# Oracle EBS Engineering Change Order (ECO) Request Template

> Source: https://netray.co/tools/oracle-ebs-ecn-change-order-request-template
> Publisher: Netray (netray.co), AI and integration engineering for ERP and manufacturing systems.
> Section: Free Tools

## Short answer

Fill-in change request that captures what changes, which BOMs and routings are affected, effectivity, and approval signatures before you create the ECO in Oracle Engineering.

## Category

oracle

## Erp

Oracle E-Business Suite

## Industry

Discrete Manufacturing

## Audience

- Design engineer
- EBS consultant
- Configuration manager

## Tool

**Kind:** template

**Output:** document

**Fields:**

#### Company

**Key:** company

**Type:** text

**Default:** Acme Precision Ltd

#### Change number

**Key:** eco_no

**Type:** text

**Default:** ECO-2026-0147

#### Change title

**Key:** title

**Type:** text

**Default:** Replace seal kit on valve assembly

#### Change type

**Key:** type

**Type:** select

**Options:**

- Design change
- Supplier change
- Cost reduction
- Quality fix
- Regulatory

**Default:** Quality fix

#### Priority

**Key:** priority

**Type:** select

**Options:**

- Low
- Medium
- High
- Urgent

**Default:** High

#### Primary item

**Key:** item

**Type:** text

**Default:** AS-10045

#### Revision from

**Key:** rev_from

**Type:** text

**Default:** B

#### Revision to

**Key:** rev_to

**Type:** text

**Default:** C

#### Effective date

**Key:** effective

**Type:** date

**Default:** 2026-11-15

#### Existing stock disposition

**Key:** disposition

**Type:** select

**Options:**

- Use up
- Rework
- Scrap
- Return to supplier

**Default:** Use up

#### Requested by

**Key:** requester

**Type:** text

**Default:** Design engineering

#### Description of change

**Key:** description

**Type:** textarea

**Default:** Replace seal kit SK-210 with SK-215 to remove field leak issue found in complaint investigation. Update the BOM and the assembly work instruction.

#### Reason and evidence

**Key:** reason

**Type:** textarea

**Default:** Three field returns in the last quarter traced to seal wear. Supplier test report attached.

**Blocks:**

#### Engineering Change Request

**Body:** Company: {{company}}
Change number: {{eco_no}}
Title: {{title}}
Type: {{type}}
Priority: {{priority}}
Requested by: {{requester}}

#### Description

**Body:** {{description}}

Reason and evidence:
{{reason}}

#### Revision and effectivity

**Body:** Primary item: {{item}}
Revision: {{rev_from}} to {{rev_to}}
Effective date: {{effective}}
Existing stock: {{disposition}}

#### Affected objects

**Table:**

**Columns:**

- Object
- Identifier
- Action
- Owner

**Rows:**

**0:** Bill of material

**1:** {{item}}

**2:** Add and disable components

**0:** Routing

**0:** Work instruction or drawing

**0:** Supplier or purchasing

**0:** Open jobs

#### Approvals

**Signatures:**

- Engineering
- Quality
- Manufacturing
- Purchasing
- Change control board

**Notes:** A starting point for your change control procedure, not an official Oracle form. Adjust fields to your quality system and the ECO workflow configured in your EBS instance.

## Content

**Intro:** Engineering change orders in Oracle Engineering work best when the business case and affected objects are agreed before the ECO is keyed. This request template captures them so the change control board can decide quickly.

**Sections:**

#### How to use the template

**Body:** Complete the header, describe the change and the evidence, then state the revision and effectivity. List every object that must change: bills of material, routings, drawings, work instructions and supplier arrangements. Export as PDF for the change board. Once approved, create the ECO in Oracle with the same change number and attach this document for traceability.

**Bullets:**

- State what changes and why in plain language
- Decide disposition of existing stock before approval
- Name an owner for every affected object

#### How effectivity works

**Body:** In Oracle, an ECO schedules changes to a bill of material or item revision on an effective date. Components can be added, disabled or changed in quantity, and open jobs may or may not pick up the change depending on how you manage them. Agree whether the change applies by date, by lot or serial number range, or from a specific job, and record that decision here so production and purchasing know the cut-in point.

#### Choosing the disposition

**Body:** Use up is cheapest when the old part is acceptable until depleted. Rework or scrap is necessary when the old design is unsafe or non-conforming. Return to supplier applies to purchased parts that are still returnable. Whichever you pick, ask planning to adjust purchase orders and safety stock so you do not buy the old component after the cut-in date.

#### Common mistakes

**Body:** Changes fail when affected routings and work instructions are forgotten, when open jobs keep issuing the old component, or when suppliers learn about the change late. For regulated products such as aerospace or medical, record approvals and evidence carefully because they are part of configuration control. Do not reuse a change number for a different change, and close the ECO promptly after implementation.

**Cta:** If you want ECO status, affected items and open job impact visible from your ERP data, Netray can design a private reporting layer.

**Faq:**

#### Is ECO the same as ECN?

**Answer:** In practice the terms overlap. Some companies use ECR for a request, ECO for the authorised order, and ECN for the notice sent out. Oracle Engineering uses engineering change orders. Align the wording with your own procedure.

#### Does this create the ECO in Oracle?

**Answer:** No. It is a request and approval document. After approval an engineer keys the ECO in Oracle Engineering or loads it using your normal method.

#### What should be attached?

**Answer:** Drawings, test reports, complaint data, supplier quotations and any risk assessment. Attach whatever the change board needs to decide without calling you.

#### How do open jobs get handled?

**Answer:** Decide per job whether to complete on the old revision, rework, or reissue. Record the decision in the affected objects table so production and planning act consistently.

## Search terms

oracle ebs engineering change order template, oracle eco request form, engineering change request template, oracle engineering change order process, bom change request form, ecn form oracle

---