# AD and Service Bulletin Compliance Tracker Worksheet

> Source: https://netray.co/tools/mro-ad-sb-compliance-tracker-worksheet
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Track recurring AD and SB items by interval, last done and current flight hours, with remaining hours calculated for each line.

## Category

aerospace-defense

## Industry

Aerospace MRO

## Audience

- Continuing airworthiness manager
- Maintenance planner
- Records clerk

## Tool

**Kind:** worksheet

**Mode:** editable

**Columns:**

#### AD or SB ref.

**Key:** ref

**Type:** text

#### Subject

**Key:** subject

**Type:** text

#### Type

**Key:** type

**Type:** select

**Options:**

- AD
- SB
- Alert SB
- Manufacturer letter

#### Recurrence

**Key:** recur

**Type:** select

**Options:**

- One-time
- Repetitive

#### Interval

**Key:** interval

**Type:** number

**Unit:** FH

#### Done at

**Key:** last

**Type:** number

**Unit:** FH

#### Current

**Key:** current

**Type:** number

**Unit:** FH

#### Remaining

**Key:** remaining

**Type:** number

**Expr:** interval - (current - last)

**Unit:** FH

**Format:** number

#### Calendar limit

**Key:** next_date

**Type:** date

**Rows:**

**Ref:** AD-EXAMPLE-01

**Subject:** Elevator hinge inspection

**Type:** AD

**Recur:** Repetitive

**Interval:** 600

**Last:** 4100

**Current:** 4550

**Next date:** 2027-03-15

**Ref:** AD-EXAMPLE-02

**Subject:** Fuel pump connector check

**Type:** AD

**Recur:** Repetitive

**Interval:** 1000

**Last:** 3800

**Current:** 4550

**Next date:** 2027-08-01

**Ref:** SB-EXAMPLE-03

**Subject:** Cabin pressure valve modification

**Type:** SB

**Recur:** One-time

**Interval:** 5000

**Last:** 0

**Current:** 4550

**Next date:** 2028-01-10

**Ref:** AD-EXAMPLE-04

**Subject:** Wing spar fitting eddy current

**Type:** AD

**Recur:** Repetitive

**Interval:** 400

**Last:** 4300

**Current:** 4550

**Next date:** 2026-12-20

**Totals:**

#### Lowest remaining FH

**Key:** remaining

**Agg:** min

**Format:** number

#### Items tracked

**Key:** ref

**Agg:** count

**Format:** integer

**Summary:**

#### Tightest item (FH remaining)

**Key:** tightest

**Expr:** min_remaining

**Format:** number

**Primary:** true

**Notes:** Sample entries use placeholder references, not real directives. Take every requirement and compliance time from the actual directive and your approved maintenance programme.

## Content

**Intro:** Missing a repetitive airworthiness directive inspection is a serious compliance failure. This worksheet gives planners a simple remaining-hours view per item to catch the tight ones early.

**Sections:**

#### How to use the tracker

**Body:** Add each applicable AD or service bulletin on its own row with the reference, a short subject, whether it repeats, the interval, the flight hours when it was last done and the current total. Remaining hours calculate for each row. Keep a calendar limit column for items with a time basis, since many directives use hours, cycles or calendar time, whichever comes first. Export to Excel to filter by lowest remaining and review it at every planning meeting.

#### The remaining-time logic

**Body:** For a repetitive item, remaining equals the interval minus the usage accumulated since the last compliance: interval - (current - last). A negative result means the limit has passed. For one-time items, treat the interval as the compliance limit and last as zero. The directive text always governs tolerances, grace periods and the units used.

**Bullets:**

- Keep hours, cycles and calendar limits in separate columns
- Sort ascending by remaining so tight items surface first
- Update the current figure at every utilization update

#### Common mistakes

**Body:** A frequent error is mixing units, for example entering cycles against a flight hour counter. Another is tracking only the original directive and missing a later revision or superseding AD. Do not treat this sheet as the legal record of compliance; the signed maintenance record is. If a fleet is large, move the data into your maintenance information system and use the sheet for spot reviews or small operators.

**Cta:** If compliance data sits in several spreadsheets, we can help consolidate it with your ERP or maintenance system data for one reliable due list.

**Faq:**

#### Does this give me the actual AD requirements?

**Answer:** No. It is only a tracker. Read the directive or bulletin itself for applicability, compliance time, method and any alternative means of compliance.

#### How do I handle cycles and calendar limits?

**Answer:** Add columns or duplicate the row per limit type. Compliance is generally due at whichever limit is reached first, as the directive states.

#### What if remaining goes negative?

**Answer:** That means the interval was exceeded. Stop and check the directive and your records, and escalate to your continuing airworthiness manager immediately.

#### Can I use this for service bulletins?

**Answer:** Yes, for tracking. Service bulletin compliance may be optional or recommended, so note the status and customer decision in your own records.