# Optical Coating Types and Typical Performance Reference

> Source: https://netray.co/tools/optical-coating-types-and-performance-reference
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Compare common optical coatings by operating band, typical reflectance or transmission, strengths and limitations before you write a purchase spec.

## Category

industry-templates

## Industry

Photonics and Optics

## Audience

- Optical engineer
- Coating engineer
- Buyer
- Quality engineer

## Tool

**Kind:** worksheet

**Mode:** reference

**Columns:**

#### Coating

**Key:** coating

**Type:** text

#### Function

**Key:** kind

**Type:** text

#### Typical operating band

**Key:** band

**Type:** text

#### Typical performance (approximate)

**Key:** perf

**Type:** text

#### Strength

**Key:** strength

**Type:** text

#### Limitation

**Key:** limit

**Type:** text

**Rows:**

**Coating:** Single-layer MgF2 AR

**Kind:** Antireflection

**Band:** Visible, centred near 550 nm

**Perf:** About 1.0 to 1.5 percent residual reflectance per surface on glass

**Strength:** Low cost, durable

**Limit:** Narrow band, not enough for demanding systems

**Coating:** V-coat (two-layer AR)

**Kind:** Antireflection

**Band:** Single laser line, for example 532 nm or 1064 nm

**Perf:** Below 0.25 percent reflectance per surface at design wavelength

**Strength:** Very low loss at one line

**Limit:** Rises quickly away from design wavelength

**Coating:** Broadband AR (BBAR)

**Kind:** Antireflection

**Band:** Typically 400 to 700 nm or 650 to 1050 nm

**Perf:** Average below 0.5 percent per surface across band

**Strength:** Works across a spectral band

**Limit:** Slightly higher loss than a V-coat at one line

**Coating:** Dual-band AR

**Kind:** Antireflection

**Band:** Two lines, for example 532 nm and 1064 nm

**Perf:** Low reflectance at both design lines

**Strength:** Handles harmonics and pilot beams

**Limit:** More layers and cost

**Coating:** Infrared AR on Ge or ZnSe

**Kind:** Antireflection

**Band:** LWIR 8 to 12 um or CO2 10.6 um

**Perf:** Below 1 percent per surface vs more than 30 percent uncoated on germanium

**Strength:** Essential for high-index IR materials

**Limit:** Soft substrates, handle with care

**Coating:** Hard carbon (DLC) AR

**Kind:** Antireflection and protection

**Band:** Infrared windows

**Perf:** Moderate reflectance reduction with high abrasion resistance

**Strength:** Rugged outer surface for exposed IR optics

**Limit:** Not suited to visible optics

**Coating:** Protected aluminum mirror

**Kind:** Metal mirror

**Band:** UV to far IR, 250 nm to 20 um range

**Perf:** About 85 to 92 percent in visible, lower near 800 nm dip

**Strength:** Broadband and low cost

**Limit:** Lower damage threshold, dip near 800 nm

**Coating:** Enhanced aluminum mirror

**Kind:** Metal mirror with dielectric boost

**Band:** Visible, 400 to 700 nm

**Perf:** Often above 95 percent average

**Strength:** Higher visible reflectance than plain aluminum

**Limit:** Narrower band than protected aluminum

**Coating:** Protected silver mirror

**Kind:** Metal mirror

**Band:** Visible to NIR, about 400 nm to 2 um

**Perf:** About 95 to 98 percent average

**Strength:** Highest broadband reflectance in the visible and NIR

**Limit:** Needs a good protective overcoat, poor below 400 nm

**Coating:** Protected gold mirror

**Kind:** Metal mirror

**Band:** About 700 nm to 20 um

**Perf:** About 96 to 99 percent in the infrared

**Strength:** Excellent infrared reflectance

**Limit:** Poor below about 600 nm, soft

**Coating:** UV-enhanced aluminum mirror

**Kind:** Metal mirror

**Band:** About 250 to 450 nm

**Perf:** Above 85 percent in the UV band

**Strength:** Best metallic option for UV

**Limit:** Fluoride overcoats are moisture sensitive

**Coating:** Dielectric laser line mirror

**Kind:** High reflector

**Band:** Narrow, for example 532 nm or 1064 nm

**Perf:** Above 99.5 to 99.9 percent at design angle

**Strength:** Very high reflectance and high damage threshold

**Limit:** Narrow band, angle and polarisation dependent

**Coating:** Broadband dielectric mirror

**Kind:** High reflector

**Band:** Typically 400 to 750 nm or 750 to 1100 nm

**Perf:** Above 99 percent average across band

**Strength:** High reflectance across a useful band

**Limit:** Narrower than metals, polarisation splits at large angles

**Coating:** Ultrafast dielectric mirror

**Kind:** High reflector with dispersion control

**Band:** Centred near 800 nm or 1030 nm

**Perf:** Above 99 percent with controlled group delay dispersion

**Strength:** Keeps femtosecond pulses short

**Limit:** Specialist and expensive

**Coating:** Beamsplitter coating (50/50)

**Kind:** Partial reflector

**Band:** Visible or NIR band at 45 degrees

**Perf:** Splits near 50 percent reflect and 50 percent transmit

**Strength:** Common interferometer part

**Limit:** Polarisation dependence

**Coating:** Polarising beamsplitter coating

**Kind:** Polarisation selective

**Band:** Laser line or band at 45 degrees

**Perf:** Transmits P and reflects S with high extinction on transmit

**Strength:** Used in isolators and attenuators

**Limit:** Angle and wavelength sensitive

**Coating:** Bandpass filter coating

**Kind:** Spectral filter

**Band:** Narrow, tens of nm wide or less

**Perf:** Peak transmission often 85 to 95 percent

**Strength:** Isolates a line or band

**Limit:** Centre wavelength shifts with angle of incidence

**Coating:** Longpass or shortpass edge filter

**Kind:** Spectral filter

**Band:** Cut-on or cut-off edge at design wavelength

**Perf:** High transmission on pass side with OD 4 to 6 blocking possible

**Strength:** Fluorescence and laser rejection

**Limit:** Edge steepness varies with design

**Notes:** Performance values are typical catalogue ranges for guidance only. Real performance depends on substrate, angle of incidence, polarisation, design wavelength and process. Use your coating supplier curves and a measured witness sample for acceptance.

## Content

**Intro:** This table compares the optical coatings you meet in photonics purchasing, grouped by function: antireflection, metal mirrors, dielectric mirrors, beamsplitters and filters. It helps you choose the right type, and write a spec with the right band, angle and durability requirement.

**Sections:**

#### How to choose a coating

**Body:** Start with the job: reduce reflection, reflect light, split a beam, or select a band. Then fix the wavelength band, the angle of incidence and the polarisation, because dielectric designs are optimised for specific values. Finally check the power: high-power and pulsed lasers need coatings with a proven laser-induced damage threshold, and metal coatings absorb more than dielectrics.

**Bullets:**

- Single line laser: V-coat or dielectric laser line mirror
- Wide spectrum imaging: BBAR or protected silver or aluminum
- Infrared: gold mirrors and IR AR on germanium or ZnSe
- Ultrashort pulses: dispersion-controlled mirrors

#### Metal versus dielectric mirrors

**Body:** Metal mirrors work over a very wide band and are less sensitive to angle, which makes them good for general instruments and infrared. Dielectric mirrors stack many thin layers with alternating index to reach very high reflectance over a designed band, and tolerate far higher laser power. A V-coat or laser line mirror at 1064 nm may reach about 99.9 percent, but only near its design angle. A silver mirror reaches high average reflectance in the visible but absorbs the rest as heat.

#### What to put in a coating specification

**Body:** A good coating spec states substrate, surface, wavelength or band, angle of incidence, polarisation, target reflectance or transmission, laser power or damage threshold if relevant, environmental durability class and surface quality after coating. Reference ISO 9211 for definitions and durability testing, and ask for a witness sample or measured spectrum with the shipment. Without these details the supplier will quote against a catalogue standard and acceptance becomes a disagreement.

#### Common mistakes

**Body:** Buying a visible AR coating for a near-infrared laser, or the reverse, is the classic error. Another is ignoring the angle shift: bandpass and dielectric designs move toward shorter wavelength as the angle increases. People also forget that a 1 percent loss per surface across ten surfaces removes nearly 10 percent of the light. Record coating codes on the ERP item so reorders match exactly.

**Cta:** If coating specs and certificates are scattered across item masters, drawings and supplier emails, we can help you build a private assistant over that data in your ERP. Contact us to talk about your setup.

**Faq:**

#### What is a V-coat?

**Answer:** A V-coat is a simple antireflection coating, usually two layers, optimised for a single wavelength. Its reflectance curve looks like a V with a sharp minimum at the design wavelength, often below 0.25 percent per surface. It is the standard choice for laser lines but performs poorly away from that wavelength.

#### Should I choose a silver, aluminum or gold mirror?

**Answer:** Protected silver gives the best visible and near-infrared reflectance, aluminum covers the widest range including the ultraviolet, and gold is best from about 700 nm into the far infrared. Dielectric mirrors beat all three at a single band and high power.

#### Why does a bandpass filter change wavelength when tilted?

**Answer:** In a thin-film interference coating the optical path through each layer shortens as the angle of incidence grows, so the pass band shifts toward shorter wavelengths. The shift is small near normal incidence but grows quickly beyond about 10 degrees, so specify the angle.

#### How do I verify a coating on receipt?

**Answer:** Ask for the supplier measured spectrum or a witness sample, and check the reflectance or transmission at your design wavelength with a spectrophotometer. Also inspect the surface for scratches, haze, pinholes and delamination against the drawing requirement.

## Search terms

optical coating types, antireflection coating wavelength, dielectric mirror vs metal mirror, protected silver mirror reflectance, gold mirror infrared reflectance, v coat laser line coating, bbar coating meaning, aluminum mirror reflectance

---
Talk to an engineer: https://netray.co/contact?intent=erp_ai | Machine catalog: https://netray.co/agent/catalog.json
