -z). Use jqcontrol to inspect settings or adjust batch server parameters without a restart. Only delete history with deljobhst once audit needs are clear.

#### Copying data safely between product lines

**Body:** For one file, dbdump -d writes a flat file that dbload can read; check the dbload options for your database type before loading. For a subset, rngdbdump selects by key (-k) or field value and can write CSV (-c) for importdb or dbload format (-d). For whole product lines, or when attachments must travel, use expsysdb and impexp, because attachment headers and details live in separate L_H and L_D files that a plain dbdump misses. Always count records before and after, run against a test data area first, and keep the dump file until users sign off. dbload is not meant for importing data from non-Lawson systems.

#### Gotchas

**Body:** Utilities behave slightly differently on UNIX, Windows and IBM i, so read the guide for your platform before scripting. Fields wider than 80 columns are truncated by dbdump and rngdbdump unless you use -d or -c. After cloning production to test, review recurring jobs (recrpt) before starting the batch server, or test will run production schedules and send real emails. GEN tables such as USERINFO can be dumped with rngdbdump against the gen data area, but treat GEN as system data: never load into it without Infor guidance.

**Cta:** If your team wants to ask about Lawson job failures and batch history in plain English on your own servers, we can set up a read-only assistant over GEN and job logs.

**Faq:**

#### Where do I get Infor Lawson support for these utilities?

**Answer:** The authoritative source is the Infor Lawson System Utilities Reference Guide for your LSF version on docs.infor.com, plus Infor Support (Concierge) for cases. Community forums such as LawsonGuru are useful for examples, but confirm options in the guide for your platform.

#### What is the Lawson batch server called?

**Answer:** The Lawson Batch Server process is lajs. It reads lajs.cfg on start, manages all batch programs, and is stopped and started with stoplajs and startlajs. jqcontrol reports its settings and can change parameters without a restart.

#### How do I export a Lawson table to CSV?

**Answer:** Use rngdbdump with -c, giving the data area and file name, and optionally -f for a field list and -k for key values. Redirect output to a file. The CSV can be loaded into another data area with importdb.

#### Does the Infor Lawson installation guide cover these commands?

**Answer:** Installation guides reference them during setup, but full syntax is in the System Utilities Reference. Data transfer chapters in the administration guides explain when to use dbdump and dbload versus expsysdb and impexp, and when importdb is the right tool for CSV data.

## Search terms

infor lawson support, infor lawson system, lawson system utilities, lawson jqstatus, lawson rngdbdump, lawson dbdump dbload, lawson importdb, infor lawson installation guide

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
