# Job Shop ERP Vendor Demo Script Template

> Source: https://netray.co/tools/job-shop-erp-vendor-demo-script-template
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A scripted demo brief you send to ERP vendors so each shows the same real scenarios from quote to invoice, scored by your team.

## Category

erp-migration

## Industry

Machine Shops

## Audience

- Shop owner
- Operations manager
- ERP selection team

## Tool

**Kind:** template

**Output:** document

**Fields:**

#### Your company

**Key:** company

**Type:** text

**Default:** Lakeside Machine Works

#### Vendor being demoed

**Key:** vendor

**Type:** text

**Default:** Vendor A

#### Demo date

**Key:** demo_date

**Type:** date

**Default:** 2026-11-10

#### Your attendees

**Key:** attendees

**Type:** text

**Default:** Owner, estimator, production manager, bookkeeper, quality lead

#### Shop profile

**Key:** shop_profile

**Type:** textarea

**Default:** 28 employees, 14 CNC machines, high mix low volume, AS9100 customers, about 350 open jobs, one shift.

#### Sample part to use

**Key:** part

**Type:** text

**Default:** NH-20417 Rev C, 6061 bar, turn, mill, anodize

#### Top must-have capabilities

**Key:** must_haves

**Type:** textarea

**Default:** Quote to job conversion, finite scheduling, shop floor data collection, lot traceability, outside processing, QuickBooks or GL integration.

**Blocks:**

#### Scripted Demo Brief for {{vendor}}

**Body:** Prepared by: {{company}}
Demo date: {{demo_date}}
Our attendees: {{attendees}}

Shop profile: {{shop_profile}}

Please use the sample part {{part}} for every scenario. Do not show canned slides in place of the live system.

#### Must-Have Capabilities

**Body:** {{must_haves}}

#### Scenarios to Demonstrate Live

**Table:**

**Columns:**

- #
- Scenario
- Score 1-5
- Notes

**Rows:**

**0:** 1

**1:** Enter an RFQ, build a quote with routing and quantity breaks, send it

**0:** 2

**1:** Convert the quote to a job and print a traveler

**0:** 3

**1:** Load the schedule, move a job, show the effect on due dates

**0:** 4

**1:** Operator clocks on and off at a terminal, records quantity and scrap

**0:** 5

**1:** Send an operation out, create the PO, receive it back

**0:** 6

**1:** Receive material with a heat lot and trace it to a shipped job

**0:** 7

**1:** Ship, invoice and post to the general ledger or accounting package

**0:** 8

**1:** Show estimated versus actual job cost report

#### Commercial Questions

**Body:** Ask for: total first-year cost including licenses, users, hosting, implementation days, training and data conversion; annual renewal terms; support response times; who does the data migration; and what is out of scope.

#### Evaluation

**Signatures:**

- Evaluator
- Owner or sponsor

**Notes:** A starting point. Adjust scenarios to your shop. Send the brief to the vendor several days before the demo and score each vendor on the same scale.

## Content

**Intro:** Vendor demos look the same when the vendor controls the story. A scripted brief makes each vendor, whether JobBOSS, E2 Shop System, Global Shop Solutions, ProShop or Fulcrum, show your scenarios on your sample part.

**Sections:**

#### How to use the script

**Body:** Fill in your shop profile, a real sample part and your top must-have capabilities, then export and send it to each vendor a few days before the demo. During the demo, have each evaluator score every scenario from one to five and write notes. Keep the same scenarios and the same attendees across vendors so the scores are comparable afterwards.

#### Why scenarios beat feature lists

**Body:** Every ERP claims quoting, scheduling and traceability. What matters is how many clicks and how much data entry it takes to do your daily work. A live scenario exposes the difference: a vendor that needs a consultant to build a custom routing on the fly is telling you something about day-to-day use.

**Bullets:**

- Insist on live system, not slides
- Use your own part and a messy real routing
- Include the shop floor view, not just the office
- Ask what is standard and what is customization

#### Scoring and comparing

**Body:** After each demo, total the scores per scenario and weight them by what matters. For many small shops scheduling and shop floor data collection carry more weight than reporting depth. Combine the scores with a cost comparison covering licenses, implementation, training, data conversion and annual support, and with reference calls to shops similar to yours.

#### Common mistakes

**Body:** Letting the vendor demo only the strongest module, skipping the shop floor terminal, and failing to ask who migrates the data are the common errors. Another is judging on price alone and ignoring implementation effort, which for a small shop often costs more than the first year of licenses.

**Cta:** If you are weighing an ERP move and want a neutral second opinion on the shortlist or data migration, Netray can help.

**Faq:**

#### Which vendors does this cover?

**Answer:** It is vendor neutral. The scenarios apply to any job shop ERP, including JobBOSS, E2 Shop System, Global Shop Solutions, ProShop, Fulcrum and others. Change the vendor name in the template for each demo.

#### How many scenarios should I use?

**Answer:** Eight to ten is plenty for a 90 minute to two hour demo. More than that and vendors rush. Prioritize the scenarios where your current process hurts the most.

#### Should I share the sample part with vendors?

**Answer:** Yes, ahead of time, so they can set it up properly. Use a realistic part with a real routing, including an outside process, rather than a simple example.

#### Is this a full RFP?

**Answer:** No. It is a demo brief. For larger selections you may also want a written requirements list and a reference check process. This is the practical part for the demo day itself.

## Search terms

erp demo script template, erp vendor demo scorecard, job shop erp demo checklist, scripted demo erp selection, erp demo questions manufacturing, jobboss e2 global shop demo

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
