# Infor M3 AI Assistant Sizing and Value Calculator

> Source: https://netray.co/tools/infor-m3-ai-assistant-sizing-value-calculator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Size the GPUs and estimate the monthly value and payback of a private, on-prem AI assistant for Infor M3.

## Category

infor-cloudsuite

## Erp

Infor M3

## Audience

- CIO
- IT architect
- Plant manager

## Tool

**Kind:** calculator

**Currency:** $

**Inputs:**

#### Named users

**Key:** users

**Type:** number

**Default:** 300

**Min:** 1

**Step:** 10

**Unit:** users

#### Daily active share

**Key:** active_pct

**Type:** slider

**Default:** 20

**Min:** 1

**Max:** 100

**Step:** 1

**Unit:** %

**Help:** Share of named users who ask at least one question per day.

#### Questions per active user per day

**Key:** q_per_user

**Type:** number

**Default:** 8

**Min:** 1

**Step:** 1

**Unit:** questions

#### Average prompt plus answer tokens

**Key:** tokens_q

**Type:** number

**Default:** 2500

**Min:** 100

**Step:** 100

**Unit:** tokens

**Help:** Includes retrieved context. Document questions run higher than record lookups.

#### Share of daily questions in the busiest hour

**Key:** peak_share

**Type:** slider

**Default:** 25

**Min:** 5

**Max:** 60

**Step:** 1

**Unit:** %

#### Seconds the system works per question

**Key:** secs_q

**Type:** number

**Default:** 12

**Min:** 1

**Step:** 1

**Unit:** s

#### Tokens per second per GPU (aggregate, batched)

**Key:** tps_gpu

**Type:** number

**Default:** 1500

**Min:** 50

**Step:** 50

**Unit:** tokens/s

**Help:** Assumption: depends on model size, quantisation and GPU. Measure on your hardware.

#### Spare GPUs for redundancy

**Key:** spare

**Type:** number

**Default:** 1

**Min:** 0

**Step:** 1

**Unit:** GPUs

#### Documents to index

**Key:** docs

**Type:** number

**Default:** 200000

**Min:** 0

**Step:** 1000

**Unit:** documents

#### Average pages per document

**Key:** pages

**Type:** number

**Default:** 6

**Min:** 1

**Step:** 1

**Unit:** pages

#### Minutes saved per question

**Key:** mins_saved

**Type:** number

**Default:** 4

**Min:** 0

**Step:** 0.5

**Unit:** min

#### Loaded hourly cost

**Key:** hourly

**Type:** number

**Default:** 45

**Min:** 0

**Step:** 1

**Unit:** $/h

#### Working days per month

**Key:** workdays

**Type:** number

**Default:** 21

**Min:** 1

**Max:** 31

**Step:** 1

**Unit:** days

#### Monthly cost per GPU

**Key:** gpu_cost

**Type:** number

**Default:** 1800

**Min:** 0

**Step:** 100

**Unit:** $/month

**Help:** Amortised hardware, power and hosting.

#### One-time setup cost

**Key:** setup

**Type:** number

**Default:** 60000

**Min:** 0

**Step:** 1000

**Unit:** $

**Outputs:**

#### Daily active users

**Key:** active

**Expr:** users * active_pct / 100

**Format:** integer

#### Questions per day

**Key:** qpd

**Expr:** active * q_per_user

**Format:** integer

#### Tokens per day

**Key:** tpd

**Expr:** qpd * tokens_q

**Format:** number

**Description:** Questions per day times average tokens per question.

#### Peak concurrent requests

**Key:** peak_conc

**Expr:** max(1, ceil(qpd * peak_share / 100 / 3600 * secs_q))

**Format:** integer

**Description:** Busiest-hour questions per second times seconds of work per question, rounded up.

#### GPUs needed incl. spare

**Key:** gpus

**Expr:** max(1, ceil(qpd * peak_share / 100 / 3600 * tokens_q / tps_gpu)) + spare

**Format:** integer

**Primary:** true

**Description:** Peak tokens per second divided by tokens per second per GPU, plus spares.

#### Vector index size

**Key:** index_gb

**Expr:** docs * pages * 3 * 1024 * 4 * 1.5 / 1000000000

**Format:** decimal

**Description:** Gigabytes, assuming 3 chunks per page, 1024-dimension float32 vectors and 50 percent overhead.

#### Hours saved per month

**Key:** hours

**Expr:** qpd * workdays * mins_saved / 60

**Format:** hours

#### Monthly value

**Key:** value

**Expr:** hours * hourly

**Format:** currency

**Primary:** true

#### Monthly GPU cost

**Key:** cost

**Expr:** gpus * gpu_cost

**Format:** currency

#### Payback

**Key:** payback

**Expr:** if(gt(value - cost, 0), setup / (value - cost), 0)

**Format:** months

**Description:** One-time setup divided by monthly value minus GPU cost. Zero means no payback.

**Chart:**

#### Monthly value vs GPU cost by named users

**Type:** line

**X:** users

**From:** 50

**To:** 2000

**Steps:** 20

**Series:**

- value
- cost

**Disclaimer:** Planning estimate only. Tokens per second, minutes saved and active share are assumptions you must replace with measured or surveyed numbers.

## Content

**Intro:** This calculator sizes the hardware and estimates the value of a private AI assistant running on your own servers in front of Infor M3. Enter user numbers, usage and your own assumptions to get GPU count, index size and payback.

**Sections:**

#### How to use it

**Body:** Start with named users and the share who ask a question on a given day, then the number of questions and the average tokens for a prompt plus answer. Enter the documents you want searchable and the minutes a good answer saves. The outputs update live, and the chart sweeps named users.

**Bullets:**

- Use a pilot or survey to set the active share; 10 to 25 percent is common for early rollouts.
- Document questions use more tokens than record lookups, so raise the average if retrieval is heavy.
- Replace the tokens-per-second default with a measured figure for your model and GPU.

#### The formulas

**Body:** Questions per day equals named users times active share times questions per user. Tokens per day is questions times tokens per question. Peak tokens per second is busiest-hour questions divided by 3,600 times tokens per question; GPUs are that figure divided by tokens per second per GPU, rounded up, plus spares. Index size is documents times pages times 3 chunks times 1,024 floats at 4 bytes with 50 percent overhead. Monthly value is questions times working days times minutes saved divided by 60, times loaded hourly cost.

#### How to read the result

**Body:** If monthly value is well above GPU cost, payback is short and the sizing is not the constraint. If it is close, the assumptions on minutes saved and active share matter most; test them in a pilot before buying hardware. Index size is usually small compared with the model weights; the GPU count is driven by peak concurrency, not by user count alone.

#### Common mistakes and Infor M3 notes

**Body:** Typical errors: using average load instead of the busiest hour, ignoring spares, and counting every user as active. For Infor M3 the data comes from your own system and documents, so no per-seat cloud fee applies; hardware, power, setup and people are the cost. Vendor tools may be enough if you only need standard reports.

**Bullets:**

- Assume nothing about throughput until you measure.
- Keep a spare GPU or a failover plan for working hours.
- Check licence terms of the open-weight model you choose.

**Cta:** If you want these numbers validated against your Infor M3 data volumes and a pilot, Netray can help you measure real usage and size the hardware.

**Faq:**

#### What tokens per second should I use?

**Answer:** The default is a planning figure for batched serving of a mid-size open-weight model on one modern GPU. Real throughput depends on model, quantisation, context length and software, so benchmark vLLM or Ollama on your hardware.

#### Why does peak matter more than daily volume?

**Answer:** GPUs must serve the busiest hour, not the daily average. If a quarter of questions land in one hour, capacity must cover that burst or users wait.

#### Is the value figure reliable?

**Answer:** It is only as good as minutes saved per question and the active share. Use a small pilot with timed tasks to set them, then treat the result as a range.

#### Does the index size include the model?

**Answer:** No. Index size covers vectors for your documents. Model weights add roughly several GB to tens of GB per model depending on size and quantisation.

## Search terms

Infor M3 AI sizing calculator, Infor M3 AI ROI, on-prem LLM GPU sizing, Infor M3 AI assistant payback, tokens per day calculator, private AI value calculator

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
