# Manufacturing KPI Formula Reference

> Source: https://netray.co/tools/manufacturing-kpi-formula-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A searchable lookup table of the formulas behind common manufacturing and ERP KPIs, with units and typical data sources.

## Category

manufacturing

## Industry

Discrete Manufacturing

## Audience

- Operations manager
- Controller
- Quality engineer

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### KPI

**Key:** kpi

**Type:** text

#### Area

**Key:** area

**Type:** text

#### Formula

**Key:** formula

**Type:** text

#### Unit

**Key:** unit

**Type:** text

#### Typical ERP or MES source

**Key:** source

**Type:** text

**Rows:**

**Kpi:** On-time delivery (OTD)

**Area:** Delivery

**Formula:** Lines shipped on time / lines shipped x 100

**Unit:** %

**Source:** Shipment lines vs promise date

**Kpi:** OTIF

**Area:** Delivery

**Formula:** Lines on time and in full / lines shipped x 100

**Unit:** %

**Source:** Shipment lines, ordered vs shipped qty

**Kpi:** Order fill rate

**Area:** Delivery

**Formula:** Quantity shipped from stock / quantity ordered x 100

**Unit:** %

**Source:** Sales order lines

**Kpi:** Backlog

**Area:** Delivery

**Formula:** Sum of open order line value not yet shipped

**Unit:** currency

**Source:** Open sales order report

**Kpi:** OEE

**Area:** Flow

**Formula:** Availability x Performance x Quality

**Unit:** %

**Source:** MES or machine data

**Kpi:** Availability

**Area:** Flow

**Formula:** Run time / planned production time

**Unit:** %

**Source:** MES downtime log

**Kpi:** Performance

**Area:** Flow

**Formula:** (Ideal cycle time x total count) / run time

**Unit:** %

**Source:** MES counts and standards

**Kpi:** Takt time

**Area:** Flow

**Formula:** Available production time / customer demand

**Unit:** time per unit

**Source:** Demand forecast, shift calendar

**Kpi:** Cycle time

**Area:** Flow

**Formula:** Time to complete one unit at a station

**Unit:** time per unit

**Source:** Routing, MES

**Kpi:** Throughput

**Area:** Flow

**Formula:** Units completed / time period

**Unit:** units per period

**Source:** Production reporting

**Kpi:** Schedule adherence

**Area:** Flow

**Formula:** Jobs completed on scheduled date / jobs scheduled x 100

**Unit:** %

**Source:** Work order dates

**Kpi:** First pass yield (FPY)

**Area:** Quality

**Formula:** Units passing first time / units started x 100

**Unit:** %

**Source:** Inspection or MES counts

**Kpi:** Rolled throughput yield

**Area:** Quality

**Formula:** Product of FPY at each process step

**Unit:** %

**Source:** Step level inspection

**Kpi:** Scrap rate

**Area:** Quality

**Formula:** Scrap quantity / total quantity produced x 100

**Unit:** %

**Source:** Production reporting, scrap transactions

**Kpi:** Defects per million opportunities (DPMO)

**Area:** Quality

**Formula:** Defects / (units x opportunities per unit) x 1,000,000

**Unit:** count

**Source:** Inspection records

**Kpi:** Customer returns rate

**Area:** Quality

**Formula:** Units returned / units shipped x 100

**Unit:** %

**Source:** Returns and RMA records

**Kpi:** Inventory turns

**Area:** Inventory

**Formula:** Cost of goods sold / average inventory

**Unit:** turns per year

**Source:** Income statement, inventory valuation

**Kpi:** Days inventory outstanding (DIO)

**Area:** Inventory

**Formula:** Average inventory / COGS x days in period

**Unit:** days

**Source:** Inventory valuation, COGS

**Kpi:** Inventory accuracy

**Area:** Inventory

**Formula:** Locations counted correct / locations counted x 100

**Unit:** %

**Source:** Cycle count results

**Kpi:** Cash conversion cycle

**Area:** Finance

**Formula:** DIO + DSO - DPO

**Unit:** days

**Source:** Inventory, AR and AP balances

**Kpi:** Purchase price variance (PPV)

**Area:** Cost

**Formula:** (Actual price - standard price) x quantity received

**Unit:** currency

**Source:** Purchase receipts, item standard cost

**Kpi:** Labor efficiency

**Area:** Cost

**Formula:** Standard hours earned / actual hours worked x 100

**Unit:** %

**Source:** Labor reporting, routings

**Kpi:** Gross margin

**Area:** Finance

**Formula:** (Revenue - COGS) / Revenue x 100

**Unit:** %

**Source:** General ledger

**Kpi:** Supplier on-time delivery

**Area:** Supply

**Formula:** Receipts on or before due date / receipts x 100

**Unit:** %

**Source:** Purchase order receipts

**Kpi:** Supplier defect rate (PPM)

**Area:** Supply

**Formula:** Rejected units / received units x 1,000,000

**Unit:** PPM

**Source:** Receiving inspection

**Kpi:** Maintenance MTBF

**Area:** Maintenance

**Formula:** Operating time / number of failures

**Unit:** hours

**Source:** Maintenance work orders

**Kpi:** Maintenance MTTR

**Area:** Maintenance

**Formula:** Total repair time / number of repairs

**Unit:** hours

**Source:** Maintenance work orders

**Notes:** Formulas are standard textbook forms. Your company may define exclusions or windows differently, so record yours in a KPI definition sheet.

## Content

**Intro:** People look up the same manufacturing formulas again and again: OEE, first pass yield, turns, takt time. This table collects the standard forms in one place, with the unit and the ERP or MES source that usually feeds each one.

**Sections:**

#### How to use the reference table

**Body:** Type a KPI name or an area in the search box to filter the table. Each row shows the formula in words, the unit and the typical source system. Export it to Excel or CSV to paste into your own KPI definitions. These are the textbook versions, which are the right starting point for most plants. If your customers or your auditors specify a variant, document it separately rather than editing the standard formula in place.

#### How the KPIs fit together

**Body:** Delivery measures show what the customer feels. Flow and quality measures explain why: OEE combines availability, performance and quality, and rolled throughput yield shows how losses compound across steps. Inventory and cash measures show the financial cost of the way you run, linked by the cash conversion cycle. Choose a small set across these areas rather than many in one, so the dashboard shows cause and effect.

**Bullets:**

- OEE = Availability x Performance x Quality
- Rolled throughput yield multiplies step yields
- Cash conversion cycle = DIO + DSO - DPO

#### Where the data lives

**Body:** Delivery and backlog live in sales order and shipment lines. Flow data comes from MES or from labor and production reporting in the ERP. Quality needs inspection results or scrap transactions. Inventory comes from valuation and cycle count tables. Cost variances come from receipts compared with standard cost. Not every ERP stores each in the same way, so confirm the actual table or report once and record it.

#### Common mistakes

**Body:** Averaging percentages across plants rather than recomputing from totals, using revenue where the formula wants cost of goods sold, and changing the measurement window without telling anyone. With OEE, mixing planned downtime into availability on one line but not another makes comparison meaningless. Always write the exclusions beside the formula.

**Cta:** If you want these KPIs computed from live ERP data by plant and product family, Netray can help build the queries read-only and keep the definitions consistent.

**Faq:**

#### What is the OEE formula?

**Answer:** OEE is availability multiplied by performance multiplied by quality. Availability is run time over planned production time, performance compares ideal and actual output rates, and quality is good units over total units.

#### How is first pass yield different from yield?

**Answer:** First pass yield counts only units that passed without rework or retest. Overall yield may include units that passed after rework, so it can look better than FPY and hide hidden factory cost.

#### What is takt time?

**Answer:** Takt time is available production time divided by customer demand for the same period. It is the pace at which you must produce to meet demand, and it is different from cycle time, which is the time a station actually takes.

#### Can I add my own KPIs to this table?

**Answer:** This table is read-only. Export it to Excel, add your own rows and use the KPI definition template to record the formula, source and owner for any KPI that is specific to your business.

## Search terms

manufacturing kpi formulas, oee formula, first pass yield formula, manufacturing metrics list, kpi formulas cheat sheet, inventory turns formula, takt time formula, production kpi examples

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
