# Infor M3 Private AI Layer Blueprint Generator

> Source: https://netray.co/tools/infor-m3-private-ai-layer-blueprint-generator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Fill in your Infor M3 environment and get a ready-to-share architecture plan for a private, on-prem AI assistant.

## Category

infor-cloudsuite

## Erp

Infor M3

## Audience

- CIO
- IT architect
- ERP administrator

## Tool

**Kind:** template

**Output:** document

**Fields:**

#### Company name

**Key:** company

**Type:** text

**Default:** Acme Precision Ltd

#### Infor M3 version

**Key:** version

**Type:** select

**Options:**

- M3 13.4
- M3 14.x
- M3 15.x
- Other / mixed

**Default:** M3 13.4

#### Database engine

**Key:** db

**Type:** select

**Options:**

- DB2 for i
- SQL Server
- Oracle
- Other

**Default:** DB2 for i

#### Hosting

**Key:** hosting

**Type:** select

**Options:**

- On-prem server
- Private cloud
- Air-gapped

**Default:** On-prem server

#### Named users

**Key:** users

**Type:** number

**Default:** 300

#### Sites or plants

**Key:** sites

**Type:** number

**Default:** 2

#### Main use cases

**Key:** usecases

**Type:** textarea

**Default:** Ask about customer order status, item balances, manufacturing orders and purchase delays; search documents; draft supplier and customer emails.

#### Data that must never leave the site

**Key:** never

**Type:** textarea

**Default:** Customer pricing, supplier contracts, controlled technical data.

#### GPU available

**Key:** gpu

**Type:** select

**Options:**

- None yet
- 1 GPU (24-48 GB)
- 1 GPU (80 GB)
- 2 or more GPUs

**Default:** None yet

#### Target go-live

**Key:** golive

**Type:** date

**Default:** 2027-03-31

**Blocks:**

#### Context

**Body:** Company: {{company}}
Infor M3 version: {{version}}
Database: {{db}}
Hosting: {{hosting}}
Named users: {{users}} across {{sites}} site(s)
GPU: {{gpu}}
Target go-live: {{golive}}

Purpose: add a private AI assistant to the existing Infor M3 system without moving data outside the site.

#### Use cases

**Body:** {{usecases}}

#### Data that must stay on site

**Body:** {{never}}

These classes are excluded from any external service. The model, retrieval index and logs run on {{hosting}} infrastructure only.

#### Components

**Table:**

**Columns:**

- Component
- Design for Infor M3

**Rows:**

**0:** Data access path

**1:** M3 API MI programs through ION or direct, plus a read-only reporting copy of selected tables

**0:** Retrieval index

**1:** Local embeddings over M3 documents, drawings and file shares with company and ACL metadata

**0:** Model serving

**1:** Open-weight model on vLLM or Ollama on local GPUs

**0:** Tool server

**1:** MCP or tool server mapping named actions to MI transactions or parameterised queries

**0:** Identity and permissions

**1:** SSO to M3 user; company, division, facility and warehouse authority applied

**0:** Audit

**1:** Append-only log of prompt, tool call, query and answer

#### Security controls mapped to your inputs

**Table:**

**Columns:**

- Control
- How it applies

**Rows:**

**0:** Network

**1:** Hosting is {{hosting}}; the model server has no outbound internet route; only the tool server reaches Infor M3 ({{db}})

**0:** Data classes

**1:** Excluded or masked before indexing: {{never}}

**0:** Access

**1:** MI program least privilege, authority mirroring, reporting copy for aggregates, no free SQL

**0:** Scale

**1:** {{users}} named users across {{sites}} site(s); capacity checked against the GPU position: {{gpu}}

**0:** Write-back

**1:** Disabled in phase 1; later only through supported Infor M3 interfaces with named-user approval

#### Rollout

**Table:**

**Columns:**

- Phase
- Scope
- Exit criterion

**Rows:**

**0:** 1. Read-only questions

**1:** Named read actions and document search for the use cases above

**2:** Answers match Infor M3 screens on a test set, no cross-permission leaks

**0:** 2. Drafts

**1:** Assistant drafts emails, notes and change proposals for a user to review

**2:** Users accept most drafts with light edits; audit log reviewed

**0:** 3. Approved actions

**1:** Selected writes through supported interfaces after explicit approval

**2:** Zero unapproved writes; rollback tested; target go-live {{golive}}

#### Open questions for IT

**Body:** 1. Which M3 companies, divisions and warehouses are in scope?
2. Is ION on-prem and reachable by the tool server?
3. Which MI programs are enabled for the integration user?
4. Who owns the audit log and how long is it retained?
5. Which identity provider issues the user identity the tool server will use?

#### Approvals

**Signatures:**

- Prepared by
- IT security
- ERP owner

**Notes:** This is a starting plan, not a design guarantee. Object names, endpoints and versions vary by installation; confirm them with your Infor M3 administrator before building. Sizing figures come from the companion calculator.

## Content

**Intro:** This generator turns a few facts about your Infor M3 system into a written architecture plan for a private AI assistant that runs on your own infrastructure. It is meant for the first conversation between IT, the ERP owner and security.

**Sections:**

#### How to use the generator

**Body:** Fill in the company, Infor M3 version, database, hosting model, user and site counts, use cases, data that must stay on site, GPU position and target date. The document updates as you type and exports to PDF or Word for circulation.

**Bullets:**

- Be specific about use cases: lookups, document search and drafts are cheap, actions are not.
- List data classes, not systems, under what must stay on site.
- Choose air-gapped only if no component may reach the internet at runtime.
- Treat the open questions as the agenda for the first IT meeting.

#### What the plan contains

**Body:** The plan lists six components for Infor M3: data access path, retrieval index, model serving, tool server, identity and permissions, and audit. It maps security controls to your inputs and sets out a three-phase rollout from read-only questions to approved actions.

**Bullets:**

- Read-only first, writes later through supported interfaces only.
- One tool per approved read action, never free SQL from the model.
- Permissions mirrored from Infor M3 so the assistant cannot show more than the user could see.

#### How to read the result

**Body:** Check that each component has an owner and that the rollout exit criteria are testable. If the GPU position is none, run the sizing calculator before ordering hardware. If your hosting is private cloud rather than on-prem, confirm contractually that the GPU nodes are single-tenant or logically isolated.

#### Common mistakes

**Body:** Teams often start with write actions, skip the audit log, or give the assistant a service account that sees every site. Another frequent issue is forgetting documents: much of the value is in drawings, certs and procedures, not tables. This plan puts documents and permissions in the first phase on purpose.

**Cta:** If you would like a second pair of eyes on the plan for your Infor M3 environment, Netray builds private and air-gapped AI on top of ERP systems and can review it with you.

**Faq:**

#### Does this plan require a cloud service?

**Answer:** No. All components can run on your own servers, including air-gapped, with open-weight models served locally. A private cloud option is available if you prefer to host there.

#### Is the plan specific to Infor M3?

**Answer:** The components table and controls name Infor M3 access mechanisms and permission models. Version-specific object names must still be confirmed on your system.

#### Can I edit the document after export?

**Answer:** Yes. The Word export is editable, and you can change fields and re-export at any time. Nothing is sent anywhere; the tool runs in your browser.

#### How do I size the GPUs?

**Answer:** Use the companion sizing and value calculator, which estimates concurrent requests, tokens per day and GPU count from your user numbers and an assumed tokens-per-second figure.

## Search terms

Infor M3 AI architecture, Infor M3 private AI blueprint, Infor M3 on-prem AI plan, on-prem AI architecture template, Infor M3 LLM integration design, private AI layer for ERP

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
