# NetSuite BOM Revision Change Request Template

> Source: https://netray.co/tools/netsuite-bom-revision-change-request-template
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

A change request for adding a BOM revision in NetSuite: what changes, effective dates, open work order impact and sign-off.

## Category

netsuite

## Erp

NetSuite

## Industry

Discrete Manufacturing

## Audience

- Manufacturing engineer
- NetSuite administrator
- Production planner

## Tool

**Kind:** template

**Output:** document

**Fields:**

#### Company

**Key:** company

**Type:** text

**Default:** Acme Precision Ltd

#### Change request number

**Key:** request_no

**Type:** text

**Default:** ECR-2026-0142

#### Assembly item

**Key:** assembly

**Type:** text

**Default:** ASM-4400 Hydraulic Manifold

#### Bill of materials record

**Key:** bom

**Type:** text

**Default:** BOM-4400

#### Current revision

**Key:** old_rev

**Type:** text

**Default:** Rev B

#### New revision

**Key:** new_rev

**Type:** text

**Default:** Rev C

#### Effective start date

**Key:** effective

**Type:** date

**Default:** 2026-11-02

#### Reason for change

**Key:** reason

**Type:** textarea

**Default:** Supplier discontinued the O-ring part. Replace with the equivalent fluorocarbon seal and update the quantity per.

#### Component changes

**Key:** changes

**Type:** textarea

**Default:** Remove: SEAL-110 (qty 2)
Add: SEAL-215 (qty 2)
Change: BOLT-M8 qty per from 4 to 6

#### Open work order impact

**Key:** wo_impact

**Type:** select

**Options:**

- No open work orders
- Open work orders finish on old revision
- Open work orders move to new revision
- Review each work order

**Default:** Open work orders finish on old revision

#### Cost impact

**Key:** cost_impact

**Type:** text

**Default:** Estimated material cost increase of 1 to 2 percent per unit; standard cost update required.

**Blocks:**

#### BOM Revision Change Request

**Body:** Company: {{company}}
Request number: {{request_no}}
Assembly: {{assembly}}
BOM record: {{bom}}

#### Revision

**Body:** Current revision: {{old_rev}}
New revision: {{new_rev}}
Effective start date: {{effective}}

#### Reason for change

**Body:** {{reason}}

#### Component changes

**Body:** {{changes}}

#### Impact

**Body:** Open work orders: {{wo_impact}}
Cost impact: {{cost_impact}}

#### Implementation steps

**Table:**

**Columns:**

- Step
- Owner
- Done

**Rows:**

**0:** Create new BOM revision with effective dates

**0:** Set old revision obsolete date

**0:** Update routing if operations change

**0:** Review open work orders and planned orders

**0:** Update standard or planned cost if used

**0:** Communicate change to planning and shop floor

#### Approvals

**Signatures:**

- Design engineer
- Manufacturing engineer
- Quality
- Production planning
- NetSuite administrator

**Notes:** Starting point for your change control. In NetSuite, revisions are created on the Bill of Materials record and each has effective start and obsolete dates. Verify how your account handles work order revision selection before relying on the open work order choice.

## Content

**Intro:** NetSuite stores component lists as a bill of materials with dated revisions, so a change is not complete until the effective dates and open work orders are handled. This form walks through that decision on one page.

**Sections:**

#### How to use the form

**Body:** Enter the assembly, the BOM record and the current and new revision names. List every component change as add, remove or change, with quantities. Set the effective start date and choose how open work orders will be treated. Collect signatures before the revision is created in NetSuite so the record always has an approved paper trail behind it.

**Bullets:**

- One form per revision, not per component
- List adds, removals and quantity changes separately
- State the effective date explicitly
- Record the cost effect, even as an estimate

#### How NetSuite handles revisions

**Body:** A bill of materials in NetSuite can have multiple revisions, each with an effective start date and an optional obsolete date, and an assembly item can use a revision for new work orders based on date. Work orders keep the revision they were created with unless you change them, which is why the open work order decision matters. Check whether your setup uses revision control and how planning treats future revisions.

#### Downstream effects

**Body:** A BOM change can affect more than production. Planned orders from supply planning, standard costs, purchase demand and the component picking list all derive from it. If routings change at the same time, record that. If a new component requires a purchase item, confirm it exists and has a preferred vendor before the effective date arrives.

#### Common mistakes

**Body:** Editing the live revision instead of adding a new one loses history. Setting the effective date in the past can alter results for orders already planned. Forgetting to obsolete the old revision lets both be valid on the same date. Always test the new revision in a sandbox by creating a work order against it and reading the component list.

**Cta:** For teams drowning in engineering changes, Netray can discuss AI-assisted impact lists from your NetSuite BOM and work order data.

**Faq:**

#### Should I edit the existing BOM revision?

**Answer:** Only for corrections. For a real engineering change add a new revision with its own effective date. That keeps history so you can explain what built an older work order.

#### What happens to open work orders?

**Answer:** Work orders are generally created with the revision valid at that time. Decide per change whether they finish on the old revision or are updated, and record it here so planners act consistently.

#### Do I need approvals for every revision?

**Answer:** Your quality system decides. Aerospace and medical manufacturers usually need engineering and quality sign-off for each change. Smaller shops may tier approvals by risk.

#### Where should the signed form be stored?

**Answer:** Attach it to the BOM record or store it in your document system under the change request number so it can be found during an audit.

## Search terms

netsuite bom revision change request, netsuite bill of materials change form, netsuite bom revision effective date, netsuite engineering change template, netsuite bom change checklist, netsuite assembly item revision, netsuite eco form template, netsuite work order bom revision

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json