# JD Edwards User Defined Code Change Log Worksheet

> Source: https://netray.co/tools/jde-user-defined-code-change-log-worksheet
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Track each UDC value you add, change or retire, which environments it has reached, who approved it and why.

## Category

oracle

## Erp

Oracle JD Edwards EnterpriseOne

## Audience

- JDE functional consultant
- JDE CNC administrator
- Business analyst

## Tool

**Kind:** worksheet

**Mode:** editable

**Columns:**

#### Product code

**Key:** product

**Type:** text

#### UDC type

**Key:** udc_type

**Type:** text

#### Code value

**Key:** code

**Type:** text

#### Description

**Key:** desc

**Type:** text

#### Action

**Key:** action

**Type:** select

**Options:**

- Add
- Change
- Retire

#### DV

**Key:** dv

**Type:** select

**Options:**

- Done
- Pending
- N/A

#### PY

**Key:** py

**Type:** select

**Options:**

- Done
- Pending
- N/A

#### PD

**Key:** pd

**Type:** select

**Options:**

- Done
- Pending
- N/A

#### Requested by

**Key:** requester

**Type:** text

#### Reason

**Key:** reason

**Type:** text

**Rows:**

#### 42

**Udc type:** SD

**Code:** RW

**Desc:** Rework return

**Action:** Add

**Dv:** Done

**Py:** Done

**Pd:** Pending

**Requester:** Sales ops

**Reason:** New return reason for rework

#### 00

**Udc type:** UM

**Code:** CS

**Desc:** Case

**Action:** Change

**Dv:** Done

**Py:** Pending

**Pd:** Pending

**Requester:** Inventory

**Reason:** Clarify description

#### 41

**Udc type:** S1

**Code:** T9

**Desc:** Tooling

**Action:** Add

**Dv:** Done

**Py:** Done

**Pd:** Done

**Requester:** Engineering

**Reason:** New stocking category

#### 40

**Udc type:** ST

**Code:** OB

**Desc:** Obsolete

**Action:** Retire

**Dv:** Pending

**Py:** N/A

**Pd:** N/A

**Requester:** Planning

**Reason:** Replaced by a new type

**Totals:**

#### Changes logged

**Key:** code

**Agg:** count

**Format:** integer

**Notes:** Example codes are illustrative. User defined codes are maintained per environment in the control tables, so changes made in one environment do not appear in another until you repeat or migrate them. Use your own product codes and types.

## Content

**Intro:** User defined codes drive dropdowns, validations and business rules across JD Edwards. Because they live in control tables, one environment can drift away from another quietly. A simple change log shows what exists where.

**Sections:**

#### How to use the worksheet

**Body:** Add a row for every UDC value you add, change or retire. Record the product code, UDC type, code value, description and the reason. Then mark the status in each environment as you apply it. Export to Excel for a review meeting, or filter by pending production changes before a go-live.

**Bullets:**

- One row per code value.
- Mark N/A when an environment does not need it.
- Review pending items before each promotion.

#### Why UDCs drift between environments

**Body:** UDC values are stored in the control tables, accessed through the User Defined Codes application P0004A, and the underlying tables are F0004 for types and F0005 for values. Because they are data rather than objects, promoting an OMW project does not carry them across. Teams must migrate them with a data tool or re-enter them, and a missed value shows up as an invalid code or a failed validation in production.

#### Impact of a change

**Body:** Retiring or renaming a code can affect reports, data selection, processing options, order activity rules and interfaces that hard-code the value. Before marking a retire row as done, search objects and integrations for the value and check whether transactions still use it. Prefer a retire date and description change over deleting when history matters.

#### Common mistakes

**Body:** Changing a UDC directly in production without recording it, so the next refresh wipes the change. Adding codes in one environment only. Using a code description to hold business meaning that other systems parse. Keep the log, and make the log part of your promotion checklist.

**Cta:** If UDC and control table drift keeps surprising your go-lives, Netray can discuss a read-only comparison of control data between your JDE environments.

**Faq:**

#### Does an OMW promotion move UDC values?

**Answer:** No. UDC values are data in the control tables, not objects. Plan a separate step to copy them, using your data migration tooling or manual entry, and record it in this log.

#### Which tables hold user defined codes?

**Answer:** Types are held in F0004 and the code values in F0005, with language variants in related tables. The User Defined Codes application P0004A is the normal way to maintain them.

#### Should I delete a retired code?

**Answer:** Often it is safer to keep it and mark it inactive or change its description, because historical transactions may still reference it. Check usage first and follow your data retention rules.

#### What if production and test differ?

**Answer:** Compare the two by exporting each UDC type and diffing the results, then decide which is right. After a refresh from production, the test environment will match production again and local test-only values will be lost.

## Search terms

jde user defined codes log, jd edwards udc change tracking, jde p0004a udc maintenance, jde udc migration between environments, jde udc excel template, jde control table change log, jde f0005 value change

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
