# Job Shop Quote Worksheet for Machine Shops

> Source: https://netray.co/tools/job-shop-quote-worksheet
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Quote a machined part operation by operation: setup hours, run minutes per piece, shop rate and material. Totals the cost and shows the price at a target margin.

## Category

manufacturing

## Industry

Job Shop Machining

## Audience

- Estimator
- Shop owner
- Sales engineer

## Tool

**Kind:** worksheet

**Mode:** editable

**Currency:** $

**Columns:**

#### Operation

**Key:** op

**Type:** text

#### Work center

**Key:** wc

**Type:** select

**Options:**

- Saw
- CNC Mill
- CNC Lathe
- Manual Mill
- Deburr
- Inspection
- Outside Process

#### Setup hours

**Key:** setup_hrs

**Type:** number

**Format:** decimal

#### Run min per piece

**Key:** run_min

**Type:** number

**Format:** decimal

#### Quantity

**Key:** qty

**Type:** number

**Format:** integer

#### Shop rate per hour

**Key:** rate

**Type:** number

**Format:** currency

#### Material or outside cost

**Key:** material

**Type:** number

**Format:** currency

#### Setup cost

**Key:** setup_cost

**Type:** number

**Expr:** setup_hrs * rate

**Format:** currency

#### Run cost

**Key:** run_cost

**Type:** number

**Expr:** run_min / 60 * qty * rate

**Format:** currency

#### Line cost

**Key:** line_cost

**Type:** number

**Expr:** setup_hrs * rate + run_min / 60 * qty * rate + material

**Format:** currency

**Rows:**

**Op:** Saw bar stock

**Wc:** Saw

**Setup hrs:** 0.25

**Run min:** 1.5

**Qty:** 100

**Rate:** 55

**Material:** 1150

**Op:** Op 10 mill first side

**Wc:** CNC Mill

**Setup hrs:** 2

**Run min:** 6.5

**Qty:** 100

**Rate:** 95

**Material:** 0

**Op:** Op 20 mill second side

**Wc:** CNC Mill

**Setup hrs:** 1.5

**Run min:** 4.2

**Qty:** 100

**Rate:** 95

**Material:** 0

**Op:** Deburr and clean

**Wc:** Deburr

**Setup hrs:** 0

**Run min:** 1.2

**Qty:** 100

**Rate:** 45

**Material:** 0

**Op:** Anodize

**Wc:** Outside Process

**Setup hrs:** 0

**Run min:** 0

**Qty:** 100

**Rate:** 0

**Material:** 420

**Op:** Final inspection

**Wc:** Inspection

**Setup hrs:** 0.5

**Run min:** 0.8

**Qty:** 100

**Rate:** 65

**Material:** 0

**Totals:**

#### Total setup cost

**Key:** setup_cost

**Agg:** sum

**Format:** currency

#### Total run cost

**Key:** run_cost

**Agg:** sum

**Format:** currency

#### Total material and outside

**Key:** material

**Agg:** sum

**Format:** currency

#### Total job cost

**Key:** line_cost

**Agg:** sum

**Format:** currency

**Summary:**

#### Cost per piece (qty 100)

**Key:** cost_per_piece

**Expr:** sum_line_cost / 100

**Format:** currency

#### Quote price at 25% margin

**Key:** price_25

**Expr:** sum_line_cost / (1 - 0.25)

**Format:** currency

**Primary:** true

#### Quote price at 35% margin

**Key:** price_35

**Expr:** sum_line_cost / (1 - 0.35)

**Format:** currency

**Notes:** Margin pricing divides cost by (1 - margin). A 25% margin is not the same as a 25% markup. Change the quantity on every row together when you quote a different lot size, and set the 'Cost per piece' divisor to match.

## Content

**Intro:** This worksheet builds a machining quote one operation at a time. Each row carries setup hours, run minutes per piece, a shop rate and any material or outside cost, and the tool totals the job and shows the price at a target margin.

**Sections:**

#### How to use the quote worksheet

**Body:** Start with the routing you would run on the floor: saw, mill, lathe, deburr, outside process, inspect. For each operation enter setup hours, run minutes per piece, the lot quantity and the burdened shop rate for that work center. Put bar stock, plate or a heat treat vendor charge in the material column. The tool computes setup cost, run cost and line cost per row, and the footer adds everything up. Edit, add or delete rows freely, then export to Excel to attach to the customer quote or load into your ERP estimate screen.

**Bullets:**

- Use a burdened rate per work center, not one blended shop rate
- Enter setup once per lot, run time per piece
- Put material scrap allowance into the material cost
- Quote each quantity break as its own copy of the sheet

#### The method behind the numbers

**Body:** Line cost equals setup hours times rate, plus run minutes divided by 60 times quantity times rate, plus material. Total job cost is the sum of the lines. Price is cost divided by one minus the target margin. This is the same arithmetic that JobBOSS, E2 Shop System, Global Shop Solutions, ProShop and Fulcrum run in their estimating screens, so a worksheet number should match the ERP quote if the rates and routings are the same. If the two disagree, the difference usually sits in how burden, scrap and overhead are loaded.

#### Reading the result

**Body:** In the sample job, material and the outside anodize make up a large share of cost, while the two mill operations carry most of the labor. Look at the split between setup and run. When setup dominates, a bigger lot size lowers the unit price quickly, so quote two or three quantity breaks. When run dominates, the lever is cycle time and fixturing. Compare the 25% and 35% price lines against what the market will bear before you send the quote.

#### Common mistakes

**Body:** The most expensive quoting errors are quiet ones. Estimators forget first article inspection, certs and packaging, use a rate that excludes tooling and consumables, or reuse run times from a different material. Another frequent error is quoting from the programmer's ideal cycle time instead of the real average including load, unload and chip clearing.

**Bullets:**

- Forgetting deburr, wash, packaging and freight
- Ignoring scrap on small lots
- Applying markup when you meant margin
- Not updating rates after a machine or wage change

**Cta:** If your quotes live in spreadsheets while actual costs live in the ERP, we can help pull historical run times and actuals back into estimating, on your own servers if needed.

**Faq:**

#### What shop rate should I use for the quote?

**Answer:** Use a burdened hourly rate for each work center that includes labor, machine depreciation, power, tooling allowance and a share of overhead. A single blended rate hides the fact that a five axis mill costs far more per hour than a manual saw.

#### Is margin the same as markup?

**Answer:** No. Markup is a percentage added to cost. Margin is a percentage of the selling price. A 25% margin needs cost divided by 0.75, which equals a 33% markup. Mixing them up is one of the most common ways job shops underprice work.

#### Can I use this with JobBOSS, E2 or ProShop quotes?

**Answer:** Yes. Export to Excel and use it as a cross check against the ERP estimate, or as the first draft before you key the routing into the system. The math is standard setup plus run plus material.

#### How do I quote multiple quantities?

**Answer:** Copy the sheet for each quantity break, change the quantity on every row, and keep setup hours the same. The cost per piece should drop as setup is spread over more parts, which is the pricing story to tell the buyer.

## Search terms

job shop quote worksheet, machine shop quote template excel, machining quote calculator, job shop estimating worksheet, how to quote a machining job, cnc quote spreadsheet, job shop pricing worksheet, jobboss quote worksheet

---