# Material Shortage and Expedite Log Worksheet (Excel Export)

> Source: https://netray.co/tools/material-shortage-expedite-log-worksheet
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

An editable shortage log that totals the value of short material and the days of delay, with export to Excel.

## Category

supply-chain

## Audience

- Materials planner
- Buyer
- Production controller

## Tool

**Kind:** worksheet

**Mode:** editable

**Currency:** $

**Columns:**

#### Part number

**Key:** part

**Type:** text

#### Supplier

**Key:** supplier

**Type:** text

#### Affected job / order

**Key:** job

**Type:** text

#### Short qty

**Key:** short_qty

**Type:** number

#### Unit cost

**Key:** unit_cost

**Type:** number

**Format:** currency

#### Shortage value

**Key:** value

**Type:** number

**Expr:** short_qty * unit_cost

**Format:** currency

#### Impact

**Key:** impact

**Type:** select

**Options:**

- Line down
- Ship date at risk
- Internal date only
- No impact yet

#### Action

**Key:** action

**Type:** select

**Options:**

- Expedite
- Air freight
- Alternate supplier
- Substitute part
- Reschedule job
- Wait

#### Days late

**Key:** days_late

**Type:** number

#### Supplier promise date

**Key:** promise

**Type:** date

**Rows:**

**Part:** BRK-1001

**Supplier:** Kestrel Fasteners

**Job:** J-24081

**Short qty:** 400

**Unit cost:** 1.85

**Impact:** Ship date at risk

**Action:** Expedite

**Days late:** 4

**Promise:** 2026-10-26

**Part:** HSG-2250

**Supplier:** Alder Castings

**Job:** J-24090

**Short qty:** 36

**Unit cost:** 48.2

**Impact:** Line down

**Action:** Air freight

**Days late:** 6

**Promise:** 2026-10-24

**Part:** PCB-7710

**Supplier:** Northgate Electronics

**Job:** J-24102

**Short qty:** 150

**Unit cost:** 12.4

**Impact:** Internal date only

**Action:** Alternate supplier

**Days late:** 2

**Promise:** 2026-10-30

**Part:** SEAL-0412

**Supplier:** Marlow Rubber

**Job:** J-24115

**Short qty:** 800

**Unit cost:** 0.62

**Impact:** No impact yet

**Action:** Wait

**Days late:** 0

**Promise:** 2026-11-02

**Totals:**

#### Total shortage value

**Key:** value

**Agg:** sum

**Format:** currency

#### Worst days late

**Key:** days_late

**Agg:** max

**Format:** days

#### Lines short

**Key:** part

**Agg:** count

**Format:** integer

**Summary:**

#### Average shortage value per line

**Key:** avg_value

**Expr:** sum_value / count

**Format:** currency

**Primary:** true

#### Average days late

**Key:** avg_late

**Expr:** avg_days_late

**Format:** days

**Notes:** Edit any cell, add rows for each short line and delete closed ones. Sort the list by impact before the daily shortage meeting.

## Content

**Intro:** A shortage log is the planner's working list of everything that is late or about to be late. This worksheet keeps the part, the affected job, the money at stake and the agreed action in one table, and exports to Excel for the daily meeting.

**Sections:**

#### How to use the log

**Body:** Add one row per short part per job, not per part overall. A part short on two jobs needs two rows because the impact and the action may differ. Enter the short quantity and unit cost and the sheet computes the shortage value. Pick the impact from the list so the meeting can sort real line-down items to the top. Record the supplier promise date every time it changes, and delete the row only when the receipt is posted in the ERP.

**Bullets:**

- One row per part per affected job
- Update promise dates the day you hear them
- Close rows only after receipt and put-away

#### What the totals tell you

**Body:** Total shortage value shows how much work in process is exposed. Worst days late shows the single biggest slip, and the average days late shows whether the whole list is ageing or only one item is. If the average is rising week after week, the cause is usually systemic: reorder points set too low, lead times in the item master that no longer match reality, or a supplier that has quietly slipped.

#### Pulling the data from your ERP

**Body:** Most ERPs can produce a shortage list. In SAP it comes from the MRP stock requirements list and MD07 or a missing parts report on the production order; in Epicor and SyteLine it comes from job material shortage inquiries; in NetSuite a saved search on work orders with unfulfilled components does the job. Paste the output here, then add the columns your ERP does not hold: impact, action and the promise date you negotiated by phone.

#### Common mistakes

**Body:** Planners often keep shortages in a private spreadsheet that nobody else sees, so buyers duplicate calls and production hears of problems late. Another mistake is logging the action but never the owner or the date. Treat this log as shared: one version, reviewed daily, and every row with an action and a date.

**Cta:** If your shortage list is rebuilt by hand every morning, we can wire it to your ERP data so it refreshes itself. Ask for a short review.

**Faq:**

#### Is this a replacement for the ERP shortage report?

**Answer:** No. The ERP report is the source of truth for what is short. This log adds the human layer: impact, the action taken, the promise date and who owns it. Use the ERP list as input and keep this worksheet as the meeting record.

#### How often should the log be updated?

**Answer:** Daily for plants with short lead times and high mix, at minimum before every shortage meeting. Stale promise dates are the most common reason planners lose trust in the list.

#### Can I add my own columns?

**Answer:** The browser worksheet has fixed columns, but after export to Excel you can add anything: buyer name, PO number, carrier or tracking number. Keep the exported layout so you can re-import the data later.

#### What counts as line down?

**Answer:** Use line down only when production has stopped or will stop within the current shift for lack of the part. Using it too freely makes everything look urgent and the meeting loses its ability to prioritise.