# Infor LN Multi-Site Rollout Planner

> Source: https://netray.co/tools/infor-ln-multi-site-rollout-planner
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Model your Infor LN global rollout: enter sites, wave size, and complexity to get wave count, total timeline, program cost, and cost per site.

## Category

infor-ln

## Tool

**Kind:** calculator

**Inputs:**

#### Total sites to deploy

**Key:** total_sites

**Type:** number

**Default:** 6

**Min:** 2

**Max:** 40

**Step:** 1

**Unit:** sites

**Help:** All plants, warehouses, and entities that will go live on LN, including the pilot.

#### Pilot site duration

**Key:** pilot_months

**Type:** slider

**Default:** 6

**Min:** 3

**Max:** 12

**Step:** 1

**Unit:** months

**Help:** Template build plus first go-live. Shorter than 5 months is rarely realistic for LN.

#### Sites per rollout wave

**Key:** sites_per_wave

**Type:** slider

**Default:** 2

**Min:** 1

**Max:** 6

**Step:** 1

**Unit:** sites

**Help:** How many sites go live simultaneously in each wave after the pilot.

#### Site-to-site process variation

**Key:** site_complexity

**Type:** select

**Default:** 1

**Help:** How different the sites are from each other in processes and local requirements.

**Options:**

##### Similar - shared processes, same region

**Value:** 0.8

##### Some variation - different products or countries

**Value:** 1

##### Highly varied - different modes, languages, statutory regimes

**Value:** 1.3

#### Deployment team model

**Key:** team_model

**Type:** select

**Default:** 1

**Help:** Dedicated rollout teams move faster than teams shared with daily operations.

**Options:**

##### Dedicated core rollout team

**Value:** 0.85

##### Shared team - part-time site resources

**Value:** 1

##### Minimal - sites largely self-serve

**Value:** 1.25

**Outputs:**

#### Rollout waves after pilot

**Key:** waves_after_pilot

**Expr:** ceil((total_sites - 1) / sites_per_wave)

**Format:** number

**Description:** Number of deployment waves needed to cover the remaining sites.

#### Duration per wave

**Key:** months_per_wave

**Expr:** round(30 * site_complexity * team_model) / 10

**Format:** months

**Description:** Localization, data load, training, and go-live per wave, from a 3-month baseline.

#### Total program timeline

**Key:** total_timeline_months

**Expr:** round(pilot_months + waves_after_pilot * months_per_wave)

**Format:** months

**Primary:** true

**Description:** Pilot through final site go-live, assuming waves run sequentially.

#### Estimated program cost

**Key:** program_cost

**Expr:** round(pilot_months * 60000 + waves_after_pilot * months_per_wave * sites_per_wave * 45000 * site_complexity)

**Format:** currency

**Primary:** true

**Description:** External services plus dedicated internal effort. Excludes licensing and infrastructure.

#### Average cost per site

**Key:** cost_per_site

**Expr:** round(program_cost / total_sites)

**Format:** currency

**Description:** Useful for charging deployment cost back to business units.

**Disclaimer:** Estimates only. Actual rollout cost and timeline depend on template quality, data readiness per site, and local statutory complexity. Licensing excluded.

## Content

**Intro:** This free planner models an Infor LN multi-site rollout for program managers and IT executives planning a global template deployment. Enter your site count, pilot duration, wave size, site-to-site variation, and team model, and get the wave count, end-to-end timeline, program cost, and cost per site. Multi-site LN programs live or die on rollout mechanics - wave sizing, template discipline, and team structure - far more than on product capability, and this tool lets you test those decisions numerically before committing to a plan.

**Sections:**

#### The math behind the plan

**Body:** The model follows the standard template-and-wave structure used in successful LN programs. The pilot covers global template build plus the first go-live - the most expensive months, benchmarked at $60k per month of blended program cost. Remaining sites deploy in waves; each wave starts from a 3-month baseline, scaled up by site variation (highly varied sites need localization and statutory work) and by team model (shared teams lose momentum to daily operations). Wave cost is driven by sites per wave at roughly $45k per site-month, scaled by complexity. Cost per site simply spreads the program across all sites, which is how most organizations charge deployment back to business units.

#### Wave sizing: the decision that shapes everything

**Body:** Sites per wave is the most consequential input, and both extremes fail predictably. One site per wave keeps risk low but stretches programs so long that momentum, budget patience, and team continuity collapse - a 12-site rollout at one site per quarter is a 3-year commitment before the last site sees value. Oversized waves overload the core team, and quality drops exactly where it hurts:

**Bullets:**

- Two to three sites per wave is the sustainable norm for a single dedicated LN core team
- Waves above four sites need parallel deployment teams, which roughly doubles core staffing cost
- Grouping waves by similarity - region, statutory regime, manufacturing mode - cuts per-wave effort 15-25%
- Every wave should end with a formal template feedback cycle, or site-level workarounds quietly fork the template

#### Reading your results honestly

**Body:** If your total timeline exceeds 30 months, treat that as a design warning: programs that long face leadership turnover, budget fatigue, and template drift, so consider larger waves with added team capacity, or descoping sites that could share an entity. If cost per site looks low compared to your pilot cost, that is the template payoff working as intended - later sites should cost a fraction of the first. But that payoff only materializes with template discipline; every site-specific customization you allow adds cost to all subsequent waves. Sequential waves are assumed here; overlapping waves compress timeline but require genuinely separate teams, not the same people working double.

#### How Netray runs LN rollouts

**Body:** Netray delivers multi-site LN programs with a template-first discipline: we build the global template with extension-based localization only, script the per-site deployment playbook, and use AI-assisted data migration tooling so each site's data load is a repeatable run rather than a bespoke project. That is what makes wave costs actually decline site over site. We staff dedicated core teams, train site super-users as force multipliers, and run the template feedback board that keeps forty sites on one template instead of forty. If your modeled timeline or cost looks unworkable, a rollout design session with us usually finds 20-30% of both.

**Cta:** Model your rollout, then have a Netray LN program specialist stress-test the wave plan against your actual site list.

**Faq:**

#### Should the pilot site be our biggest site or our simplest?

**Answer:** Neither extreme. The best pilot is a representative mid-complexity site: big enough that the template gets a real workout across your core processes, small enough that go-live risk is containable. Piloting your flagship plant risks the whole business on version one of the template; piloting a trivial site produces a template that breaks at the first real site. Many programs also weight pilot choice by leadership: a site with a strong, engaged plant manager beats a slightly better structural fit.

#### Can rollout waves run in parallel to shorten the timeline?

**Answer:** Yes, but only with genuinely separate deployment teams - the constraint is people, not process. Overlapping waves with a single core team is the most common way rollout quality collapses, because template experts get split across go-lives and both waves slip. A workable pattern is staggered overlap: wave two starts its preparation while wave one is in final testing, sharing analysts but never sharing go-live weekends. Budget roughly 1.7x team cost for true parallel waves, not 2x, due to shared program overhead.

#### How do we stop sites from customizing the global template?

**Answer:** With governance that has teeth and an alternative that works. Every site request goes to a template board that classifies it as statutory (accepted), genuine local process need (extension, never modification), or preference (declined with reasoning). The board must include business owners, not just IT, so decisions stick. Equally important is speed: if legitimate requests take months, sites build workarounds. Extension-based development and a fast template release cycle are what make the governance sustainable rather than theoretical.

## Search terms

infor ln multi site rollout, infor ln global template, erp rollout wave planning, infor ln deployment plan, multi site erp implementation cost, ln rollout timeline, global erp rollout strategy

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
