# Lot Acceptance OC Curve Calculator for Medical Device Inspection

> Source: https://netray.co/tools/medical-device-lot-acceptance-oc-curve-calculator
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Shows the chance a lot is accepted at a given defect rate for your sample size and acceptance number, plus average outgoing quality.

## Category

quality

## Industry

Medical Devices

## Audience

- Incoming inspection
- Supplier quality
- Quality engineer

## Tool

**Kind:** calculator

**Inputs:**

#### Sample size

**Key:** n

**Type:** number

**Default:** 80

**Min:** 1

**Step:** 1

**Unit:** units

#### Acceptance number

**Key:** c

**Type:** select

**Default:** 0

**Options:**

##### 0

**Value:** 0

##### 1

**Value:** 1

##### 2

**Value:** 2

#### True lot defect rate

**Key:** p

**Type:** slider

**Default:** 1

**Min:** 0

**Max:** 10

**Step:** 0.1

**Unit:** %

#### Lot size

**Key:** lot

**Type:** number

**Default:** 2000

**Min:** 1

**Step:** 100

**Unit:** units

**Outputs:**

#### Expected defects in sample (n x p)

**Key:** np

**Expr:** n * p / 100

**Format:** decimal

#### Probability of acceptance

**Key:** pa

**Expr:** exp(0 - np) * (1 + gte(c, 1) * np + gte(c, 2) * np * np / 2) * 100

**Format:** percent

**Primary:** true

**Description:** Poisson approximation for c from 0 to 2.

#### Probability of rejection

**Key:** reject

**Expr:** 100 - pa

**Format:** percent

#### Average outgoing quality

**Key:** aoq

**Expr:** p * pa / 100 * (1 - min(1, n / lot))

**Format:** percent

**Primary:** true

**Description:** Assumes rejected lots are 100% sorted and defects removed.

**Chart:**

#### Probability of acceptance vs lot defect rate

**Type:** line

**X:** p

**From:** 0

**To:** 10

**Steps:** 40

**Series:**

- pa

**Disclaimer:** Poisson approximation, accurate when the sample is small relative to the lot and the defect rate is low. Use exact hypergeometric or binomial values for small lots or high defect rates.

## Content

**Intro:** An operating characteristic curve shows how well a sampling plan separates good lots from bad ones. This calculator gives the chance of accepting a lot at any defect rate for plans with an acceptance number of zero, one or two, and estimates the average outgoing quality.

**Sections:**

#### How to use it

**Body:** Enter your sample size, choose the acceptance number and set the assumed true defect rate of the lot. The tool reports the probability of acceptance and rejection and the average outgoing quality. The chart plots the full curve across defect rates from 0 to 10%, which is how you see the consumer's risk at a defect rate you cannot tolerate and the producer's risk at a rate you consider good.

#### The math

**Body:** With a defect rate p and sample size n, the number of defects in the sample is approximately Poisson with mean np. For acceptance number zero, the probability of acceptance is e to the minus np. For one it adds np, and for two it adds np squared over two, all multiplied by e to the minus np. AOQ approximates p times Pa times the unsampled fraction of the lot.

**Bullets:**

- c = 0: Pa = exp(-np)
- c = 1: Pa = exp(-np) x (1 + np)
- c = 2: Pa = exp(-np) x (1 + np + np^2 / 2)
- AOQ = p x Pa x (1 - n / N)

#### Common mistakes

**Body:** A plan with c equal to zero feels strict but can still accept bad lots when the sample is small. At a 1% defect rate, a sample of 80 accepts about 45% of the time. Many teams expect sampling to guarantee a defect-free lot, but it only controls risk. Critical characteristics should rely on process validation and 100% inspection or verified automation, not on sampling alone.

**Cta:** If your inspection plans and lot disposition live in the ERP, we can help review how to calculate risk and apply the right plan by item and supplier.

**Faq:**

#### What is the consumer's risk?

**Answer:** It is the probability of accepting a lot whose quality is at or worse than an unacceptable level. On the OC curve, it is the acceptance probability at that defect rate. Lower it by increasing sample size or lowering the acceptance number.

#### Why does c = 0 have such a steep curve?

**Answer:** With zero acceptance, any single defect rejects the lot, so acceptance falls quickly as the defect rate rises. The curve still has a tail, so poor lots can pass when the sample is small.

#### How does this relate to AQL tables?

**Answer:** AQL tables, such as the ANSI/ASQ Z1.4 family, are pre-built plans with defined OC curves. This tool lets you see the curve of any n and c, including custom plans such as those from validation protocols.

#### When should I use hypergeometric instead?

**Answer:** When the sample is more than about ten percent of the lot, or the lot is small. The Poisson shortcut overstates the chance of finding a defect in those cases, so use an exact calculation.

## Search terms

OC curve calculator, operating characteristic curve sampling plan, probability of acceptance calculator, acceptance sampling c=0, AOQ calculator, incoming inspection sampling risk, lot acceptance probability, consumer risk producer risk

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
