# ITAR USML Categories Reference Table

> Source: https://netray.co/tools/itar-usml-category-reference-table
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A searchable list of the 21 USML categories, I through XXI, with a plain-language note on what each tends to cover and how to flag it in your ERP.

## Category

compliance-legal

## Industry

Defense Contracting

## Region

United States

## Audience

- Export compliance officer
- Engineer
- ERP item master administrator

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Category

**Key:** cat

**Type:** text

#### USML category title

**Key:** title

**Type:** text

#### Typical coverage (general guidance)

**Key:** note

**Type:** text

#### ERP flag suggestion

**Key:** erp

**Type:** text

**Rows:**

#### Firearms and Related Articles

**Cat:** I

**Note:** Firearms, close assault weapons, combat shotguns and related items

**Erp:** Restrict item and drawings, screen all customers

#### Guns and Armament

**Cat:** II

**Note:** Guns, howitzers, mortars, launchers and related articles

**Erp:** Flag item and technical data

#### Ammunition and Ordnance

**Cat:** III

**Note:** Ammunition, fuze setting devices and related articles

**Erp:** Flag item, storage and shipping holds

#### Launch Vehicles, Guided Missiles, Ballistic Missiles, Rockets, Torpedoes, Bombs, and Mines

**Cat:** IV

**Note:** Missiles, rockets and associated components

**Erp:** Flag item and program-level access

#### Explosives and Energetic Materials, Propellants, Incendiary Agents, and Their Constituents

**Cat:** V

**Note:** Energetic materials and propellants

**Erp:** Flag item, add hazmat and export holds

#### Surface Vessels of War and Special Naval Equipment

**Cat:** VI

**Note:** Warships and special naval equipment

**Erp:** Flag item and drawings

#### Ground Vehicles

**Cat:** VII

**Note:** Military ground vehicles and specially designed components

**Erp:** Flag item and BOM children

#### Aircraft and Related Articles

**Cat:** VIII

**Note:** Military aircraft and specially designed parts

**Erp:** Flag item, BOM and routing documents

#### Military Training Equipment and Training

**Cat:** IX

**Note:** Training equipment, simulators and related technical data

**Erp:** Flag item and software builds

#### Personal Protective Equipment, Shelters, and Related Articles

**Cat:** X

**Note:** Body armour, helmets and related protective items

**Erp:** Flag item and test data

#### Military Electronics

**Cat:** XI

**Note:** Electronic equipment such as radar, countermeasures and C4ISR components

**Erp:** Flag item, firmware and design files

#### Fire Control, Laser, Imaging, and Guidance Equipment

**Cat:** XII

**Note:** Fire control, targeting, night vision and guidance equipment

**Erp:** Flag item and calibration data

#### Materials and Miscellaneous Articles

**Cat:** XIII

**Note:** Certain materials, cryptographic and other listed articles

**Erp:** Flag item and material specification

#### Toxicological Agents, Including Chemical Agents, Biological Agents, and Associated Equipment

**Cat:** XIV

**Note:** Agents and associated equipment

**Erp:** Flag item with additional controls

#### Spacecraft and Related Articles

**Cat:** XV

**Note:** Spacecraft, ground control and specially designed parts

**Erp:** Flag item, drawings and software

#### Nuclear Weapons Related Articles

**Cat:** XVI

**Note:** Articles related to nuclear weapons design and testing

**Erp:** Restrict strictly, involve compliance

#### Classified Articles, Technical Data, and Defense Services Not Otherwise Enumerated

**Cat:** XVII

**Note:** Classified items outside other categories

**Erp:** Handle under classified program rules

#### Directed Energy Weapons

**Cat:** XVIII

**Note:** Lasers, high-power microwave and related systems

**Erp:** Flag item and technical data

#### Gas Turbine Engines and Associated Equipment

**Cat:** XIX

**Note:** Military gas turbine engines and specially designed parts

**Erp:** Flag item, routing and tooling data

#### Submersible Vessels and Related Articles

**Cat:** XX

**Note:** Submersibles and associated equipment

**Erp:** Flag item and drawings

#### Articles, Technical Data, and Defense Services Not Otherwise Enumerated

**Cat:** XXI

**Note:** Catch-all category used after a determination

**Erp:** Flag only on written determination

**Notes:** This table lists category titles for orientation only. Actual control depends on the detailed paragraphs of 22 CFR Part 121 and the specially designed definition. Use a commodity jurisdiction request when jurisdiction is unclear, and consult qualified counsel.

## Content

**Intro:** The United States Munitions List in 22 CFR Part 121 is divided into 21 categories, numbered I through XXI. When someone says an item is ITAR controlled, the first question is which category. This reference lists all 21 for quick lookup and ERP flagging.

**Sections:**

#### How to use the table

**Body:** Search by number or by keyword in the title, such as electronics, aircraft or space. Use the note as orientation to decide which category paragraph to read in the regulation, then record the full citation on the item. The ERP flag column suggests a practical control for each category, for example restricting drawings and screening customers. It is a prompt for discussion with your compliance team, not a ruling.

#### How the USML is organised

**Body:** Each category has an enumerated list of controlled articles, followed by technical data and defence services that relate to them. Many entries use the phrase specially designed, which has its own definition and release paragraphs. Categories VIII, XI, XII and XV are common for aerospace and electronics suppliers, but a single product can be a component of an assembly in a different category.

#### From category to ERP control

**Body:** Put the USML category, or ECCN if the item falls under the EAR, in a controlled attribute on the item master. Use it to drive restricted document access, shipment holds, customer screening and licence checks. Tie child components in a bill of materials to the parent's classification and review them when design changes happen. Keep the decision record in a classification worksheet.

**Bullets:**

- Record category and paragraph on the item
- Block shipment until licence checks pass
- Restrict drawings and models by role
- Review when a design or supplier changes

#### Common mistakes

**Body:** Frequent errors include assuming a commercial part is outside the USML because it is sold publicly, ignoring technical data and software, and classifying only the end item while its specially designed parts are also controlled. Another is copying a category from a customer purchase order without checking. When uncertain, request a commodity jurisdiction determination rather than guessing.

**Cta:** Netray can help carry category and jurisdiction data into your ERP and PLM controls using private, on-prem tooling.

**Faq:**

#### How many USML categories are there?

**Answer:** There are 21 categories, numbered I through XXI, in 22 CFR Part 121. Categories XVII and XXI hold classified items and articles not otherwise enumerated, so they are used differently from the equipment categories.

#### Which USML category covers military electronics?

**Answer:** Category XI, Military Electronics, covers items such as radar, electronic combat equipment and certain communications and C4ISR components. Imaging and fire control equipment fall under Category XII, so check both when working with sensors.

#### How do I know if my part is ITAR controlled?

**Answer:** Read the detailed USML paragraphs, apply the specially designed definition, and document your reasoning. If jurisdiction is unclear, submit a commodity jurisdiction request to the State Department. A supplier label alone is not a determination.

#### Is ITAR the same as the EAR?

**Answer:** No. The ITAR, administered by the State Department, controls items on the USML. The EAR, administered by Commerce, controls other items on the Commerce Control List. An item is generally under one regime or the other, so jurisdiction comes first.

## Search terms

usml categories list, itar usml category table, usml category xi military electronics, united states munitions list categories, itar categories i to xxi, usml category reference, itar item master flag, 22 cfr 121 categories

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
