# ISO 13849-1 Performance Level (PL) and SIL Reference Table

> Source: https://netray.co/tools/iso-13849-performance-level-and-sil-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

One table for PL a to e, PFHd bands, SIL 1 to 3 equivalents, structure categories, MTTFd and diagnostic coverage bands.

## Category

compliance-legal

## Industry

Industrial Machinery

## Audience

- Safety engineer
- Machine designer
- Controls engineer

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Item

**Key:** item

**Type:** text

#### Group

**Key:** group

**Type:** text

#### Range or definition

**Key:** value

**Type:** text

#### Note

**Key:** note

**Type:** text

**Rows:**

**Item:** PL a

**Group:** Performance level

**Value:** PFHd 1E-5 to below 1E-4 per hour

**Note:** Lowest level; no direct SIL equivalent

**Item:** PL b

**Group:** Performance level

**Value:** PFHd 3E-6 to below 1E-5 per hour

**Note:** Roughly SIL 1 band at the upper end

**Item:** PL c

**Group:** Performance level

**Value:** PFHd 1E-6 to below 3E-6 per hour

**Note:** Corresponds to SIL 1

**Item:** PL d

**Group:** Performance level

**Value:** PFHd 1E-7 to below 1E-6 per hour

**Note:** Corresponds to SIL 2

**Item:** PL e

**Group:** Performance level

**Value:** PFHd 1E-8 to below 1E-7 per hour

**Note:** Corresponds to SIL 3

**Item:** SIL 1

**Group:** Safety integrity level (IEC 62061)

**Value:** PFH 1E-6 to below 1E-5 per hour

**Note:** High demand or continuous mode

**Item:** SIL 2

**Group:** Safety integrity level (IEC 62061)

**Value:** PFH 1E-7 to below 1E-6 per hour

**Note:** High demand or continuous mode

**Item:** SIL 3

**Group:** Safety integrity level (IEC 62061)

**Value:** PFH 1E-8 to below 1E-7 per hour

**Note:** High demand or continuous mode

**Item:** Category B

**Group:** Structure category

**Value:** Basic safety principles, single channel, no diagnostics

**Note:** A fault can cause loss of the safety function

**Item:** Category 1

**Group:** Structure category

**Value:** Single channel using well-tried components and principles

**Note:** Higher MTTFd than Category B

**Item:** Category 2

**Group:** Structure category

**Value:** Single channel with periodic testing of the safety function

**Note:** Test interval must be sufficiently frequent versus demand rate

**Item:** Category 3

**Group:** Structure category

**Value:** Redundant, single fault does not lose the safety function

**Note:** Single faults detected where reasonably practicable

**Item:** Category 4

**Group:** Structure category

**Value:** Redundant, single fault detected at or before next demand

**Note:** Accumulation of undetected faults must not lose the function

**Item:** MTTFd low

**Group:** MTTFd per channel

**Value:** 3 years to below 10 years

**Note:** Mean time to dangerous failure

**Item:** MTTFd medium

**Group:** MTTFd per channel

**Value:** 10 years to below 30 years

**Item:** MTTFd high

**Group:** MTTFd per channel

**Value:** 30 years to 100 years

**Note:** Value capped at 100 years per channel

**Item:** DC none

**Group:** Diagnostic coverage

**Value:** Below 60 percent

**Item:** DC low

**Group:** Diagnostic coverage

**Value:** 60 percent to below 90 percent

**Item:** DC medium

**Group:** Diagnostic coverage

**Value:** 90 percent to below 99 percent

**Item:** DC high

**Group:** Diagnostic coverage

**Value:** 99 percent or higher

**Item:** CCF

**Group:** Common cause failure

**Value:** Score of at least 65 out of 100 required

**Note:** Applies to redundant categories 2, 3 and 4 via the measures list in the standard

**Notes:** Summary table for orientation, not a substitute for the standard. PFHd is the probability of dangerous failure per hour. SIL values use IEC 62061 and IEC 61508 bands. Actual PL determination uses the Table 7 style combination of category, MTTFd and DC, plus software, systematic failure and validation requirements. Verify against the current edition of ISO 13849-1 and ISO 13849-2.

## Content

**Intro:** Machine safety functions such as emergency stop, light curtain muting and guard interlocks are rated with a performance level (PL) from ISO 13849-1, or a SIL from IEC 62061. This table collects the bands you keep looking up in one searchable place.

**Sections:**

#### How to use this table

**Body:** Start from the required performance level (PLr) set during risk assessment, then check that the designed safety function reaches it. Find PLr in the first rows, check the PFHd limit, and confirm the category, MTTFd and diagnostic coverage rows you used in your calculation. If your customer or notified body quotes SIL, use the SIL rows for the equivalent band.

**Bullets:**

- Set PLr from risk assessment first
- Pick a category that can support the PL
- Check MTTFd and DC band per channel
- Confirm common cause failure measures for redundant designs

#### PL versus SIL

**Body:** PL c, d and e line up with SIL 1, 2 and 3 on PFHd. PL a and b have no clean SIL counterpart. The two methods differ in how they build up the number: ISO 13849-1 uses a simplified category-based method, while IEC 62061 uses a subsystem and reliability block approach. Use the one your harmonised standard or customer references, and state it in the technical file.

#### Worked example

**Body:** A safety door with a coded magnetic switch pair and a safety relay is assessed at PLr d. A two channel Category 3 architecture with medium MTTFd (say 20 years per channel) and high DC can reach PL d. If you use a single channel Category 2 design, you would likely fall short. Record each component's B10d value from datasheets when computing MTTFd.

#### Common mistakes

**Body:** Treating the category as the PL is the most frequent error. Category is only one input. Another is ignoring validation: ISO 13849-2 expects fault lists and tests. Teams also forget that the PFHd of the safety function is the total of sensor, logic and actuator, not just the safety relay certificate value.

**Cta:** If you store safety function ratings in spreadsheets and want them linked to machine serial numbers and the technical file in your ERP, we can scope that connection.

**Faq:**

#### What PFHd does PL d need?

**Answer:** PL d requires a PFHd of at least 1E-7 and below 1E-6 per hour. That is the same band as SIL 2 for high demand or continuous mode, though the two methods calculate the value differently.

#### Is Category 3 the same as PL d?

**Answer:** No. Category 3 is an architecture, and with suitable MTTFd and diagnostic coverage it can achieve PL d, and in some cases PL e is not reachable. The PL depends on category, MTTFd, DC and CCF together.

#### What is B10d used for?

**Answer:** B10d is the number of cycles at which 10 percent of components fail dangerously. Combined with your operations per year, it gives MTTFd for electromechanical parts such as contactors and valves.

#### Does the Machinery Regulation change this?

**Answer:** Regulation (EU) 2023/1230 replaces the Machinery Directive from January 2027 and adds items such as software and AI related safety aspects, but the core ISO 13849-1 method remains the common route to presumption of conformity. Check the harmonised standards list.

## Search terms

performance level pl d meaning, iso 13849 pfhd table, pl to sil conversion, iso 13849 categories b 1 2 3 4, mttfd low medium high, diagnostic coverage dc bands, pl e vs sil 3, machine safety performance level chart

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
