# LabWare LIMS AI Assistant Sizing and Value Calculator

> Source: https://netray.co/tools/labware-lims-ai-assistant-sizing-and-value-calculator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Estimate GPUs, tokens per day, index size, hours saved and payback for a private AI assistant on LabWare LIMS.

## Category

on-prem-ai

## Erp

LabWare LIMS

## Industry

Laboratory and Quality

## Audience

- IT architect
- CIO
- Engineering manager
- Finance

## Tool

**Kind:** calculator

**Currency:** $

**Inputs:**

#### Named users

**Key:** users

**Type:** number

**Default:** 150

**Min:** 1

**Step:** 10

**Unit:** users

#### Share who use it on a given day

**Key:** dau

**Type:** slider

**Default:** 35

**Min:** 5

**Max:** 100

**Step:** 1

**Unit:** %

**Help:** Daily active users as a percent of named users. 20 to 50 is common after the first quarter.

#### Questions per active user per day

**Key:** qpd

**Type:** number

**Default:** 5

**Min:** 1

**Step:** 1

**Unit:** questions

#### Average prompt plus answer tokens

**Key:** tokens

**Type:** number

**Default:** 3500

**Min:** 200

**Step:** 100

**Unit:** tokens

**Help:** Includes retrieved context. Retrieval-heavy answers are often 2,000 to 6,000 tokens.

#### Share of daily questions in the busiest hour

**Key:** peak_share

**Type:** slider

**Default:** 20

**Min:** 5

**Max:** 60

**Step:** 1

**Unit:** %

#### Sustained tokens per second per GPU

**Key:** tps

**Type:** number

**Default:** 1500

**Min:** 100

**Step:** 100

**Unit:** tokens/s

**Help:** Aggregate batched throughput for your model and GPU under vLLM. Measure on your hardware; 500 to 3,000 is a wide realistic range.

#### Documents to index

**Key:** docs

**Type:** number

**Default:** 60000

**Min:** 0

**Step:** 1000

**Unit:** documents

#### Average pages per document

**Key:** pages

**Type:** number

**Default:** 12

**Min:** 1

**Step:** 1

**Unit:** pages

#### Minutes saved per question

**Key:** minutes

**Type:** number

**Default:** 6

**Min:** 0

**Step:** 1

**Unit:** minutes

#### Loaded hourly cost of a user

**Key:** rate

**Type:** number

**Default:** 55

**Min:** 0

**Step:** 1

**Unit:** $/hr

#### Monthly cost per GPU

**Key:** gpu_cost

**Type:** number

**Default:** 1800

**Min:** 0

**Step:** 100

**Unit:** $/month

**Help:** Amortized hardware, power, cooling and support. Not a cloud price.

#### One-time build and integration cost

**Key:** impl

**Type:** number

**Default:** 60000

**Min:** 0

**Step:** 5000

**Unit:** $

**Outputs:**

#### Daily active users

**Key:** active

**Expr:** users * dau / 100

**Format:** integer

#### Questions per day

**Key:** questions

**Expr:** active * qpd

**Format:** integer

#### Tokens per day

**Key:** tokens_day

**Expr:** questions * tokens

**Format:** number

#### Peak-hour tokens per second

**Key:** peak_tps

**Expr:** questions * peak_share / 100 * tokens / 3600

**Format:** number

**Description:** Busiest-hour tokens divided by 3,600 seconds.

#### GPUs needed (before redundancy)

**Key:** gpus

**Expr:** max(1, ceil(peak_tps / tps))

**Format:** integer

**Primary:** true

**Description:** Peak tokens per second divided by sustained tokens per second per GPU, rounded up, minimum one. Add one for high availability.

#### Chunks to index

**Key:** chunks

**Expr:** docs * pages * 3

**Format:** number

**Description:** Assumes about 3 chunks per page.

#### Index size

**Key:** index_gb

**Expr:** chunks * (1024 * 4 + 2000) / 1000000000

**Format:** decimal

**Description:** Per chunk: a 1,024-dimension float32 vector plus about 2 KB of text and metadata. Approximate, before index overhead.

#### Hours saved per month

**Key:** hours

**Expr:** questions * 22 * minutes / 60

**Format:** hours

**Description:** 22 working days per month.

#### Monthly value of time saved

**Key:** value

**Expr:** hours * rate

**Format:** currency

#### Monthly GPU cost

**Key:** run_cost

**Expr:** gpus * gpu_cost

**Format:** currency

#### Net monthly value

**Key:** net

**Expr:** value - run_cost

**Format:** currency

**Primary:** true

#### Payback

**Key:** payback

**Expr:** if(gt(net, 0), impl / net, 0)

**Format:** months

**Description:** One-time cost divided by net monthly value. Zero means no payback at these inputs.

**Chart:**

#### Net monthly value vs named users

**Type:** line

**X:** users

**From:** 20

**To:** 600

**Steps:** 30

**Series:**

- net

**Disclaimer:** Planning estimate only. Throughput depends on model, quantization, context length and hardware; measure on your own GPUs. Time saved is an assumption you should validate with a pilot.

## Content

**Intro:** This calculator sizes a private AI assistant for LabWare LIMS: how many GPUs the busiest hour needs, how much index space your documents take, and whether the time saved pays for the build. It uses simple, visible formulas you can check.

**Sections:**

#### How to use it

**Body:** Start with named users and the share who use the assistant on a typical day. Set questions per active user per day from a pilot or from comparable tools. Average tokens per question should include the retrieved context sent to the model, not only the typed question. Then enter the sustained tokens per second you expect per GPU, the number of documents and pages to index, minutes saved per question, and costs. The primary results are GPUs needed and net monthly value, with payback in months.

**Bullets:**

- Use a pilot to replace guesses
- Keep tokens per question realistic for retrieval
- Measure GPU throughput with your own model
- Include only costs you will actually bear

#### Formulas and assumptions

**Body:** Daily active users = named users x active share. Questions per day = active users x questions each. Tokens per day = questions x tokens. Peak tokens per second = questions x busiest-hour share x tokens / 3,600. GPUs = ceil(peak tokens per second / tokens per second per GPU), minimum one. Index size = documents x pages x 3 chunks x (4 KB vector at 1,024 dimensions + 2 KB text). Hours saved = questions x 22 x minutes / 60. Payback = one-time cost / (monthly value - GPU cost).

#### Reading the results

**Body:** For most deployments the GPU count is small, one or two, because peak load is bursty and answers are short compared with training workloads. The index is usually modest, a few gigabytes to a few tens of gigabytes. The sensitive input is minutes saved per question: halve it and see whether payback still works. If it does not, the project may still make sense for risk or compliance reasons, but you should say so honestly. In this context: GxP and 21 CFR Part 11 or Annex 11 where applicable: assistant stays advisory, read-only in phase one, no result entry or approval.

#### Common mistakes

**Body:** Sizing on average load instead of the busiest hour, ignoring retrieved context in the token count, and assuming vendor tokens-per-second figures apply to your model and prompt lengths are the usual errors. Another is counting time saved on questions people would never have asked before. Count only replaced effort, and add a safety factor for growth and for a redundant GPU.

**Bullets:**

- Average instead of peak load
- No redundancy GPU
- Optimistic minutes saved
- Forgetting re-indexing and evaluation time

**Cta:** If you want these numbers checked against your real usage, Netray can run a short pilot on LabWare LIMS and replace the assumptions with measurements.

**Faq:**

#### What tokens per second per GPU should I use?

**Answer:** It depends on model size, quantization, context length and batching. A range of 500 to 3,000 aggregate tokens per second on a single data-center GPU is realistic for mid-size open-weight models under vLLM. Benchmark your own setup before committing.

#### Why does the calculator size for the busiest hour?

**Answer:** Users ask questions in bursts, such as the start of a shift or before a meeting. Sizing on the daily average would leave the system slow when it matters, so the model uses a configurable busiest-hour share of daily questions.

#### Does the index size include the model?

**Answer:** No. Index size covers the vectors and text of your documents only. Model weights are separate: a 14B model at 4-bit is roughly 8 to 10 GB, and a 70B model is several times that.

#### Is the value figure a guaranteed saving?

**Answer:** No. It multiplies questions by minutes saved and hourly cost, all of which are assumptions. Validate minutes saved with a pilot and treat the result as a range, not a promise.

## Search terms

labware lims ai sizing, private ai assistant gpu sizing calculator, on-prem llm users to gpu calculator, ai assistant roi calculator on-prem, tokens per day calculator, vector index size calculator, ai payback calculator manufacturing

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
